Loading...
Northlake 635(5)-LR000605CONCRETE COMPRE ' "$IVE STRENGTH TES Date of Service: 05/23/2000 Report No.: 0013613 Client No.: 85229000 Project No.: 9499145. Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell ~ 1221 S. ] Coppell, Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 51 PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: TIME SAMPLED: 4:30am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 80 AIR CONTENT (%): 1.8 PLACEMENT LOCATION: Tilt wall panels 05/23/2000 BY: S Clear 75 F TICKE UNI REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 7.00 05/30/2000 7 76810 1 2 7.00 05/30/2000 7 78300 Average 1 3 7.00 06/20/2000 28 1 4 7.00 06/20/2000 28 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the wri 01LL Page 1 of 3 a division of'lfma-~can 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/05/2000 :ommerce Center leltline (Bldg. A) Texas field test and cast BATCH TIME: 3:53am aane Spinks INCRETE: 83 F tqO: 535154 WEIGHT (pcf): N/A :UMULATIVE YARDS: 50 COMPRESSIVE STRENGTH (p~) 2720 2770 2750 FRACTURE TYPE approval of HBC Engineering, Inc. CONCRETE COMPRE ,$IVE STRENGTH TES- Date of Service: 05/23/2000 Report No.: 0013613 Client No.: 85229000 Project No.: 9499145 Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell 1221 S. Coppell, Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STm~tqaTI~: 4000 psi @ 28 Days 3-5" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel ll4 PROJECT DATA MIX i.r}.: 9349 PLACEMENT DATE: TIME SAMPLED: 5:35am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 80 AIR CONTENT (%): 1.8 PLACEMENT LOCATION: See page 1 05/23/2000 BY: S Clear, w: 76 F C, TICKE UN] REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 6.50 05/30/2000 7 91380 2 2 6.50 05/30/2000 7 91020 Average 2 3 6.50 06/20/2000 28 2 4 6.50 06/20/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 01LL Page 2 of 3 a division 8901 Carpenter Frwy., Suite #100 Dnllnn~ Texas 75247 Report Date 06/05/2000 '.ommerce Center leltline (Bldg. A) Texas :d field test and cast BATCH TIME: 4:33am bane Spinks ~NCRETE: 81 F rNo: 535165 T WEIGHT (pc0: N/A :UMULATIVE YARDS: 170 ',OMPRESSIVE STRENGTH (psi) 3230 3220 3230 FRACTURE TYPE tten approval of HBC Engineering, Inc. CONCRETE COMPRE SIVE STRENGTH TESr Date of Service: 05/23/2000 Client No.: 85229000 Report No.: 0013613 Project No.: 9499145~ Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell ~ 1221 S. l Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction MIX I.D.: 9349 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 05/23/2000 PLANT: 29 TIME SAMPLED: 8:40am BY: S SPECIFICATION REQUIREMENTS WEATHER CONDrrlONS: Clear, su STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 75 F O SLUMP: 3-5" TRUCK NO: 739 TICKE AIR: N/A AIR CONTENT (%): 2.2 TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 37 REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (Mch~) TESTED (days) (ibs. brce) 3 1 5.25 05/30/2000 7 111070 3 2 5.25 05/30/2000 7 113360 Average 3 3 5.25 06/20/2000 28 3 4 5.25 06/20/2000 28 a division 8901 Carpenter Frwy., Suite #100 Dalln% Texas 75247 Report Date 06/05/2000 ommerce Center leltline (Bldg. A) Texas field test and cast BATCH TIME: 7:30am aane Spinks any )NCRETE: 81 F rNO: 535173 T WEIGHT (per): N/A CUMULATIVE YARDS: 250 UOMPRESSIVE STRENGTH (psi) 393O 4010 3970 FRACTURE TYPE Technician: Shane Spinks Report Distribution: (1) Transwestern Property Company (1) O'Brien & Associates (1) Technistxuctures, Inc. ( 1 ) Butler Construction Started: 3:00am (i) City of Coppell ( 1 ) City of Coppell Finished: 10:00am This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc wr neerlng, Inc. Eugene Harbour Vice President approval of HBC Engineering, Inc. 01LL Page 3 of 3