Northlake 635(5)-LR000619REPORT OF STRUCTL'? iAL STEEL INSPECTI ' Report No.: 0015443 Project No.: 94991456 Project: Coppell C, 1221 S. B~ Coppell, 'I Date of Service: 06/13/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above jobsite as scheduled for structural steel inspection. A visual inspe~ conducted on Building A, Roof Level Framing between lines A to D and lines A to M and 1 to 4, and lines J to M and 4 to 10 as noted below. ENG~nERR~, R~C~ a division of'l~afi-~Oft 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Technician: Randy Walcker Report Distribution: (1) Traaswestern Property Company (1) O'Brien & Associates (1) Technistmctures, Inc. (1) Butler Construction 1. Column anchor bolts, unable to inspect due to blockout being full of wate~-. 2. Joist and girder seat welds were determined to be compliant. 3. Joist bridging was not complete. (1) City of Coppell (1) City of Coppell E This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt~ )mmerce Center :ltline (Bldg. A) exas 'eferenced :tion was to 10, Report Date 06/19/2000 agene Harbour Vice President approval of HBC Engineering, Inc. 99SDS Page 1 of 1 CONCRETE COMPRE SIVE STRENGTH TES Date of Service: 06/09/2000 Client No.: 85229000 Report No.: 0015169 Project No.: 9499145~ Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell 1221 $. i Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5" 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIME SAMPLED: 4:45am BY: $ WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 4.1 PLACEMENT LOCATION: Paving N face of bldg. A & B Cloudy, 74 F o TICKE UN! REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) I 1 5.50 06/16/2000 7 83230 1 2 5.50 06/16/2000 7 76410 Average I 3 5.50 07/07/2000 28 I 4 5.50 07/07/2000 28 Sample location: 20' N x 15' E of NW corner of bldg. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 0ILL Page I of 5 a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/19/2000 ommerce Center eltline (Bldg. A) Texas d field test and cast BATCH TIME: 4:00am ~ane Spinks ain )NCRETE: 69 F r NO: N/A r WEIGHT (pc0: N/A EUMULATIVE YARDS: 50 COMPRESSIVE STRENGTH (psi) 2940 2700 2820 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPR oSIVE STRENGTH TES? Date of Service: Client No.: Client: Services: 06/09/2000 85229000 Report No.: 0015169 Project No.: 94991451 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell 1221 S. Copper Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5" 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: TIME SAMPLED: 6:20am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 4.6 PLACEMENT LOCATION: See page 1 06/09/2000 BY: S] Cloudy, 75 F cz TICKE' UNI SAMPLE LOCATION: 30' N x 25' W of NW comer of bldg. REPORT OF TESTS AC, CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 I 5.75 06/16/2000 7 121160 2 2 5.75 06/16/2000 7 110310 Average 2 3 5.75 07/07/2000 28 2 4 5.75 07/07/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 01LL Page 2 of 5 a divi~io, o/l[~ac~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/19/2000 ',ommerce Center ;eltline (Bldg. A) texas d field test and cast BATCH TIME: 5:30am lane Spinks aln INCRETE: 70 F r NO: N/A WEIGItT (pcf): N/A IIVIULATIVE YARDS: 150 :OMPRESSIVE STRENGTH (psi) 4280 3900 4090 FRACTURE TYPE Len approval of HBC Engineering, Inc. CONCRETE COMPREr $IVE STRENGTH TES? Date of Service: 06/09/2000 Report No.: 0015169 Client No.: 85229000 Project No.: 94991451 Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive,//450 Dallas TX 75251 Coppell 1221 S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5" 3-5% ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: TIME SAMPLED: 8:05am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 3.8 PLACEMENT LOCATION: See page I 06/09/2000 BY: S1 Cloudy, 78 F c( TICKE' UN1 SAMPLE LOCATION: See below REPORT OF TESTS AC~ CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 6.25 06/16/2000 7 114050 3 2 6.25 06/16/2000 7 108830 Average 3 3 6.25 07/07/2000 28 3 4 6.25 07/07/2000 28 Sample location: 30' N x 10' E of NE corner of Bldg B This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ OILL Page 3 of 5 ENGINEERING, INC. a division ofl[n-a:~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/19/2000 ~.ommerce Center ;eltline (Bldg. A) l'exas d field test and cast BATCH TIME: 7:00am rune Spinks ain ~NCRETE: 70 F NO: N/A WEIGHT (pcf): N/A .~UMULATIVE YARDS: 250 :OMPRESSIVE STRENGTH (psi) 4030 3850 3940 FRACTURE TYPE ~en approval of HBC Engineering, Inc. CONCRETE COMPRE $IVE STRENGTH Date of Service: 06/09/2000 Report No.: 0015169 Client No.: 85229000 Project No.: 9499145. Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell ~ 1221 S. ] Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5" 3-5% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIME SAMPLED: 10:00am BY: S WEATHER CONDITIONS: Cloudy, TEMPERATURE (F) - AIR 78 F TRUCK NO: N/A TICKE AIR CONTENT (%): 3.5 PLACEMENT LOCATION: See page I SAMPLE LOCATION: See below REPORT OF TESTS A£ CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 4 1 6.50 06/16/2000 7 90010 4 2 6.50 06/16/2000 7 94870 Average 4 3 6.50 07/07/2000 28 4 4 6.50 07/07/2000 28 Sample location: 30' N x 7' W of NE corner of bldg. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wE 01LL Page 4 of 5 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/19/2000 :ommerce Center ieltline (Bldg. A) Texas '~d field test and cast BATCH TIME: 9:20am bane Spinks rain )NCRETE: 70 F r NO: N/A T WEmnT (pc0: N/A CUMULATIVE YARDS: 380 COMPRESSIVE STRENGTH (psi) 3180 3350 3270 FRACTURE TYPE tten approval of HBC Engineering, Inc. CONCRETE COMPRE IVE STRENGTH TES. Date of Service: Client No.: Client: 06/09/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0015169 Project No.: 9499145( Project: Coppell £ 1221 S. l~ Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: N/A SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-5" 3-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA MIX I.D.: N/A PLACEMENT DATE: 06/09/2000 TIMESAMPLED: ll:20am BY: SI WEATHER CONDITIONS: Cloudy, r; TEMPERATURE (F) - AIR 79 F CC TRUCK NO: N/A TICKEq AIRCONTENT (%): 4.0 UNIq PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: See below REPORT OF TESTS AC( CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 5 1 7.00 06/16/2000 7 81290 5 2 7.00 06/16/2000 7 87880 Average 5 3 7.00 07/07/2000 28 5 4 7.00 07/07/2000 28 Sample location: 20' N x 20' W of NE corner of bldg. B Technician: Shane Spinks Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (I) Technisa'uctures, Inc. (1) Butler Construction Started: 3:00am Finished: 12:00pm H~ (1) City of Coppell (1) City of Coppell ]: This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt a division of 1Ft~tmmn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/19/2000 '.ommerce Center eltline (Bldg. A) [~exas field test and cast BATCH TIME: 10:45am Lne Spinks tin NCRETE: 73 F 'NO: N/A ' WEIGHT (pcf): N/A :UMULATIVE YARDS: N/A :OMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2870 3110 2990 ugene Harbour Vice President m approval of HBC Engineering, Inc. 01LL Page 5 of 5