Loading...
Northport BP-CS 870312GINN, INC. CONSI -LTING ENGINEERS March 12, 1987 Mr. Alan~Ratliff, City Manager P.O. Boxy478 Coppell,~ 75019 Attn: Shoh~ Daneshmand Re: Drainage Channel Northport Business Park Dear Ms. Daneshmand: Pursuant to our meeting on March 6, 1987, with the developer and engineer on the above referenced project, the following comments are offered. The City has no objections to the construction of the drainage channel on the property, prior to final platting, as long as the channel meets all the criteria of the City of Coppell standards. The main concerns are the velocities in the proposed channel. Velocities greater than 8 f.p.so on grassed slopes are unacceptable. If the velocities exceed 8 f.p.s., the side slopes shall be concrete lined; otherwise, erosion of the sides of the channel will occur and present a maintenance problem to the City. The City should not accept the channel for maintenance until final platting is approved and a one-year warranty period has expired. If you have any questions, please contact us. Sincerely, Gabe Favre /ss cc: Taryon Bowman/ Frank Trando~ Wayne Ginn 17103 Preston Road · Suite 100 · LB 118 · Dallas. Texas 75248 $ Phone 214-'248-4900