Northlake 635(5)-LR000413CONCRETE COMPRE SIVE STRENGTH TESt
Date of Service:
Client No.:
Client:
Services:
03/21/2000
85229000
Report No.: 0007654
Project No.: 9499145~
Transwestem Property Company
Atto: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Project: Coppell
1221 S.
Coppell,
Obtain samples of fresh concrete at the placement locations, perform required
strength samples.
a div~sk,n of 'lrmmctm
8901 Carp~ter Frwy., gulf. #100
Dallas, Texas 75247
Report Date
04/13/2000
:ommerco Center
lelfline (Bldg. A)
rexas
field test and cast compressive
SLUMP:
AIR:
TEST METHOD:
co~a~nc-roR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 23
SPECIfiCATION RgQU]RgM~HTS
STRZNGTH: 3000 psi ~ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
K/8, K/7, K/6
CYLINDER MEASURED
MARKED SLIYMP
~ET NO. (inches)
1 1 6.00
1 2 6.00
PROJECT DATA
m~x LO.: 9337
PLACEMENT DATE: 03/21/2000
TIME SAM[PLED: 11:30am ~Y: T,
WEATHER CONDITIONS: Clear
TErm'ZaXTtU~ 0~-~m 70 F CZ
TRUCKr~O: 749 TICKE'~
nm coNTm~rr ¢./.): N/A u~
P~ACEMENT LOCATIOt~:
1 3 6.00
1 4 6.00
REPORT OF TESTS
Teclmidan: Terry L. Smith
Report Distribution:
(1) Trmswestem Property Company
(1) O~rien & Associatm
(1) Techni.~xuctures, Inc.
(1) Butler Ccmtmcticm
MAXIMUM
DATE AGE LOAD
TESTED (days) 0hz. forc~)
03/28/2000 7 120970
03/28/2000 7 114970
Average
04/18/2000 28
04/18/2000 28
AD
BATCH TIIVI~: lO:lOam
~rry L. Smith
gCRETE: 78 F
~o: 475001
r w~IGnx (~c0: N/A
Started: Finished: I-~
(1) City of Copp¢ll
(1) CUy of copp~ Pa
s~
This repc~t is exclusively fc~ the use of the client Indicated above and ~all not be reproduced except in full without the writt~
~0007653
NJMULATIVE YARDS: 10
~OMPR.YSSIVE
STRENGTH
428O
4070
4180
E~'g, Inc.
al D. Smith, P.E.
ior Project Engineer
, spproval of HBC Engineering. Inc~
01LL Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
03/21/2000
85229000
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Report No.: 000765
Project No.: 949914
Project: Coppel
1221 S,
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 23
SPECIFICATION REQmREMENTS
3000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
K/8, K/7, K/6
PROJECT DATA
M~X I.D.: 9337
PLACEMENT DATE: 03/21/200£
TIME SAMPLED: 1 1:30am BY:
WEATHER CONDITIONS: Clea~
TEMPERATURE (F) - AIR 70 F
TRUCK NO: 749 TICI~
AIR CONTENT (%): N/A ~
PLACEMENT LOCATION:
Pier information and technician time: See Re
REPORT OF TESTS
A
CYLINDER
MARKED
SET NO.
MEASURED MAXIMUM
SLUM~ DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
1 i 6.00 03/28/2000 7 120970
1 2 6.00 03/28/2000 7 114970
Average
1 3 6.00 04/18/2000 28
I 4 6.00 04/18/2000 28
Technician: Terry L. Smith Started: Finished:
Report Distribution:
(1) Transwestem Property Company (I) City of Coppell
(1) O'Brien & Associates (1) City of Coppell
(1) Technistructures, Inc.
(1) Butler Construction
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr
01LL Page 1 of 1
ENGINEERING, INC.
a division of~[lilli'~.l~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/2000
56
Conunerce Center
Beltline (Bldg. A)
Texas
ed field test and cast
BATCH TIME: 10:10am
Ferry L. Smith
:ONCRETE: 78 V
eT NO: 475001
Irt WEIGh'T (pa~: N/A
~on #0007653
2CUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH
(psi)
4280
4070
4180
FRACTURE
TYPE
' En , Inc.
aul D. Smith, P.E.
mior Project Engineer
~tten approval of HBC Engineering, Inc.
CONCRETE COMPR SIVE STRENGTH TE 'F
Date of Service:
Client No.:
Client:
03/28/2000 Report No.:
85229000 Project No.:
Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
000837
949914
Coppe[
1221S.
CoppeI
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: F/2,F/3, E/3
PROJECT DATA
M~X I.~.: 9337
PLACEMENT DATE: 03/28/200C
TIME SAMPLED: ll:10am BY:
W~AX}mR CO~ITIONS: light ra
TEMPERATURE (F) - AIR 71 F ~
TRUCK NO: 346 TICK
AIR CONTENT (%): N/A t~
PLACEMENT LOCATION:
Pier information and technician time: See R~
REPORT OF TESTS
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 5.00
I 2 5.00
1 3 5.00
i 4 5.00
DATE
TESTED
04/04/2000
04/04/2000
04/25/2000
04/25/2000
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 127550
7 130040
Average
28
28
a aivision of l~'m:un
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/2000
Commerce Center
Beltline (Bldg. A)
Texas
~d field test and cast
BATCH TIME: 10:00am
Ferry L. Smith
FI
:oNcRETE: 76 V
STNO: 446015
Irt W~mHT (pc0: N/A
~ort g0008372
:CUMULATIVE YARDS: lO
COMPRESSIVE
STRENGTH
(psi)
4510
4600
4560
FRACTURE
TYPE
Technician: Terry L. Smith
Report Distribution:
(1) Tmnswcstem Property Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
Started:
(1) City of Coppell
(1) City of Coppcll
Finished:
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr
I-'I~ En~%g, Inc.
Paul D. Smith, P.E.
S, ;nior Project Engineer
tten approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPResSIVE STRENGTH TES.'
Date of Service:
Client No.:
Client:
03/30/2000
85229000
Transwestern Property Company
Attn: James Gaspard
12221 Merit Drive, 8450
Dallas TX 75251
Report No.: 0008591
Project No.: 9499145
Project: Coppell
1221 S.
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requin
compressive strength samples.
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/2000
',ommerce Center
~eltline (Bldg. A)
Texas
field test and cast
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
5.0" Max
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
C.5, C/6, C/4
PROJECT DATA
MIX I~.: 9337
PLACEMENT DATE: 03/30/2000
TIME SAMPLED: 12:00pm BY: T
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 70 F C~
TRUCK NO: 749 TICKLE
AIR CONTENT (%): N/A rrm
PLACEMENT LOCATION:
Pier information and technician time: See Rep(
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 6.00 04/06/2000 7 99670
1 2 6.00 04/06/2000 7 89720
Average
1 3 6.00 04/27/2000 28
1 4 6.00 04/27/2000 28
AC
Technician: Terry L. Smith Started: Finished: .['-'L~
Report Distribution:
(I) Transwestem Property Company (1) City of Coppell
(1) O'Brien & Associates (1) City of Coppell Pa
(1) Teehnistructures, Inc. Se~
(1) Butler Construction
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ
01LL Page 1 of 1
BATCH TIME: 1 l:00am
:rry L. Smith
)NCRETE: 72 F
NO: 478045
'WEm~rr (pc0: N/A
rt 90008590
2UMULATIVE YARDS: 10
2OMPRESSIVE
STRENGTH
(psi)
3520
3170
3350
~ing, Inc.
ul D. Smith, P.E.
flor Project Engineer
FRACTURE
TYPE
en approval of HBC Engineering, inc.
CONCRETE COMPRESSIVE STRENGTH TEb f
Date of Service: 04/04/2000
Client No.: 85229000
Report No.: 000902
Project No.: 949914 6
,~ division of lrarmenn
8901 Carpenter Frwy., Suite #100_
Dallas, Texas 75247
Report Date
04/13/2000
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services:
Coppe[
1221 S.
Coppel
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
SLUMP: 3.0" max
Am: N/A
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
G.3/1, H/1
MEASURED
SLUMP
(inches)
DATE
TESTED
04/1112000
04/1112000
CYLINDER
MARKED
SET NO.
05/02/2000
05/02/2000
1 1 5.5O
1 2 5.50
Started:
(1) City of Coppell
(1) City of Coppell
PROJECT DATA
M~X I.D.: 9337
PLACEMENT DATE: 04/04/200C
TIME SAMPLED: l:30pm BY:
WEATHER CONDITIONS: Clear
T~MPERATURE (~3 - Am 73 F
TRUCK NO: 133 Tic~
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Pier information and technician time: See Re
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
28
28
7 104880
7 91080
Average
1 3 5.50
1 4 5.50
Technician: Terry L. Smith
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
Finished: I-~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr
Commerce Center
Beltline (Bldg. A)
Texas
,d field test and cast
BATCIt TIME: 12:20pm
Ferry L. Smith
:ONCRE'IX: 78
STNO: 530091
WEIGHT (pcf): N/A
~ort ~X)9024
2CUMULATIVE YARDS: 30
COMPRESSIVE
STRENGTH
(psi)
3710
3220
3470
· , Inc.
aul D. Smith, P.E.
;nior Project Engineer
FRACTURE
TYPE
tten approval of HBC Engineering, inc.
01LL Page 1 of 1
CONCRETE COMPI SSIVE STRENGTH TE;ST
Date of Service:
Client No.:
Client:
Services:
03/27/2000 Report No.:
85229000 Project No.:
Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
00082
94991
Coppe
1221
Copp,
Obtain samples of fresh concrete at the placement locations, perform req~
cempressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi @ 28 Days
5.0" Max
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
L/5, L/4, L/3, L/2
PROJECT DATA
M~X I J>.: 9337
PLACEMENT DATE: 03/27/20(
TIME SAMPLED: 2:05pm BY:
WEATHER CONDITIONS: Light
TEMPERATURE (F)- AIR 56 F
TRUCK NO: 746 TII
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Pier information and technician time: See
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
I I 5.25
1 2 5.25
I 3 5.25
I 4 5.25
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
04/03/2000 7 100440
04/03/2000 7 97860
Average
04/24/2000 28
04/24/2000 28
Technician: Terry L. Smith
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(I) Technistructures, Inc.
(l) Butler Construction
Started: Finished:
(1) City of Coppell
(1) City of Coppell
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the v
0ILL Page 1 of 1
a dMsion of]~ff'iW.~l
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
36
456
Report Date
04/13/2000
11 Commerce Center
;. Beltline (Bldg. A)
11, Texas
tired field test and cast
0 BATCHTI~IE: l:15pm
Terry L. Smith
'ain
CONCRETE: 60 t*
~LET NO: 450180
rNIT WEIGHT (pc0: N/A
eport #0008235
kCCUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH
(psi)
3550
3460
3510
FRACTURE
TYPE
, Inc.
Paul D. Smith, P.E.
Senior Project Engineer
'ritten approval of HBC Engineering, Inc.