Northlake 635(5)-LR000427CONCRETE COMPRE $IVE STRENGTH TES
Date of Service: 03/28/2000
Client No.: 85229000
Report No.: 0008373
Project No.: 9499145,
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Coppell ~
1221 S. 1
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requin
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 27
SPECWICATION REQUIRE~mNTS
STRENaTI~: 3000 psi @ 28 Days
5.0" Max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
F/2,F/3, F_J3
PROJECT DATA
MIX I.D.: 9337
PLACEMENT DATE: 03/28/2000
TIME SAMPLED: lhl0am BY: T
W~X~mRCO~ITIO~S: light rain
TEMPERATURE (F) - AIR 71 F C~
TRUCK NO: 346 TICKE
AIR CONTENT (%): N/A t~
PLACEMENT LOCATION:
Pier information and technician time: See Rel~
REPORT OF TESTS
AC
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 5.00
1 2 5.00
1 3 5.00
1 4 5.00
DATE
TESTED
0410412000
0410412000
04/25/2000
04/25/2000
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 127550
7 130040
Average
28 141530
28 141350
Average
Technician: Terry L. Smith
Report Distribution:
(1) Transwestern Property Company
(1) O'Brien & Associates
(1) Tochnistructures, Inc.
(1) Butler Construction
Started:
(I) City of Coppell
(1) City of Coppell
Finished:
P~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
a division of
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/27/2000
~mmerce Center
~eltline (Bldg. A)
Texas
field test and cast
BATCH TIME: 10:00am
~.rry L. Smith
)NCRETE: 76 V
r NO: 446015
T WEIGHT (per): N/A
~rt g0008372
CUMULATIVE YARDS: 10
EOMPRESSIVE
STRENGTH
(psi)
4510
4600
4560
5010
5000
5010
FRACTURE
TYPE
E~ng, lnc.
tul D. Smith, P.E.
nior Project Engineer
Xen approval of HBC Engineering, Inc.
01LL Page 1 of 1