Loading...
Northlake 635(5)-LR000530CONCRETE COMPRL " $IVE STRENGTH Date of Service: 05/17/2000 Report No.: 0013072 Client No.: 85229000 Project No.: 9499145~ Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell ~ 1221 S. 1 Coppell, Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENaTI~: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: P- 110 PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: 05/17/2000 TIME SAMPLED: 5:00am BY: S WEATHER CONDITIONS: Cloudy, TEMPERATURE (F) - AIR 72 TRUCK NO: 1824 TICICE AIR CONTENT (%): N/A UN{ PLACEMENT LOCATION: Panels- 78, 76, 77, 112, 111, 72, 60-70, 53-59, Sample taken from track. REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 5.50 05/24/2000 7 86850 1 2 5.50 05/24/2000 7 89900 Average 1 3 5.50 06/14/2000 28 ! 4 5.50 06/14/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc wri 01LL Page 1 of 3 a division ofl~"~lZt:gt 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/30/2000 ommerce Center eltline (Bldg. A) Texas field test and cast BATCH TIME: 4:15am :eve Campbell ~indy )NCRETE: 78 F r No: 567704 T WEIGHT (pc0: N/A 107, 108 CUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 3070 3180 3130 ~n approval of HBC Engineering, Inc. CONCRETE COMPRE $IVE STRENGTH TES Date of Service: 05/17/2000 Client No.: 85229000 Report No.: 0013072 Project No.: 9499145~ Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell 1221 S. i Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: P-19 PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: 05/17/2000 TIME SAMPLED: 6:45am BY: S WEATI~R CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 108 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Cloudy,' 72 ~* o TICKE Sampled form track. REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 7.50 05/24/2000 7 87670 2 2 7.50 05/24/2000 7 86560 Average 2 3 7.50 06/14/2000 28 2 4 7.50 06/14/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril 01LL Page 2 of 3 ENGINEE~, INC. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/30/2000 ommerce Center leltline (Bldg. A) Texas field test and cast BATCH TII~IE: 5:25am eve Campbell vindy )NCRETE: 85 F r NO: 567714 r w~mIrr ~,~: N/A CUMULATIVE YARDS: 10 ~OMPRESSIVE STRENGTH 3100 3080 FRAC~RE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRE $IVE STRENGTH TES- Date of Service: 05/17/2000 Report No.: 0013072 Client No.: 85229000 Project No.: 94991451 Client: Services: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell 1221 S. Coppell, Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: P-23 PROJECT DATA M~XI.D.: 9349 PLACEMENT DATE: T~Vm SAMeLlO: 7:20am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1 AIR co~rr~NT (%): N/A PLACEMENT IX)CATION: See page 1 05/17/2000 BY: al Cloudy, 72 F c¢ TICKE' Sampled from track. REPORT OF TESTS AG CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 6.00 3 2 6.00 3 3 6.00 3 4 6.00 MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 05/24/2000 7 111930 05/24/2000 7 108870 Average 06/14/2000 28 06/14/2000 28 Technician: Steve Campbell Started: 3:00am Finished: 10:00am ~ Report Distribution: (1) Transwestem Property Company (1) City of Coppell (1) O'Brien & Associates (1) City of Coppell (1) Technistmctures, Inc. (1) Butler Construction This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the w~ 01LL Page 3 of 3 ~, INC. a aivision of lrarmcnn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/30/2000 ',ommerce Center leltline (Bldg. A) l'exas d field test and cast BATCH TIME: 6:40am eve Campbell ~indy ~NCRETE: 83 F r NO: 567718 ~ WEIGHT (per): N/A :UMULATIVE YARDS: 10 '~OMPRESSIVE STRENGTH (psi) 3960 3850 3910 FRACTURE TYPE iugene Harbour Vice President ~n approval of HBC Engineering, Inc.