Northlake 635(5)-LR000502CONCRETE COMPR IVE STRENGTH TES?
Date of Service: 03/31/2000
Client No.: 85229000
Client:
Transwestern Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Report No.:
Project No.:
Project:
0008709
9499145¢
Coppell (
1221 S. E
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir{
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
5.0" max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
A/5.1, A/5.5, A/6
PROJECT DATA
MIX I J).: 9337
PLACEMENT DATE: 03/31/2000
TIME SAMPLED: 12:30pm BY: T{
WEATHER CONDITIONS: Clear
TEMPERATURE (F)- AIR 69 r cc
TRUCK NO: 104 TICKE'I
AIR CONTENT (%): NA trN~
PLACEMENT LOCATION:
Pier information and technician time: Sec Repol
REPORT OF TESTS
AC(
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1 5.50
1 2 5.50
I 3 5.50
I 4 5.50
DATE
TESTED
0410712000
04/07/2000
04/28/2000
04/28/2000
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 124460
7 123250
Average
28 137390
28 139930
Average
a division of]~'l'at~ll'l
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Report Date
05/02/2000
ommerce Center
eltline (Bldg. A)
Fexas
! field test and cast
BATCH TIME: 1 l:50am
try L. Smith
NCRETE: 66
'NO: 529945
, WmG~rr (pc0: N/A
t #0008708
'.UMULATIVE YARDS: 10
OMPRESSIVE
STRENGTH
(psi)
4360
4380
486O
4950
4910
Technician: Terry L. Smith
Report Distribution:
(1) Traaswestem Property Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
Started:
(1) City of Coppcil
(1) City of Coppcll
Finished:
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wd~
~ E~~n~'ng, Inc.
Pa~ d D. Smith, P.E.
Sen ior Project Engineer
:n approval of HBC Engineering, Inc.
01LL Page 1 of 1