Northlake 635(5)-LR000606CONCRETE COMPRE 3IVE STRENGTH TES-
Date of Service: 05/08/2000 Report No.: 0012183
Client No.: 85229000 Project No.: 9499145¢
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services:
Coppell
1221 S.
Coppell,
Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: a utler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
3-6"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Piers M/8.9, M/10
PROJECT DATA
MIX I.D.: 9337
PLACEMENT DATE: 05/08/2000
TIME SAMPLED: ll:50am BY: R
WEATHER CONDITIONS: Clear, wi
TEMPERATURE (F) - AIR 86 F C¢
TRUCK NO: 730 TICK~'
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
Pier information and technician time: See Reix
REPORT OF TESTS
AC
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1 6.00
1 2 6.00
1 3 6.00
1 4 6.00
DATE
TESTED
05/15/2000
05/15/2000
06/05/2000
06/05/2000
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 86350
7 87910
Average
28 116890
28 116180
Average
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
06/06/2000
!ommerce Center
;eltline (Bldg. A)
Fexas
d field test and cast
BATCHTIME: 1 l:05am
)y Montgomery
ady
~NCRETE: 87 F
NO: 567248
WEIGHT (pcf): N/A
00012182
~UMULATIVE YARDS: 20
'.OMPRESSIVE
STRENGTH
(ps0
3050
3110
3080
4130
4110
4120
FRACTURE
TYPE
Technician: Roy Montgomery
Report Distribution:
(i) Transwestern Property Company
(I) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
Started:
(1) City of Coppell
(1) City of Coppell
Finished:
__~ngineering, Inc.
~ugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~
ten approval of HBC Engineering, Inc.
01LL Page 1 of 1