Northlake 635(5)-LR000703CONCRETE COMPRE " IVE STRENGTH TES i
Date of Service:
Client No.:
Client:
Services:
06/02/2000 Report No.:
85229000 Project No.:
Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
0014512
94991456
Coppell C
1221 S. B~
Coppell, ~I
Obtain samples of fresh concrete at the placement locations, perform requirec
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRESaTH: 4000 psi @ 28 Days
3-5"
3-6%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE: 06/02/2000
TIME SAMPLED: 8:20am BY: Ma
WEATHER CONDITIONS: Clear
TEMPERATURE (F) - AIR 79 v cot
TRUCK NO: 756 TICKET
AIR CONTENT (%): 4.6 UNIT
PLACEMENT LOCATION:
N end of parking lot of bldg. "A" panels #2, 59, ~
Note: Upon arrival Potter Concrete had already
REPORT OF TESTS
AC(
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 5.50 06/09/2000 7 100350
1 2 5.50 06/09/2000 7 97530
Average
1 3 5.50 06/30/2000 28 113880
I 4 5.50 06/30/2000 28 116180
Average
El
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writtel
01LL Page 1 of 5
a division of lren--'~nn
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/03/2000
>mmerce Center
~'ltline (Bldg. A)
exas
field test and cast
BATCH TIME: 7:48am
rio Villanueva
~CRETE: 84 F
SO: 566099
WEIGHT (per): N/A
ced 280 yards of paving.
;MULATIVE YARDS: 290
~MPRESSIVE
;TRENGTH
(psi)
3550
3450
3500
4O3O
4110
4070
FRACTURE
TYPE
approval of HBC Engineering, Inc.
Report No.: 0014512
Sample location: 160' N, 230' E of NW corner of building "A"
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writte
approval of HBC Engineering, Inc.
0ILL Page 2 of 5
CONCRETE COMPREa, 4IVE STRENGTH TES'
Date of Service:
Client No.:
06/02/2000
85229000
Report No.: 0014512
Project No.: 94991456
Client: Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Services:
Coppell C
1221 S. B,
Coppell,
Obtain samples of flesh concrete at the placement locations, perform require
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
3-5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE:
TIME SAMPLED: 9:40am
WEATHER CONDITIONS:
TEMPERATURE (F)- AIR 78
TRUCK NO: 032
AIR CONTENT (%): 5.0
PLACEMENT LOCATION:
See page 1
06/02/2000
BY: M~
Clear
F CO
TICKE~I
UNTI
REPORT OF TESTS
AC(
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
MAXIMUM
AGE LOAD
(days) (lbs. force)
2 1 5.75 06/05/2000 3
2 2 5.75 06/09/2000 7
2 3 5.75 06/30/2000 28
2 4 5.75 06/30/2000 28
69630
97240
116790
113360
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ/
0ILL Page 3 of 5
a division of'l~t~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/03/2000
9mmerce Center
fltline (Bldg. A)
'exas
field test and cast
BATCH TIME: 8:25am
rio Villanueva
~CRETE: 82
NO: 566106
WEIGHT (pcf): N/A
UMULATIVE YARDS: 350
OMPRESSIVE
STRENGTH
(psi)
2460
3440
4130
4010
4070
FRACTURE
TYPE
m approval of HBC Engineering, Inc.
Report No.: 0014512
Sample location: 50' N, 140' E of NW corner of building "A"
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt~
approval of HBC Engineering, Inc.
01LL Page 4 of 5
CONCRETE COMPRE ' JIVE STRENGTH TES'
Date of Service: 06/02/2000 Report No.: 0014512
Client No.: 85229000 Project No.: 94991456
Client: Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services:
Coppell C
1221 S. B
Coppell,
Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STP~NGT~I: 4000 psi @ 28 Days
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Panel #80
PROJECT DATA
M~X I.D.: 9351
PLACEMENT DATE: 06/02/2000
TIME SAMPLED: ll:10am BY: Mi
WEATHER CONDITIONS: Clear
TEMPERATURE (F)- AIR 82 F CO
TRUCK NO: 846 TICKET
Am CONTENT (%): 4.2 v~
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
AC(
CYLINDER MEASURED MAX]MU1VI
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) Obs. force)
3 1 5.25 06/05/2000 3 73650
3 2 5.25 06/09/2000 7 88200
3 3 5.25 06/30/2000 28 114400
3 4 5.25 06/30/2000 28 112790
Average
a ctivision of llm"'z~rc, n
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/03/2000
~mmerce Center
.qtline (Bldg. A)
'exas
field test and cast
BATCH TIME: 10:20am
rio Villanueva
qCRETE: 84 F
NO: 566109
WEIGHT (pcO: N/A
IMULATIVE YARDS: 380
VIPRESSIVE
STRENGTH
(psi)
2600
3120
4050
3990
4020
FRACTURE
TYPE
Technician: Mario Villanueva Started: 7:30am Finished: 12:30pm
Report Distribution:
(1) Traaswestern Property Company (1) City of Coppell
(1) O'Bden & Associates (1) City of Coppell
(1) Techaistmctures, Inc.
(1) Butler Construction
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt
O1LL Page 5 of 5
Vice President
,'n approval of HBC Engineering, Inc.
.CONC TE COMPR ST
Date of Service: 06/23/2000 Report No.: 0016496
Client No.: 85229000 Pl'oJm No.: 94991456
Client: Transwestern Property Company Proje~:
Atto: James Oaspard
12221 Merit Drive, g450
Dallas TX 75251
Coppell £
1221 S. B
Coppell, ~
Services: Obtain samples of fresh concrete at the placement locations, perform requir~
compressive strength samples.
CONTR~CTOm Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SI~CIFICATION RFA~R~.M~N'I~
S'rRF3~TH: 4000 psi @ 28 Days
SLt~M~: 4-6"
Am: N/A
~ ~raOD: ASTM C-143
ASTlVI C- 172
ASTM C-39
~ LOCATION: 100' E of NE ~omer of bldg. A
PROJECT DATA
~xI~.: 9351
TI~~ED: 6:40am BY: Er
w~xma~ Cloudy
T~mmATU~.Am 75 v co
~~: 114
Am ~ (~ N/A
~~x
REPORT OF TESTS
AC(
CYLINI~R ~ MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) Obs.
I I 6.00 06/30/2000 7 77370
I 2 6.00 06/30/2000 7 79330
Avel'a~
1 3 6.00 07/21/2000 28
1 4 6.00 07/21/2000 28
This relx~ is exclusivc~ foF thc use ~ Ihe clie~ indicated above and shall not be rc~ e2tcePt ia M ~ ~ ~!
OILL Pa~e 1 of S
ommerc~ Center
~ltline (Bldg. A)
?exas
I field t~t and cast
BATClt TIM~: 6:00am
c Garcia
~ 89
566879
w~r,a,r C~: NtA
BIds. A
~TrV'Z Ynmm: 70
Obll'B~S8~
2740
2810
278O
CONCRETE COMPRE qlVE STRENGTH TES
Date of Service: 06/23/2000
Client No.: 85229000
Client:
Transwestern Property Company
Attn: James Gaspard
12221 Merit Drive, 0450
Dallas TX 75251
Report No.: 0016496
Project No.: 94991456
Project: Coppell C
1221 $. B~
Coppell, 3
Services: Obtain samples of fresh concrete at the placement locations, perform require¢
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
1,LA~r: 22
sPEcnncnanoN
STa~aTm 4000 psi @ 28 Days
4-6"
N/A
ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
M~XI.O.: 9351
PLACEMENT DATE: 06/23/2000
TIME SAMPLED: 8:00am BY: Eft
w~nxmmco~omoNs: Cloudy
TEMI'ERATURE (F) - AIR 75 F CO
TRUCK NO: 114 T~CK~T
Am com~r (%): N/A
PLACEMENT LOCATION:
See page I
Note: Technician informed foreman of water bei
SAMPLE LOCATION: 30' S, 40' E of NE comer of bldg.
REPORT OF TESTS
AC(
CYLINDER
MAi~lCl~
SET NO.
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(laches) TESTED (days) (lbs. force)
2 1 7.00 06/30/2000 7 79080
2 2 7.00 06/30/2000 7 82880
Average
2 3 ' 7.00 07/21/2000 28
2 4 7.00 07/2112000 28
01LL
This n~ort is exclusively for Ihe use of the client indicated above and shall not be reproduced except/n full without abe writ~
Page 2of5
ENGINEER~, INC.
. division of'lSm-,~mn
8901 Carpente~ Frwy., Suite #100
Report Date
07/0312000
)mmerce Center
fltline (Bldg. A)
exas
field test and cast
BATCH TIME: 7:30am
Garcia
~cv.~TE: 89
NO: 566895
WEIGItT (la:l): N/A
added by his crew.
IMULATIVE YARDS: 180
MPRF3$1VE
STRENGTH
2800
2930
2870
~n approval of HBC Engineedng, Inc.
CONCRETE COMPRE IVE ST NGTH TES
Date of Service:
Client No.:
Client:
Services:
I
06/23/2000
85229000
Report No.: 0016496
Project No.: 94991456
Tmnswestem Property Company
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Project: Coppell C
1221 S. B
Coppell,
Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
SLUMP:
AIR:
~ lVl~TIOD:
corcr~CTOR: Butler COnstruction
CONCRETE SUPPLIER: Pioneer
rt~rr: 22
Sr~C~'iCA'lmO~ REQUIREM~-TS
STg~OTH: ~ psi ~ 28 Days
4~"
N/A
ASTM ~ 143
AS~ C-172
AS~ C-39
PROJECT DATA
M~X I.O.: 9351
PLACEMENT DATE:
TIME SAMI~LED: 9:45am
WEATIIER CONDITIONS:
T~-~n,~o~-m~ (~3- Am 80
THUC~:~O: 756
Am co~x~x~r (,~): N/A
PLACEMENT LOCATION:
S~e page I
06/23/2000
Cloudy
F CO
TICKEr
SAMPLE LOCATION: 100' S, 90' E of NE comer of bldg.
REPORT OF TESTS
ACC
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. fo~ce)
3 1 6.50 06/30/2000 7 85720
3 2 6.50 06/30/2000 7 86030
Average
3 3 6.50
3 4 6.50
07/21/2000 28
07/21/2000 28
This report is exclusively for the use of Ibc client indicated above and shall uot be reproduced except in full without ~he writU
0ILL Page 3 of 5
8901 Carpenter Fr~., Suite
~ Texas 75247
Report Date
07/03/2000
ommerce Center
fltline (Bldg. A)
'exas
field test and cast
BATCH TIME: 8:42am
Oarcia
qCRETE: ~K) F
NO: 566909
W~iG~rr (pcO: N/A
UMULATIVE YARDS: 280
Ol~RF. SSIVE
STRENGTH
3030
3040
3040
FRACTURE
TYPE
CONCRETE COMPRE IVE STRENGTH TES'""
Date of Service: 06/23/2000
Client No.: 85229000
Client: Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, 8450
Dallas TX 75251
Report No.: 0016496
Project No.: 94991456
Project: Coppell C
1221 S. B
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requ ¢
compressive strength samples.
Jl
a division of ~
8901 Carpenter Frwy., Suite #100
I
Report Date
07/03/2000
ommerce Center
'Atline (Bldg. A)
~'xas
field test and cast
SLUMP:
AIR:
TEST METHOD:
CotcrRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
r~m~r: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
4-6"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: 175' S, 30' E of NE comer of bldg.
PROJECT DATA
M~X I.O.: 9351
PLACEMENT DATE: 06/23/2000
TIME SAMPLED: ll:10am aY: Eri
~~ co~rrloNs: Cloudy
TEMPERATURE (F)- Am 83 F col
TRUCK NO: 1824 TICKET
Am CONTEtCr ('~): N/A uNrr
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (in~hes) TESTED (days) (lbs. for~)
4 1 5.00 06/30/2000 7 89290
4 2 5.00 06/30/2000 7 86700
Average
4 3 5.00 07/21/2000 28
4 4 5.00 07/21/2000 28
BATCH TIME: 9:55am
Garcia
ACC
Ct
CREel'E: 90 F
~;o: 566920
w~oi-rr (l~0: N/A
YMULATIVE YARDS: 370
)MPRESSIVE
~TRF~GTH
3160
3070
3120
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writtel
Page 4 o~ 5
m approval of HBC Eagineering, Inc.
CONCRETE COMPRFf IVE ST NGTH TES
Date of Service: 06/23/2000 Report No.:
Client No.: 85229000 Project No.:
Client: Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
0016496
94991456
Coppell C
1221 S. B
Coppell,
a division of ~
8901 Carpenter Frwy., Suite #100
DUII~, T~tas 75247
07/03/2000
ommerce Center
~ltline (Bldg. A)
'exas
Services:
SLUMP:
AIR:
TF_.ST METHOD:
Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
SPECIFICATION REQUI~
STgENGTH: 4000 psi @ 28 Days
4-6"
N/A
ASTM C- 143
ASTM C- 172
ASTM Co39
PROJECT DATA
SAMPLE LOCATION:
Butler Construction MIX LO.: 9351
Pioneer PLAC~VmNT DATE: 06/23/2000
22 T~ SAMPLED: 12:55pm BY: Er
CYLINDER
MARKED
SET NO.
WEATIIER CONDITIONS:
TF~O~I~'IZU~ O9 - Am
T~UCK No: 1883
Am conTEwr (~): N/A
PLACEMENT LOCATION:
See page !
See below
MEASURED
SLUM~
5 1 6.00
5 2 6.00
5 3 6.00
5 4 6.00
Sample location: 240'
Teehnkiam Eric Oarcia
(1) Trauswestcm Property Compaay
(i) O'Blien & Associates
(1) Tec~, Inc.
(1) Butler Coaslruc~ion
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (ll~. force)
Cloudy
87 w co
TICKET
06/30/2000 7 86750
06/30/2000 7 89910
AverAge
ACC
I field test and cast
BATCH TIME: 12:00pm
c Oarcia
~ca~w 90
NO: 566934
WEIGHT (peO: N/A
UMULATIVE YARDS: 480
07/21/2000 28
07/21/2000 28
C DMPRF3SIVE
STRENGTH
3O70
3180
3130
S, 90' E of NE corner of bldg. A
Started: 5:00am Finished: 2:45pm
(1) City of Coppell
(1) City of Coppcil E~
This rc~ is exclusively for Ihe usc of th~ client indicated above and shall not bc reproduced except in full without the writtc
FRACTURE
TYPE
Engin~~'~"~'-~
~gene Harbour
Vice President
n approval of HBC Engineering, Inc.
Page 5 of 5