Loading...
Northlake 635(5)-LR000706coNCRETE COMPRESSIVE STRENGTH Date of Service: 06/27/2000 Client No.: 85229000 Report No.: 001678~ Project No.: 9499145 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell 1221 S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requit compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS ST~NOTm 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA Mix I.D.: 9351 PLACmmNT DATE: 06/27/2000 TIME SAMPLED: 5:10am BY: S WEATmm coN~rrIONS: Cloudy TEMPERATURE (F) - AIR 72 F c TRUCK NO: 1019 TICK~ Am CONTENT (%): N/A uN PLACEMENT LOCATION: Paving between Buildings A and B Sample taken from tn:ck. REPORT OF TESTS A£ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 6.00 07/04/2000 7 100740 1 2 6.00 07/04/2000 7 105330 Average 1 3 6.00 07/25/2000 28 I 4 6.00 07/25/2000 28 Sample location: 220' N x 40' E from SE corner of bldg. A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ 01LL Page I of 4 ENGINEER~, II~ a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/06/2000 Commerce Center Beltline (Bldg. A) Texas ~d field test and cast BATCH TIME: 4:50am teve Campbell aNCRETE: 78 TNO: 615768 1' WEIGHT (per): N/A :UMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH (psi) 3560 3720 3640 FRACTURE TYPE ten approval ofHBC En~ CONCRETE COMP SIVE STRENGTH Date of Service: Client No.: Client: 06/27/2000 85229000 Transwestern Property Company Atto: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 001671 Project No.: 94991, Project: Coppe 1221 S Coppe Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAM~PLE LOCATION: See below PROJECT DATA M~X I.~.: 9351 PLAC~mVr DATE: 06/27/200 TIME SAMPLED: 5:40am BY: W~R CONDrrmNS: Cloudy TEMPERATUres. 09- Am 72 F TRUCK NO: 1011 TIC]8 Am CONTENT (%): N/A u, PLACEMENT LOCATION: See page 1 Sample taken from Ixuck. REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 6.00 07/04/2000 7 97570 2 2 6.00 07/04/2000 7 100030 Average 2 3 6.00 07/25/2000 28 2 4 6.00 07/25/2000 28 Sample location: 210' N x 80' E from SE corner of Bldg. A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~ 01LL Page 2 of 4 17 ~56 a division 8901 Carp~nt~- Frwy., Suite #100 Dallae: T~a, 75247 Report Date 07/06/2000 Commerce Center Beltline (Bldg. A) 1, Texas ired field test and cast ) BATCH TIME: 5:15am Steve Campbell ~ONCRETE: 81 F ET NO: 615773 ~IT WEIGHT (pcf): N/A CCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH 3450 3540 3500 tten approval of HBC Engineering, Inc. 'CONCRETE COMP SIVE STRENGTH Date of Service: Client No.: Client: Services: 06/27/2000 Report No.: 85229000 Project No.: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 00167: 94991, Coppel 1221 S Coppel Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PriNT: 22 SPECIFICATION REQUIREMENTS STa~N(~TH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA M~XI.O.: 9351 PLACEMENT DATE: 06/27/200( TIME SAMPLED: 8:00anl BY: WEATm~R CoNomONS: Cloudy TEsa, wP, A~-v-RE ~.~ 72 ~ . ~UCK NO: 1882 ~cg Am co~ (%): N/A ~ P~C~ LOCATION: See page 1 S~ple ~en ~om ~ck p~p. REPORT OF TESTS A CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 6.00 07/04/2000 3 2 6.00 07/04/2000 MAXIMUM AGE LOAD (days) (lbs. force) 7 99550 7 103690 Average 3 3 6.00 07/25/2000 28 3 4 6.00 07/25/2000 28 Sample location: 195' N x 50' E form SE corner of Bldg. A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~ 01LL Page 3 of 4 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 17 ~56 Report Date 07/06/2000 Commerce Center Beltline (Bldg. A) 1, Texas [red field test and cast BATCH TIME: 7:25am ~teve Campbell 2ONCaETE: 82 ~r NO: 615790 HT WEIGHT (pc0: N/A 2CUMULATIVE YARDS: 10 COM?RESSIVE STRENGTH (p~) 3520 3670 3600 Ien approval of HBC Engineering, Inc. 'cONCRETE COMPI SSIVE STRENGTH TE T Date of Service: Client No.: Client: Services: 06/27/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 00167 Project No.: 94991 Project: Copp~ 1221 Copp, Obtain samples of fresh concrete at the placement locations, perform reqt compressive strength samples. a division of']~i-~tm 8901 Carpenter grwy., Suite #100 Dnll~n; T~tn~ 75247 SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQU1RE1MXN'rS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX LD.: 9351 PLACEMENT DATE: 06/27/20~ TIME SAMPLED: 9:30am BY: WEATHER CONDITIONS: partly ~ TEMPERATURE (19- AIR 76 F TRUCK NO: 33 TIC] AIR CONTENT (%): N/A t PLACEMENT LOCATION: See page 1. Sample taken from truck pump. REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 4 1 6.00 07/04/2000 7 93940 4 2 6.00 07/04/2000 7 100420 Average 4 3 6.00 07/25/2000 28 4 4 6.00 07/25/2000 28 Sample location: 180' N x 100' E from SE corner of Bldg. A 87 456 11 Commerce Center ~. Beltline (Bldg. A) 11, Texas tired field test and cast ~) BATCH TIME: 8:55am Steve Campbell :loudy CONCRETE: 82 F [ET NO: 615803 NIT WEIGHT (pcf): N/A ,CCUMULATIVE YARDS: 10 Technician: Steve Campbell Started: 3:00am Finished: 12:00pm ~ Report Distribution: (1) Transwestern Property Company (1) City of Coppell (1) O'Brien & Associates (1) City of Coppell (1) Technistructures, Inc. (1) Butler Construction This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w 01LL Page 4 of 4 Report Date 07/06/2000 itten approval of HBC Engineedng, Inc. -' Engine Eugene Harbour Vice President 3320 3550 3440 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE CONCRETE COMPRESoIVE STRENGTH TES ? Date of Service: 06/28/2000 Report No.: 0016888 Client No.: 85229000 Project No.: 94991456 Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell C 1221 S. B Coppell, Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 06/28/2000 TIME SAMPLED: 4:35am BY: Er WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 74 F CO TRUCK NO: 80 TICKET AIR CONTENT (%): 3.8 UNTI PLACEMENT IA)CATION: Paving Sample Location: 3' S of first island from E to ~; REPORT OF TESTS AC( CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.50 07/05/2000 7 105050 1 2 5.50 07/05/2000 7 101860 Average 1 3 5.50 07/26/2000 28 1 4 5.50 07/26/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt 01SDS Page I of 4 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/06/2000 ~mmerce Center :Itline (Bldg. A) 'exas field test and cast BATCH TIME: 4:08am in Farris ~cRETE: 81 F NO-- 611315 WEIGHT (pcf): N/A 1, W of NW comer of Bldg A, S wing. UMULATIVE YARDS: 30 OMPRESSIVE STRENGTH (psi) 3710 3600 3660 FRACTURE TYPE ~'n approval of HBC Engineering, Inc. CONCRETE COMPRE IVE STRENGTH TES Date of Service: 06/28/2000 Client No.: 85229000 Report No.: 0016888 Project No.: 94991456 Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell C 1221 S. B Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENaTn: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See placement location PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 06/28/2000 TIME SAMPLED: 6:00am BY: Er WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 75 F CO TRUCK NO: 8 TICKE'! Am CONTENT (%): 3.9 u~ PLACEMENT LOCATION: See page 1 Sample Location: 10 yards N of island at SE co REPORT OF TESTS AC( CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 6.00 07/05/2000 2 2 6.00 07/05/2000 2 3 6.00 07/26/2000 28 2 4 6.00 07/26/2000 28 MAXIMUM AGE LOAD (days) (lbs. force) 7 101220 7 104540 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt 01SDS Page 2 of 4 a division o/lr~fm-.c~n 8901 Carpenter Frwy., Suite #100 Dnlla_% Texas 75247 Report Date 07/06/2000 ommerce Center :ltline (Bldg. A) ?exas field test and cast BATCH TIME: N/A in Farris ~cRETE: 84 F NO: 611324 'WEIGHT (pcf): N/A 'her of Building B, S wing, 3' E of W curb. !UMULATIVE YARDS: 120 OMPRESSIVE STRENGTH (psi) 3580 3700 3640 FRACTURE TYPE approval of HBC Engineering, Inc. CONCRETE COMPRE[,oIVE STRENGTH Date of Service: 06/28/2000 Report No.: 0016888 Client No.: 85229000 Project No.: 94991456 Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell C 1221 S. B, Coppell, ~l Obtain samples of fresh concrete at the placement locations, perform require¢ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STraiN,TH: 4000 psi @ 28 Days 5" 3-6% ASTM C- !43 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 06/28/2000 TIME SAMPLED: 7:25am BY: Er~ WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 77 v col TRUCK NO: 37 TICKET AIR CONTENT (%): 3.4 UNIT PLACEMENT LOCATION: See page 1 Sample Location: Midway between island at SE around transformer. REPORT OF TESTS ACC CYLINDER MEASURED MAXIMUM ~ MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 5.50 07/05/2000 7 102820 3 2 5.50 07/05/2000 7 110140 Average 3 3 5.50 07/26/2000 28 3 4 5.50 07/26/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writte 01SDS Page 3 of 4 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/06/2000 }mmerce Center ltline (Bldg. A) :xas field test and cast BATCH TIME: 6:48am tin Fan-is ~CRETE: 87 NO: 611339 WEIGHT (pcf): N/A comer of S wing of Bldg B and island IMULATIVE YARDS: 220 )MPRESSIVE TRENGTH (psi) 3640 3890 3770 FRACTURE TYPE approval of HBC Engineering, Inc. CONCRETE COMPRE oIVE STRENGTH TES' Date of Service: 06/28/2000 Report No.: 0016888 Client No.: 85229000 Project No.: 94991456 Coppell C 1221 S. B, Coppell, Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 SLUMP: AIR: TEST METHOD: Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA MrX I.D.: 9351 PLACEMENT DATE: 06/28/2000 TIME SAMPLED: 9:00am BY: Er WEATHER CONDITIONS: Cloudy TE~VIFERATI~m~ ~-AIR 79 V co TRUCK NO: 1852 TICKET AIR CONTENT (~): 3.9 uNri PLACEMENT LOCATION: See page 1 Sample Location: 10' S of first island from W to REPORT OF TESTS ACC SAMPLE LOCATION: See placement location ENGINEER.I~, INC. a aivision oflraftacan 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ~mmerce Center ~ltline (Bldg. A) 'exas field test and cast BATCH TIME: 7:50am in Farris ~cRETE: 85 NO: 644348 WEIGHT (pcO: N/A Report Date 07/06/2000 E of Bldg B, SE comer of S wing. CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) Obs. force) 4 1 6.00 07/05/2000 7 108830 4 2 6.00 07/05/2000 7 111960 Average 4 3 6.00 07/26/2000 28 4 4 6.00 07/26/2000 28 UMULATIVE YARDS: 310 DMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3850 3960 3910 Technician: Ervin Fan-is Report Distribution: (1) Transwestern Property Company (1) O'Brien & Associates (1) Technistmctures, Inc. (1) Butler Construction Started: 3:00am Finished: 1 h30am ~ (1) City of Coppell (1) City of Coppell E This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrim gngi~ ~gene Harbour Vice President n approval of HBC Engineering, Inc. 01SDS Page 4 of 4