Loading...
Northlake WE P10C-CS 970303P.O. Box 478 Coppell, Texas 75019 214-462-0022 March 3, 1997 Donna Horton Site Concrete, Inc. 3328 Roy Orr Grand Prairie, Tx 75050-4207 RE: Northlake Woodlands Phase 10C Dear Ms. Horton In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced locations on Saturday, March 1, 1997. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a check for $120.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (214) 304-3679. cc: Finance Department Doug Stevens, Engineering Technician file/ovt.ltr SITE CONCRETE, INC. 3328 Roy On' · (}rand Prairie, TX 75050-4207 · 214-313-0733 · FAX 214-513-0825 Mailing Address: P. O. Box 140096 · Irving, Texas 75014-0096 February 27, 1997 Mr. Larry Davis City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Northlake Woodlands 10C Coppell, Texas Via Fax 304-3570 Dear Mr. Davis: Site Concrete, Inc. requests permission to work on paving at the above referenced project on Saturday, March 1, 1997. Please confirm our request. Thank you for your assistance. Sincerely, SITE CONCRETE, INC. Donna Horton Estimating Secretary Accepted by: Larry Davis City of Coppell Date l0 'd SE :80 flH£ tS-I.E-83z[