Loading...
Northlake 635(5)-LR000711CONCRETE COMPRE ,$1VE STRENGTH TES. Date of Service: 06/30/2000 Client No.: 85229000 Report No.: 0017145 Project No.: 9499145( Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell ( 1221 S. E Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for location PROJECT DATA MIX ID.: 9351 PLACEMENT DATE: 06/30/2000 TIME SAMPLED: 4:25am BY: El WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 33 AIR CONTENT (%): 3.8 PLACEMENT LOCATION: Paving Cloudy 76 F TICKE~ UNI' REPORT OF TESTS AO CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) I I 5.00 07/07/2000 7 88640 1 2 5.00 07/07/2000 7 90550 Average 1 3 5.00 07/28/2000 28 1 4 5.00 07/28/2000 28 Sample Location: 10 yards E of island at SW corner of Building A, 5 feet S of N curb in parking lot, S side, Building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri! 01SDS Page 1 of 3 a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/2000 ~mmerce'Center eltline (Bldg. A) Fexas d field test and cast BATCH TIME: 3:52am vin Farris ,NCRETE: 86 F NO: 616029 WEIGHT (pcf): N/A 2UMULATIVE YARDS: 30 ~'OMPRESSIVE STRENGTH (psi) 3130 3200 3170 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPResSIVE STRENGTH TES Date of Service: Client No.: Client: Services: 06/30/2000 85229000 Report No.: 0017145 Project No.: 9499145( Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell £ 1221 S. E Coppell, Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTm 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for location PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 06/30/2000 TIME SAMPLED: 5:55am BY: E~ WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 739 AIR CONTENT (%): 3.6 PLACEMENT LOCATION: See page 1 Cloudy 76 E cc TICKEq UNF REPORT OF TESTS AC4 CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 5.00 07/07/2000 7 107380 2 2 5.00 07/07/2000 7 100300 Average 2 3 5.00 07/28/2000 28 2 4 5.00 07/28/2000 28 Sample Location: 5 feet E of island around water main, curb on parking lot, S of Building A. 5 feet N of This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril 01SDS Page 2 of 3 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/20O0 ,mmerce Center eltline (Bldg. A) Fexas field test and cast BATCH TIME: 5:20AM 'in Farris NCRETE: 86 F NO: 616045 WEIGHT (pcf): N/A UMULATIVE YARDS: 130 ~OMPRESSIVE STRENGTH (psi) 3800 3550 3680 FRACTURE TYPE n approval of HBC Engineering, Inc. CONCRETE COMPRE IVE STRENGTH TES? Date of Service: 06/30/2000 Report No.: 0017145 Client No.: 85229000 Project No.: 9499145~ Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppel112 1221 S. B Coppell, Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. ENGINFtRI~, I~ a division of ~'-~tlll 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/2000 ~ommerce Center eltline (Bldg. A) ?exas field test and cast SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for location PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: TIME SAMPLED: 8:30am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1019 AIR CONTENT (%): 3.8 PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 ! 7.00 07/07/2000 7 91690 3 2 7.00 07/07/2000 7 90870 Average 06/30/2000 BY: Er Cloudy 88 F CC TICKEI UNE 3 3 7.00 07/28/2000 28 3 4 7.00 07/28/2000 28 AC( BATCH TIME: 7:26am in Farris NCRETE: 89 F 'NO: 509599 WEIGHT (pcf): N/A UMULATIVE YARDS: 230 :OMPRESSIVE STRENGTH (psi) 3240 3210 3230 FRAC~ ~PE Sample Location: Midway between island at SE corner of Building A ar sewer drain just W of island, 8 feet S of N curb. Technician: Ervin Farris Report Distribution: (1) Transwestern Property Company (1) O'Brien & Associates (1) Technislxuctures, lnc. (1) Butler Construction Started: 3:00am Finished: lh00am (1) City of Coppell (1) city of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl .d Engin~ ,ugene Harbour Vice President approval of HBC Engineering, Inc. 01SDS Page 3 of 3 CONCRETE COMPREo$IVE STRENGTH TES. Date of Service: 06/09/2000 Report No.: 0015169 Client No.: 85229000 Project No.: 9499145~ Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell 1221 S. i Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3-5" AIR: 3-5% TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIME SAMPLED: 4:45am BY: S WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: N/A AIR CONTENT (%): 4.1 PLACEMENT LOCATION: Paving N face of bldg. A & B Cloudy, 74 F o TICKE UNI REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) I 1 5.50 06/16/2000 7 83230 1 2 5.50 06/16/2000 7 76410 Average 1 3 5.50 07/07/2000 28 106130 I 4 5.50 07/07/2000 28 110900 Average Sample location: 20' N x 15' E of N-W corner of bldg. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril 01LL Page 1 of 5 a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/2000 ommerce Center leltline (Bldg. A) Texas '~d field test and cast BATCH TIME: 4:00am ~ane Spinks 'ain )NCRETE: 69 F NO: N/A WEIGHT (pcf): N/A UMULATIVE YARDS: 50 OMPRESSIVE STRENGTH (psi) 2940 2700 2820 3750 3920 3840 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRE oSIVE STRENGTH TES Date of Service: Client No.: Client: Services: 06/09/2000 Report No.: 85229000 Project No.: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 0015169 9499145 Coppell 1221 S. Coppell, Obtain samples of fresh concrete at the placement locations, perform requirl compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: 3-5" AIR: 3-5% TEST MET~IOO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 30' N x 25' W of NW corner of bldg. PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIME SAMPLED: 6:20am BY: S WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 4.6 PLACEMENT LOCATION: See page I Cloudy, 75 v TICKE UN] REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 5.75 06/16/2000 7 121160 2 2 5.75 06/16/2000 7 110310 Average 2 3 5.75 07/07/2000 28 148120 2 4 5.75 07/07/2000 28 148700 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 0ILL Page 2 of 5 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/2000 '.ommerce Center ieltline (Bldg. A) Texas :d field test and cast BATCH TIME: 5:30am aane Spinks 'ain )NCRETE: 70 F NO: N/A 'WEIGHT (pcf): N/A UUMULATIVE YARDS: 150 ~OMPRESSIVE STRENGTH (psi) 4280 3900 4090 5240 5260 5250 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPREoSIVE STRENGTH TES'i Date of Service: 06/09/2000 Client No.: 85229000 Report No.: 0015169 Project No.: 94991451 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell 1221 S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5" 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIME SAMPLED: 8:05am BY: Sl WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 3.8 PLACEMENT LOCATION: Sec page 1 Cloudy, 78 F C~ TICKE' UNI REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 1 6.25 06/16/2000 7 114050 3 2 6.25 06/16/2000 7 108830 Average 3 3 6.25 07/07/2000 28 133500 3 4 6.25 07/07/2000 28 132300 Average Sample location: 30' N x 10' E of NE corner of Bldg B This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 0ILL Page 3 of 5 a aivision of lrt, n-'~t:~an 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/2000 '.ommerce Center ;eltline (Bldg. A) texas d field test and cast BATCH TIME: 7:00am lane Spinks aln )NCRETE: 70 F r NO: N/A r WEIGHT (pcf): N/A CUMULATIVE YARDS: 250 ?~OMPRESSIVE STRENGTH (psi) 4030 3850 3940 4720 4680 4700 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRE?SIVE STRENGTH TES Date of Service: Client No.: Client: 06/09/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0015169 Project No.: 9499145 Project: Coppell 1221 S. CoppelL Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5" 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIME SAMPLED: 10:00am BY: S WEATHER CONDITIONS: Cloudy, TEMPERATURE (F) - AIR 78 F C, TRUCK NO: N/A TICKE AIR CONTENT (%): 3.5 UNI PLACEMENT LOCATION: See page l REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 4 1 6.50 06/16/2000 7 90010 4 2 6.50 06/16/2000 7 94870 Average 4 3 6.50 07/07/2000 28 116600 4 4 6.50 07/07/2000 28 113360 Average Sample location: 30' N x 7' W of NE corner of bldg. This report is exclusively for the use of the client indidated above and shall not be reproduced except in full without the writ 0ILL Page 4 of 5 a aivision of'lran-~s:an 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/2000 ',ommerce Center 5eltline (Bldg. A) Texas '~d field test and cast BATCH TIME: 9:20am aane Spinks 'ain )NCRETE: 70 F NO: N/A WEIGHT (pcf): N/A EUMULATIVE YARDS: 380 2OMPRESSIVE STRENGTH (psi) 3180 3350 3270 4120 4010 4070 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPREo SIVE STRENGTH TES Date of Service: Client No.: Client: Services: 06/09/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 CONTRACTOR: CONCRETE SUPPLIER: PLANT: Report No.: 0015169 Project No.: 9499145~ Project: Coppell ( 1221 S. Copper Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. Butler Construction Pioneer N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5% ASTM C-143 ASTM C-172 ASTM C-39 See below SLUMP: AIR: TEST METHOD: SAMPLE LOCATION: PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIME SAMPLED: ll:20am BY: SI WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 4.0 PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 5 1 7.00 06/16/2000 7 81290 5 2 7.00 06/16/2000 7 87880 Average 5 3 7.00 07/07/2000 28 96070 5 4 7.00 07/07/2000 28 91020 Average Cloudy, 79 F Ct TICKE' UNI Sample location: 20' N x 20' W of NE corner of bldg. B Started: 3:00am Finished: 12:00pm (1) City of Coppell (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr Technician: Shane Spinks Report Distribution: (1) Transwestern Property Company (i) O'Brien & Associates (1) Technislructures, inc. (1) Butler Construction AC~ a division of l~Ifl-~l~ti 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/11/2000 ',ommerce Center ;eltline (Bldg. A) rexas d field test and cast BATCH TIME: 10:45am lane Spinks aln )NCRETE: 73 F r NO: N/A WEIGHT (pcf): N/A UMULATIVE YARDS: N/A :OMPRESSIVE STRENGTH FRACTURE (psi) TYPE 287O 3110 2990 3400 3220 3310 Engineerin . ~,ugene Harbour Vice President en approval of HBC Engineering, Inc. 0ILL Page 5 of 5