Loading...
Northlake 635(5)-LR000504CONCRETE COMPR oSIVE STRENGTH TES Date of Service: 04/25/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: Project No.: Project: ~, INC a division of'lim-~un 8901 Carpenter Frwy., Suite #100 Dallan, Texas 75247 0010954 Report Date 05/04/2000 9499145~ Coppell (~ommerce Center 1221 S. ]~eltline (Bldg. A) Coppell, [Texas Services: Obtain samples of flesh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS S~aU~NG~: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: 04/2512000 TIME SAMPLED: 4:35am BY: G WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 57 F c~ TRUCK NO: 842 TICKE AIR CONTENT (%): N/A tmu PLACEMENT LOCATION: Slab-on-grade Sampled from pump. SAMPLE LOCATION: L.5/9.5 REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD finches) TESTED (days) (lbs. force) 1 I 8.00 05/02/2000 7 79430 1 2 8.00 05/02/2000 7 84810 Average I 3 8.00 05/23/2000 28 1 4 8.00 05/23/2000 28 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the wril 0ILL Page 1 of 7 field test and cast BATCH TIME: 3:55am reg Dimock )NCRETE: 75 F rNO: 531359 r WEIGHT (pal'): N/A 2UMULATIVE YARDS: 10 2OMPRESSIVE STI~.ENGTH (psi) 2810 3000 ~10 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPR ' SIVE STRENGTH TES Date of Service: Client No.: Client: Services: 00/25/2000 85229000 Report No.: 0010954 Project No.: 9499145~ Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, 0450 Dallas TX 75251 Project: Coppell 1221 S. Copper Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRAc'rOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS SWREN(;Tn: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: L.3/8.2 PROJECT DATA MIX LD.: 9349 PLACEMENT DATE: 00/25/2000 TIME SAMPLED: 5:20am BY: G WEATHER CONDITIONS: Clear TEMPERATURE (F)- Am 58 F c¢ TRUCK NO: 32 TICKE' Am co~rr~NT (%): N/A PLACEMENT LOCATION: See parc 1 Sampled from truck. REPORT OF TESTS AO CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 4.00 05/02/2000 7 121050 2 2 4.00 05/02/2000 7 120430 Average 2 3 4.00 05/23/2000 28 2 4 4.00 05/23/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 01LL Page 2 of 7 ElxUdNEERI~, II~ a aivision o/1;mmcnn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/04/2000 )mmerce Center leltline (Bldg. A) texas d field test and cast BATCH TIME: 4:40am :eg Dimock ~NCRETE: 75 F ~No: N/A WEIGHT (per): N/A :UMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH (psU 4280 4260 4270 en approval of HBC Engineering, Inc. CONCRETE COMPREoSIVE STRENGTH TES · Date of Service: Client No.: Client: Services: 04/25/2000 85229000 Report No.: 0010954 Project No.: 9499145~ Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, 9450 Dallas TX 75251 Project: Coppell 1221 S. CoppeH Obtain samples of fresh concrete at the placement locations, perform requir{ compressive strength samples. SLUMP: AIR: TEST METHOD: COm~O, CTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLA~r: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: K.5/6 PROJECT DATA Mm[O.: 9349 PLACEMENT DATE: TIME SAMPLED: 7:00am WEATHER CONDITIONS: TE~PE~TURE (v)- AIR 59 TRUCK NO: 32 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 04/25/2000 BY: G Clear F C( TICKE' Sampled from truck. REPORT OF TESTS AC~ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 1 5.00 05/02/2000 7 110410 3 2 5.00 05/02/2000 7 113080 Average 3 3 5.00 05/23/2000 28 3 4 5.00 05/23/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 0ILL Page 3 of 7 a aivision oflrarrm:ma 8901 Carpenter Frwy., Suite #100 Dnllnn, Texas 75247 Report Date 05/04/2000 ,mmerce Center ~eltline (Bldg. A) texas I field test and cast BATClt TIME: 6:30am ~g Dimock )NCRETE: 76 rNO: 531380 ~ W~IGHT (p~: N/A :UMULATIVE YARDS: 10 ~,OMPRESSIVE STRENGTH (ps~) 39~ 40OO 39~0 en approval of HBC Engineering, lac. CONCRETE COMPRE $IVE STRENGTH TES Date of Service: Client No.: Client: Services: 04/25/2000 85229000 Report No.: 0010954 Project No.: 9499145~ Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell ¢ 1221 S. CoppelL Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUM~: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQU~NTS STRENGTH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: L.5/4 PROJECT DATA M~X I~.: 9349 PLACEMENT DATE: TIME SAMPLED: 8:45am WEATHER CONDITIONS: TEMPERATURE (F)- AIR 60 TRUCK NO: 833 Am CONTENT (%): N/A PLACEMENT LOCATION: See page I 04/25/2000 BY: G Clear F C( TICKE' Sampled from truck. REPORT OF TESTS AC~ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inch.) TESTED (days) (lbs. force) 4 1 5.00 05/02/2000 7 107010 4 2 5.00 05/02/2000 7 106290 Average 4 3 5.00 05/23/2000 28 4 4 5.00 05/23/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 0ILL Page 4 of 7 a division ofl~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/04/2000 ommerce Center ~eltline (Bldg. A) Fexas d field test and cast BATCH TIME: 8:10am reg Dimock ~NCRETE: 75 F ;NO: 531398 r W~iG~rr (pc0: N/A :UMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH (psi) 3780 3760 3770 FRACTURE TYPE approval of HBC Engineering, Inc. CONCRETE COMPResSIVE STRENGTH TES Date of Service: Client No.: Client: 04/25/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0010954 Project No.: 9499145~ Project: Coppell 1221 S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLAInt: 22 SPECIFICATION REQUIREMENTS STa~OTm 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: K.5/2 PROJECT DATA M~X LO.: 9349 PLACEMENT DATE: 04/25/2000 TIME SAMPLED: 10:30am BY: G WEATHER CONDITIONS: Clear TEMPERATURE (F)- Am 68 1~ CC TRUCK NO: 745 TICKE~ Am co~vr (%): N/A PLACEMENT LOCATION: See page ! Sampled from U'uck. REPORT OF TESTS AC{ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (dnys) (lbs. force) 5 1 5.25 05/02/2000 7 104780 5 2 5.25 05/02/2000 7 106570 Average 5 3 5.25 05/23/2000 28 5 4 5.25 05/23/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ 01LL Page 5 of 7 ENCdNEERI~, II~ a division ofl~tl-~l~ 8901 Carpenter Frwy., Suite Dnlln~, T~xas 75247 Report Date 05/04/2000 ',ommerce Center leltline (Bldg. A) Fexas d field test and cast BATCH TIME: 9:24am ~g Dimock ,NcRETE: 76 531413 W~XGHT (~e0: N/A :UMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH (p~) 3710 3770 3740 ~n approval of HBC Engineering, Inc. CONCRETE COMPRE oSIVE STRENGTH TES Date of Service: Client No.: Client: 04/25/2000 Report No.: 85229000 Project No.: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, 0450 Dallas TX 75251 SLUMP: AIR: TEST METIIOD: a division of'Warr-~m 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 0010954 Report Date 05/04/2000 9499145~ Coppell ~ommerce Center 1221 S. t~eltline (Bldg. A) Coppell, ~exas Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: 04/25/2000 TIME SAMPLED: lh40am BY: G W~R CONDrrlONS: Clear ax~n, ERnWtau~ 09- Am 73 F C( TaUCKNO: 373 TICKE' Am CONa~n'(~): N/A uNr PLACEMENT LOCATION: See page 1 Sampled from truck. AC~ CONTRACTOm Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 REPORT OF TESTS SAMPLE LOCATION: J/2.5 CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 6 1 6.00 05/02/2000 7 100670 6 2 6.00 05/02/2000 7 100350 Average 6 3 6.00 05/23/2000 28 6 4 6.00 05/23/2000 28 This report is exclusively for the use of the clientindicated above and shall not be reproduced except in full without the writ~ 0ILL Page 6 of 7 .d field test and cast BATCH TIME: 11:03am ~g Dimock ,NCRETE: 77 F NO: 531430 ' W~:Gh'T (Pa: N/A :UMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH (psi) 3560 3550 3560 approval of HBC Engineering, Inc. CONCRETE COMPResSIVE STRENGTH TES Date of Service: 04/25/2000 Report No.: Client No.: 85229000 Project No.: Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 0010954 9499145~ Coppell ( 1221 S. [ Coppell, ' Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLA~T: 22 SPECIFICATION REQUIREMENTS STREN(;TH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 1.2/3.5 PROJECT DATA MIX LD..' 9349 PLACEMENT DATE: 04/25/2000 T1MESAMPLED: 12:50pm BY: (~ WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 78 F cc TRUCK NO: 852 TICKEq nIR CO.rENT (~): N/A tn~r PLACEMENT LOCATION: See page I REPORT OF TESTS AC( CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 7 1 8.00 7 2 8.00 7 3 8.00 7 4 8.00 DATE TESTED 05/02/2000 05/02/2000 05/23/2000 05/23/2000 MAXIMUM AGE LOAD (days) (lbs. force) 7 118400 7 113080 Average 28 28 8901 Carpenter Frwy., Suite #100 Dallan; Texas 75247 Report Date 05104/2000 lommerce Center ~eltline (Bldg. A) rexas d field test and cast BATCH TIME: 12:36pm 'eg Dimock ,NCRETE: 79 F ' NO: 531438 w~m~iT (p~: N/A UMULATIVE YARDS: 10 :OMPRESSIVE STRENGTH (psi) 4190 4000 4100 FRACTURE TYPE Technician: Greg Dimock Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Tcchnistructures, Inc. (1) Buffer Construction Started: 3:00am (1) City of Coppell (1) City of Coppell Finished: 3:00pm ~ E~ring, Inc. Pal Sen This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ il D. Smith, P.E. ior Project Engineer approval of HBC Engineering, lac. 0ILL Page 7 of 7 CONCRETE COMPR IVE STRENGTH TES Date of Service: Client No.: Client: 0410412000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0009025 Project No.: 9499145~ Project: Coppell { 1221 S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STREN~TI{: 3000 psi @ 28 Days 3.0" max N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: G.3/1, I-F1 PROJECT DATA MXX I.D.: 9337 PLACEMENT DATE: 04/04/2000 TIME SAMPLED: h30pm BY: T~ WEATHER CONDITIONS: Clear TEMPERATURE (F)- Am 73 F TRUCK NO: 133 TICKE~ AIR CONTENT (%): N/A usr PLACEMENT LOCATION: Pier information and technician time: See Repo REPORT OF TESTS AC~ CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.50 1 2 5.50 1 3 5.50 1 4 5.50 DATE TESTED 04/11/2000 04/11/2000 05/02/2000 05/02/2000 MAXIMUM AGE LOAD (days) (lbs. force) 7 104880 7 91080 Average 28 143550 28 144450 Average a division of']~l-~t~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 05/04/2000 ommerce Center ~eltline (Bldg. A) texas d field test and cast BATCH TIME: 12:20pm ;try L. Smith ~NCRETE: 78 F NO: 530091 W~IGriT (p~: N/A 0OO09024 :UMULATIVE YARDS: 30 :OMPRESSIVE STRENGTH (psi) 3710 3220 3470 5080 5110 5100 FRACTURE TYPE Technician: Terry L. Smith Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technisa'uctures, Inc. (1) Butler Construction Started: (1) City of Coppcll (1) City of Coppell Finished: This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wfit~ Se~ ior Project Engineer :n approval of HBC Engineering, Inc. OILL Page I of 1