Loading...
Northlake 635(5)-LR000724 ONCRETE COMPRE('N IVE STRENGTH TES Date of Service: 06/22/2000 Report No.: 0016352 Client No.: 85229000 Project No.: 9499145~ Client: Services: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell £ 1221 S. 13 Coppell, Obtain samples of fi-esh concrete at the placement locations, perform requir~ compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5.0" Max 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below' PROJECT DATA M,Xl.D.: 9351 PLACEMENT DATE: lIME SAMPLED: 5:30am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 2 AIR CONTENT (%): 3.3 PLACEMENT LOCATION: Paving 06/22/200.0 BY: El' Cloudy 73 F cc TICKE] UNIq REPORT OF TESTS AC( CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) I I 5.75 06/29/2000 7 106630 I 2 5.75 06/29/2000 7 107940 Average 1 3 5.75 07/20/2000 28 124640 I 4 5.75 07/20/2000 28 121120 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 0ILL Page I of 10 ENGINEERING, INC. a division ofl~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/24/2000 )mmerce Center eltline (Bldg. A) ['exas field test and cast BATCH TIME: 4:50am in Farris NCRETE: 81 F 'NO: 611028 'WEIGHT(pc~: N/A :UMULATIVE YARDS: 30 OMPRESSIVE STRENGTH (psi) 3770 3820 3800 4410 4280 4350 FRACTURE TYPE :en approval of HBC Engineering, Inc. Report No.: 0016352 Sample location: 10 Yards S of island at SE corner of N wing on build yards E of expansion joint 0ILL lng B, 10 This report is exclusively for the use or'the client indicated above and shall ~ot be reproduced except in full without the wri~ Page 2 of 10 ten approval of HBC Engineering, Inc. CONCRETE COMPRE MVE STRENGTH TES ' Date of Service: 06/22/2000 Report No.: 0016352 Client No.: 85229000 Project No.: 9499145{ Client: Services: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell ( 1221 S. E Coppell, Obtain salnples of fi'esh concrete at the placement locations, perform requir{ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA ~¥.XI.D.: 9351 PLACEMENT DATE: TIME SAMPLED: 6240altl WEATHER CONDITIONS: TEMPERATURE (F)- AIR 75 TRUC~: NO: 655 AIR CONTENT (%): 3.1 PLACEMENT LOCATION: Sec page I 06/22/2000 BY: Et Cloudy F CC TICKE1 UNY REPORT OF TESTS AC{ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.75 06/29/2000 7 108390 2 2 5.75 06/29/2000 7 112210 Average 2 3 5.75 07/20/2000 28 127260 2 4 5.75 07/20/2000 28 123260 Average This report is exclusively for the use of the clieut indicated above and shall not be reproduced except in full without the wri! 0ILL Page3 of 10 a ~/ivi~ion oflEm 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/24/2000 '.ommerce Center eltline (Bldg. A) ?exas d field test and cast BATCH TIME: 6:00am vin Farris NCRETE: 83 F 'NO: 611038 'WEIGHT (pcf): N/A :UMULATIVE YARDS: 130 ~OMPRESSIVE STRENGTH (psi) 3830 3970 3900 450O 4360 4430 FRACTURE TYPE ten approval of HBC Engineering, Inc. Report No.: 0016352 Sample location: 5 Yards S of first island from E to W in center of p between N wings of buildings A & B 0ILL arking lot This repor~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril Page 4 of 10 ten approval of HBC Eugineering, Inc. CONCRETE COMPREr'"3IVE STRENGTH TES . Date of Service: Client No.: 06/22/2000 85229000 Report No.: 0016352 Project No.: 9499145~ Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell~ 1221 S. ] Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5.0" Max 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA SIIXI.D.: 9351 PLACEMENT DATE: TIME SAMPLED: 7:40am WEATHER CONDITIONS: TEMPERATURE (F)- AIR 76 TRUCK NO: 80 AIR CONTENT (%): 3.6 PLACEMENT LOCATION: See page 1 06/22/200_0 BY: El Cloudy F C¢ TICKE' UNI REPORT OF TESTS CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 1 5.00 06/29/2000 7 l 16600 3 2 5.00 06/29/2000 7 107870 Average 3 3 5.00 07/20/2000 28 127540 3 4 5.00 07/20/2000 28 134900 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 0ILL Page 5 of 10 ENGINEERIlq3, INC. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/24/2OOO ~,ommerce Center ~eltline (Bldg. A) Texas ,,d field test and cast BATCH TIME: 6:54am 'yin Farris ~NCRETE: 86 rNO: 611048 FWEIGItT(pcD: N/A 2UMULATIVE YARDS: 230 :OMPRESSIVE STRENGTH (psi) 4120 3810 3970 4510 4770 4640 FRACTURE TYPE approval of HBC Engineering, Inc. Report No.: Sample 0016352 location: 35' E of island at SE corner of building B,N wing This report is exclusively for the use of the client indicated above and shall ilot be reproduced except in full without the writ :en approval of HBC Eogineering, Inc. OILL Page 6 of I0 CONCRETE COMPRE?3IVE STRENGTH TES Date of Service: 06/22/2000 Report No.: 0016352 Client No.: 85229000 Project No.: 9499145{ Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell ( 1221 S. I~ Coppell, Obtain samples of fl'esh concrete at the placement locations, perform requir4 compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5.0" Max 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: TIME SAMPLED: 8:50am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TatJCK NO: 1029 AIR CONTENT (%): 3.6 PLACEMENT LOCATION: See page I 06/22/2000 BY: El Cloudy 76 F TICKEq lIN[ REPORT OF TESTS ACI CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 4 1 6.00 06/29/2000 7 97810 4 2 6.00 06/29/2000 7 99090 Average 4 3 6.00 07/20/2000 28 122940 4 4 6.00 07/20/2000 28 129430 Average This report is exclusively for the use of the clieut indicated above and shall not be reproduced except in full without the wri! 0ILL Page 7 of 10 ENGINEERING, INC. a division qf'lratractm 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/24/2000 ommerce Center eltline (Bldg. A) Fexas d field test and cast BATCIt TIME: 8:07am yin Farris ,NCRETE: 82 F 'NO: 611059 WEIGHT(pc0: N/A UMULATIVE YARDS: 330 .~OMPRESSIVE STRENGTH (psi) 3460 3500 3480 435O 4580 4470 FRACTURE TYPE Ien approval of HBC Engineering, Inc. Report No.: 0016352 Sample location: 20 Yards S of NE corner of building B, N wing, 5' E This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri! of W curb :en approval of HBC Engineering, Inc. 0ILL Page 8 of 10 CONCRETE COMP IVE STRENGTH TES_ Date of Service: 06/22/2000 Report No.: 0016352 Client No.: 85229000 Project No.: 9499145¢ Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell 1221 S. Coppell, Obtain samples of fi'esh concrete at the placement locations, perform require compressive strength samples. STRENGTlt: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5.0" Max 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIXl. D.: 9351 I'LACEMENT DATE: 06/22/200_0 TIME SAMPLED: 10:35am BY: El WEATHER CONDITIONS: TEMPERATURE IF)- AIR TRUCK NO: 1880 AIR CONTENT (%): 4.1 PLACEMENT LOCATION: See page I Cloudy 81 F C¢ TICKE' UNI' REPORT OF TESTS AO CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 5 I 6.25 06/29/2000 7 86310 5 2 6.25 06/29/2000 7 89140 Average 5 3 6.25 07/20/2000 28 97350 5 4 6.25 07/20/2000 28 103860 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri' 0ILL Page 9 of 10 tt division of'l~fractm 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date O7/24/2OO0 >mmerce Center ,eltline (Bldg. A) I'exas d field test and cast BATCIt TIME: 9:30am ,in Farris qCRETE: 87 V NO: 611070' 'WEIGHT (pcf): N/A 2UMULATIVE YARDS: 440 ~OMPRESSIVE STRENGTH (psi) 3050 3150 3100 3440 3670 3560 FRACTURE TYPE ten approval of HBC Enginee ,r~ Report No.: 0016352 Sample location: 15 Yards S of NW corner of building A, N wing, 5 yar curbs Started: 4:00am Finished: l:00pm ~ (1) City of Coppell (1) City of Coppell E Technician: Ervin Farris Report Distribution: (1) Transwestem Property Company ( 1 ) O'Brien & Associates (l) Tecbnistructures, Inc, (l) Butler Construction Tiffs report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ ~s W of E Engineering, Inc. ugene Harbour Vice President en approval of HBC Engineering, Inc. 0ILL Page 10 of 10