Loading...
Northlake 635(5)-LR000608CONCRETE COMPRE IVE STRENGTH Date of Service: Client No.: 05/09/2000 85229000 Report No.: 0012291 Project No.: 9499145( Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell £ 1221 S. lq Coppell, Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 3-6" N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier M. 1-10.1 PROJECT DATA MIX I.D.: 9337 PLACEMENT DATE: 05/09/2000 TIME SAMPLED: ll:45am BY: A. WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 73 F CC TRUCK NO: 878 TICKEq AIR CONTENT (%): N/A UNI~ PLACEMENT LOCATION: Pier information and technician time: see Repo REPORT OF TESTS AC( CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 4.00 1 2 4.00 1 3 4.00 1 4 4.00 DATE TESTED 05/16/2000 06/06/2000 06/06/2000 07/04/2000 MAXIMUM AGE LOAD (days) (lbs. force) 7 28 28 56 96800 135530 140490 Average a aivision 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/08/2000 '.ommerce Center eltline (Bldg. A) ['exas field test and cast BATCH TIME: 1 l:10am Bulent Ethem, P.G. NCRETE: 78 F 'NO: 507815 , WEIGHT (pcf): N/A g0012290 JMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH - (psi) 3420 4790 4970 4880 FRACTURE TYPE Technician: A. Bulent Ethem, P.G. Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technistructures, Inc. (1) Butler Construction Started: (1) City of Coppeil (1) City of Coppell Finished: __~neerlng, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt F ugene Harbour Vice President ~n approval of HBC Engineering, Inc. 01LL Page 1 of I CONCRETE COMPRE IVE STRENGTH TES Date of Service: 05/31/2000 Report No.: 0014257 Client No.: 85229000 Project No.: 9499145( Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell ( 1221 S. E Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 27 SPECIFICATION REQUIREMENTS STRENaTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 30' N from NE comer of slab PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: TIME SAMPLED: 5:20am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 836 AIR CONTENT (%): N/A PLACEMENT LOCATION: Paving/NE comer of project 05/31/2000 BY: St Clear 80 F TICKE' UNr REPORT OF TESTS AC~ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 6.50 -' 06/07/2000 7 77780 1 2 6.50 06/07/2000 7 79130 Average ! 3 6.50 06/28/2000 28 1 4 6.50 06/28/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ 01LL Page 1 of 3 a division ofl~-a~nn 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 06/08/2000 ommerce Center eltline (Bldg. A) Ce_x_ as d field test and cast BATCH TIMJE: 4:04am eve Campbell ,NCRETE: 89 F NO: 508570 ' WEIGHT (pcf): N/A :UMULATIVE YARDS: 10 ',OMPRESSIVE STRENGTH - (psi) 2750 2800 2780 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRE $IVE STRENGTH Date of Service: Client No.: Client: 05/31/2000 Report No.: 85229000 Project No.: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 ENCdNEERI~, INC a division of 8901 Carpenter Frwy., Suite #100 Dallan, Texas 75247 0014257 Report Date 06/08/2000 9499145~ Coppell (~ommerce Center 1221 S. t~eltline (Bldg. A) Coppell, ~Fe_xas Services: Obtain samples of fresh concrete at the placement locations, perform requir¢ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MLX I.D.: 9351 PLACEMENT DATE: 05/31/2000 TIME SAMPLED: 7:00am BY: SI WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 836 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 Clear 80 F c< TICKE' UNI REPORT OF TESTS AC~ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 8.50-' 06/07/2000 7 79500 2 2 8.50 06/07/2000 7 84810 Average 2 3 8.50 06/28/2000 28 2 4 8.50 06/28/2000 28 Sample location: 35' E x 45' N from NE corner of slab This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriV 0ILL Page 2 of 3 ~d field test and cast BATCH TIME: 6:05am eve Campbell ;NCRETE: 90 F rNO: 508581 WEIGHT (pcf): N/A FMULATIVE YARDS: 10 ~OMPRESSIVE STRENGTH (psi) 2810 3000 2910 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPRE IVE STRENGTH TES. Date of Service: 05/31/2000 Report No.: 0014257 Client No.: 85229000 Project No.: 94991451 Client: Services: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell 1221 S. CoppelL Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 27 SPECIFICATION REQUIREMENTS STRENOTB: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I~.: 9351 PLACEMENT DATE: TIME SAMPLED: 7:50am WEATHER CONDITIONS: TEMPERATVRE (~) - AIR TRUC~C NO: 836 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 05/31/2000 BY: SI Clear 81 F c¢ TICKE' UN! REPORT OF TESTS AC4 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 6.00 3 2 6.00 3 3 6.00 3 4 6.00 Sample location: DATE TESTED 06/07/2000 06/07/2000 06/28/2000 28 06/28/2000 28 MAXIMUM AGE LOAD (days) (lbs. force) 7 83670 7 84520 Average 85' E x 60' N from NE corner of slab a division of'l~ 8901 Carpenter Frwy., Suite #100 Dalla% Texas 75247 Report Date 06/08/2000 ~,ommerce Center eltline (Bldg. A) Fe~as d field test and cast BATCH TIME: 7:25am eve Campbell ~NCRETE: 91 F rNO: 508591 WEIGHT (pcf): N/A UMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH ' (psi) 2960 2990 2980 Technician: Steve Campbell Report Distribution: (!) Transwestern Property Company (I) O'Brien & Associates (I) Technistructures, Inc. (1) Butler Construction Started: 3:00am (1) City of Coppell (1) City of Coppell Finished: lO:OOam H~lneerlng, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr ~ugene Harbour Vice President en approval of HBC Engineering, Inc. 01LL Page 3 of 3