Loading...
Northlake 635(5)-LR000502CONCRETE COMPR IVE STRENGTH TES? Date of Service: 03/31/2000 Client No.: 85229000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: Project No.: Project: 0008709 9499145¢ Coppell ( 1221 S. E Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir{ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 5.0" max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: A/5.1, A/5.5, A/6 PROJECT DATA MIX I J).: 9337 PLACEMENT DATE: 03/31/2000 TIME SAMPLED: 12:30pm BY: T{ WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 69 r cc TRUCK NO: 104 TICKE'I AIR CONTENT (%): NA trN~ PLACEMENT LOCATION: Pier information and technician time: Sec Repol REPORT OF TESTS AC( CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.50 1 2 5.50 I 3 5.50 I 4 5.50 DATE TESTED 0410712000 04/07/2000 04/28/2000 04/28/2000 MAXIMUM AGE LOAD (days) (lbs. force) 7 124460 7 123250 Average 28 137390 28 139930 Average a division of]~'l'at~ll'l 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 05/02/2000 ommerce Center eltline (Bldg. A) Fexas ! field test and cast BATCH TIME: 1 l:50am try L. Smith NCRETE: 66 'NO: 529945 , WmG~rr (pc0: N/A t #0008708 '.UMULATIVE YARDS: 10 OMPRESSIVE STRENGTH (psi) 4360 4380 486O 4950 4910 Technician: Terry L. Smith Report Distribution: (1) Traaswestem Property Company (1) O'Brien & Associates (1) Technistructures, Inc. (1) Butler Construction Started: (1) City of Coppcil (1) City of Coppcll Finished: This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wd~ ~ E~~n~'ng, Inc. Pa~ d D. Smith, P.E. Sen ior Project Engineer :n approval of HBC Engineering, Inc. 01LL Page 1 of 1