Northlake 635(5)-LR000516CONCRETE COMPRE IVE STRENGTH TES
Date of Service: 05/08/2000
Client No.: 85229000
Report No.: 0012183
Project No.: 9499145(
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Coppell (
1221 S. E
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir{
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
3-6"
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Piers M/8.9, M/10
PROJECT DATA
M~X I.D.: 9337
PLACEMENT DATE: 05/08/2000
TIME SAMPLED: ll:50am BY: R,
WEATHER CONDITIONS: Clear, wi:
TEMPERATURE (F) - AIR 86 F C(
TRUCK NO: 730 TICKE'
AIR CONTENT (%): N/A trst
PLACEMENT LOCATION:
Pier information and technician time: Sec ReI~
REPORT OF TESTS
AC~
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1 6.00
1 2 6.00
1 3 6.00
1 4 6.00
DATE
TESTED
05/1512000
05/15/2000
06/05/2000
06/05/2000
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 86350
7 87910
Average
28
28
Technician: Roy Montgomery
Report Distribution:
(1) Transwestera Prop~y Company
(!) O'Bricn & Associates
(1) Technistructures, Inc.
(1) Butler ConsUuction
Started:
(1) City of Coppell
(1) City of Coppeli
Finished:
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~
OILL Page I of 1
a division ofl~mmt:an
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/16/2000
ommerce Center
eltline (Bldg. A)
Fexas
d field test and cast
BATCH TIME: 1 l:05am
>y Montgomery
,NCRETE: 87 F
NO: 567248
WEIGHT (pc~: N/A
rt~012182
3LrMULATIVE YARDS: 20
~OMPRESSIVE
STRENGTH
3050
3110
3080
FRACTURE
TYPE
Se aior Project Engineer
ten approval of HBC Engineering, Inc.