Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(5)-LR000508
REPORT OF DRILLED PIERS Project: Coppell Commerce Center 1221 S. Beltline (Bldg. A), Coppell, Texas Report No.: 0012182 Date of Service: 05/08/00 Project No.: 94991456 Driller: 8901 Carpenter Fnvy., Suite 100 Dallas, Texas 75247 Pier Identification Pier Diameter (in.) Technician: R. Montgomery Page: 1 ofl MI8 24 M/8.5 24 MI10 24 Top of Ground Elevation (ft.) N/A N/A N/A Top of Pier Elevation (ft.) N/A N/A N/A Depth to Bearing Stratum from Ground (ft.) 30.50 31.00 33.50 Depth of Pier from Ground (ft.) 34.50 34.00 36.50 Required Penetration (ft.) 3.0 3.0 3.0 Actual Penetration (ft.) 3.50 3.50 3.0 Depth from Top of Concrete (ft.) 32.42 32.50 35.50 Condition of Bottom (wet or dry) Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes 24 Casing Diameter (in.) 24 26.0 24 26.00 Time Concrete wes Placed 11:25 a.m. Cased Depth (ft.) 23.50 Number of Vertical Bars (ea.) 6 6 6 Reinforcing Bar Size (#) 6 6 6 Length of Vertical Bars (ft.) 31.92 32.00 35.0 Time Drilling wes Completed 9:00 a.m. 10:05 a.m. 12:30 p.m. 11:35 a.m. 12:45 p.m.