Northlake 635(5)-LR000428
REPORT OF DRILLED PIERS Project: Project No.: Driller: Pier Identification Pier Diameter (in.) Coppell Commerce Center 1221 S. Beltline (Bldg. A), Coppell, Texas 94991456 RepoR No.: Date ofService: Technician: Page: 8901 Carpenter Fnvy., Suite 100 Dallas, Texas 75247 0011379 04/28/00 G. Dimock 1 ofl M/7 24 M/7.5 30 Top of Ground Elevation (ft.) N/A N/A Top of Pier Elevation (ft.) N/A N/A 32 Depth to Bearing Stratum from Ground (ft,) 31 Depth of Pier from Ground (ft.) 35.4 34.4 Required Penetration (ft.) 3.0 3.0 3.4 3.4 Actual Penetration (ft) Depth from Top of Concrete (ft.) 32.9 31.9 Condition of Bottom (wet or dry) Dry Dry Plumb Within Tolerance (yes or no) Yes Yes 26 32 Reinforcing Bar Size (#) Cased Depth (ft.) 30 30 Number of Vertical Bars (ea.) 6 8 6 6 32.0 11:00 a.m. 12:15 p.m. Length of Vertical Bars (ft.) Time Drilling was Completed Time Concrete was Placed 31.3 11:44 a.m. 1:15 p.m.