Loading...
Northlake 635(5)-LR000621CONCRETE COMPRE oSIVE STRENGTH TES- Date of Service: 05/23/2000 Report No.: 0013613 Client No.: 85229000 Project No.: 9499145~ Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive,//450 Dallas TX 75251 Services: Coppell 1221 S. i Coppell, Obtain samples of fresh concrete at the placement locations, perform requir{ compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 51 PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: 05/23/2000 TIME SAMPLED: 4:30am BY: SI WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 75 F TRUCK NO: 80 TICKE AIR CONTENT (%): 1.8 UNI PLACEMENT LOCATION: Tilt wall panels REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 7.00 05/30/2000 7 76810 1 2 7.00 05/30/2000 7 78300 Average I 3 7.00 06/20/2000 28 142930 1 4 7.00 06/20/2000 28 144450 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the will 01LL Page I of 3 a division ofl~n-~c~n 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/21/2000 Immerce Center leltline (Bldg. A) Texas I field test and cast BATCH TIME: 3:53am ane Spinks }NCRETE: 83 V rNO: 535154 WEIGHT (pcf): N/A UMULATIVE YARDS: 50 ~OMPRESSIVE STRENGTH (psi) 2720 2770 2750 5O5O 5110 5080 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPR oSIVE STRENGTH TES Date of Service: 05/23/2000 Report No.: 0013613 Client No.: 85229000 Project No.: 9499145 Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell ~ 1221 S. 1 Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 114 PROJECT DATA MIX I.D.: 9349 PLACEMENT DAT~: 05/23/2000 TIME SAMPLED: 5:35am BY: S WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 80 AIR CONTENT (%): 1.8 PLACEMENT LOCATION: See page 1 76 F TICKE UN! REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 6.50 05/30/2000 7 91380 2 2 6.50 05/30/2000 7 91020 Average 2 3 6.50 06/20/2000 28 116400 2 4 6.50 06/20/2000 28 113360 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 01LL Page 2 of 3 a division of 1Fertactm 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/21/2000 :ommerce Center leltline (Bldg. A) Texas field test and cast BATCH TIME: 4:33am ~ane Spinks )NCRETE: 81 F FNO: 535165 r WEIGHT (pcf): N/A 2UMULATIVE YARDS: 170 2OMPRESSIVE STRENGTH (psi) 3230 3220 3230 4120 4010 4070 FRACTURE TYPE approval of HBC Engineering, lac. CONCRETE COMPRE IVE STRENGTH TES. Date of Service: 05/23/2000 Client No.: 85229000 Report No.: 0013613 Project No.: 9499145¢ Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell ( 1221 S. F Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir{ compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-5" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 37 PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: 05/23/2000 TIME SAMPLED: 8:40am BY: SI WEATHER CONDITIONS: TEMPERATURE (F)- Am TRUCK NO: 739 AIR CONTENT (%): 2.2 PLACEMENT LOCATION: See page 1 Clear, SUl 75 F c¢ TICKE~ UNr REPORT OF TESTS AC1 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 3 1 5.25 3 2 5.25 3 3 5.25 3 4 5.25 DATE TESTED 05/30/2000 05/30/2000 06/20/2000 06/20/2000 MAXIMUM AGE LOAD (days) Obs. force) 7 111070 7 113360 Average 28 120300 28 119290 Average Technician: Shane Spinks Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technis~'uctures, Inc. (1) Butler Construction Started: 3:00am (1) City of Coppeli (1) City of Coppell Finished: 10:00am a division of l~:ft--~:a~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 }mmerce Center eltline (Bldg. A) Fexas Report Date 06/2112000 d field test and cast BATCH TIME: 7:30am tane Spinks my ,NCREX~: 81 F NO: 535173 WEIGHT (pc0: N/A ~UMULATIVE YARDS: 250 :OMPRESSIVE STRENGTH (psi) 3930 4010 3970 4250 4220 4240 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri ;ugene Harbour Vice President en approval of HBC Engineering, Inc. 0ILL Page 3 of 3