Northlake 635(5)-LR000420CONCRETE COMPRI .oSIVE STRENGTH TESt'
Date of Service: 03/21/2000 Report No.: 0007654
Client No.: 85229000 Project No.: 94991451
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services:
Coppell
1221 S.
Coppell,
Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
a division oflfermcnn
8901 Carpenter Frwy., Suite#100
Dallas, Texas 75247
Report Date
04/20/2000
',ommerce Center
;eltline (Bldg. A)
Fexas
d field test and cast
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 23
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
K/8, K/7, K/6
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.00
1 2 6.00
PROJECT DATA
mx l.O.: 9337
PLACEMENT OATE: 03/21/2000
TIME SAMPLED: ll:30am BY: T~
WEATHER CONDITIONS: Clear
TEMPERATURE (F)- AIR 70 v c¢
TRUCK NO: 749 TICKE'
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
Pier information and technician time: See Repc
REPORT OF TESTS
1 3 6.00
1 4 6.0O
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
Technician: Terry L. Smith
Report Distribution:
(1) Transwestern Properly Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
03/28/2000 7 120970
03/28/2000 7 114970
Average
04/18/2000 28 152250
04/18/2000 28 147020
Average
AC~
Started: Finished: ~
(1) City of Coppcll
(1) City of Coppcll Pa
Se:
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ
BATCH TIME: 10:10am
'~rry L. Smith
~NCRETE: 78 F
NO: 475001
WEIGHT (pcf): N/A
rt #0007653
2UMULATIVE YARDS: 10
~'OMPRESSIVE
STRENGTH
(psi)
4280
4070
4180
5380
5200
5290
ring,Inc.
ul D. Smith, P.E.
flor Project Engineer
FRACTURE
TYPE
en approval of HBC Engineering, Inc.
0ILL Page I of 1