Northlake 635(5)-LR000501CONCRETE COMPRE IVE STRENGTH TES' '?
Date of Service: 03/30/2000 Report No.: 0008591
Client No.: 85229000 Project No.: 94991456
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Coppell C
1221 S. B
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler ConStruction
CONCRETE SUPPLIER: Pioneer
PlatNT: 22
SPECIFICATION REQUIREMENTS
STRENa~I: 3000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: C.5, C/6, C/4
PROJECT DATA
MIX I.D.: 9337
P~CEM~NT DATE: 03/30/2000
TIME SAMPLED: 12:00pm BY: Te
Wr~TmmcoNorrloNS: Cloudy
TEMPERATURE (F)- Am 70 F CO
TRUCK NO: 749 TICKE'I
AIR CONTENT (%): N/A u~i~
PLACEMENT LOCATIONi
Pier information and technician time: Sec Repo~
REPORT OF TESTS
AC(
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.00
1 2 6.00
1 3 6.00
1 4 6.00
DATE
TESTED
0410612000
0410612000
04/27/2000
04/27/2000
MAXIMUlVI
AGE LOAD
(days) (lbs. force)
7 99670
7 89720
Average
28 124150
28 125640
Average
Technician: Terry L. Smith
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Toclmisl~uctttres, Inc.
(1) Butler Construction
Started:
(1) City of Coppell
(1) City of Coppcli
Finished:
Pa
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril~
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
05/01/2000
ommerce Center
eltline (Bldg. A)
?exas
field test and cast
BATCH TIME: 1 l:00am
ry L. Smith
NCRETE: 72 F
NO: 478045
'WEIGI~T (p~: N/A
t #~008590
'.UMULATIVE YARDS: l0
'.OMPRESSIVE
STRENGTH
(psi)
3520
3170
3350
439O
4440
4420
FRACTURE
TYPE
E~ng, Inc.
al D. Smith, P.E.
dot Project Engineer
approval of HBC Engineering, Inc.
01LL Page I of 1