Northlake 635(5)-LR000417CONCRETE COMP SIVE STRENGTH TEo
Date of Service:
Client No.:
Client:
04/05/2000
85229000
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive,//450
Dallas TX 75251
Report No.: 00091:
Project No.: 94991,
Project: Coppe
1221
Copp
Services: Obtain samples of fresh concrete at the placement locations, perform requ
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
3000 psi @ 28 Days
5.0" Max
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A.5/1.6, B.3/1. D.5/1, C.5/1
PROJECT DATA
MOt I.D.: 9337
PLACEMENT DATE: 04/05/200
TIME SAMPLED: 11:00am BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F). AIR 76 1~
TRUCK NO: 836 TIC~
AIR CONTENT (%): N/A u
PLACEMENT LOCATION:
Pier information and technician time: See R,
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
I 6.00 04/12/2000
2 6.00 04/12/2000
3 6.00 05/03/2000
4 6.00 05/03/2000
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 124360
7 114950
Average
28
28
Technician: Terry L. Smith
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
Started: Finished: I'~
(1) City of Coppell
(I) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v
O1LL Page 1 of 1
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
~2
~56
Report Date
04/17/2000
Commerce Center
Beltline (Bldg. A)
Texas
ired field test and cast
) BATCH TIME: 10:40am
Terry L. Smith
:ONCRETE: 76
~T NO: 505590
~ W~I(mT (pc0: N/A
.~rt g0009151
~CUMULATIVE YARDS: N/A
coMPREssW~
STRENC flt FRACTURE
(psi) TYPE
4070
4240
, Inc.
~aul D. Smith, P.E.
',enior Project Engineer
5tten approval of HBC Engineering, Inc.