Loading...
Northlake 635(5)-LR000406REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. A), Coppell, Texas 94991457 Report No.: 0009245 Date of Service:04/06/00 Technician: J. Smith Page: lof3 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Gl2 24 G/3 24 J/4 J/4.5 J/5 J/5.5 J/6 J/6.5 L.5/3.9 J/7 24 24 24 24 24 24 24 24 54 54 54 54 54 54 54 54 54 54 54 J/7.5 24 Top of Pier Elevation (ft) 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 Req. Depth from Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 17.5 Initial Depth of Pier from Existing Grade (fi) 18.0 18.5 18.0 Dry Yes N/A N/A 17.5 8:20 a.m. 11:05 a.m. Final Depth of Pier from Existing Grade (ft) Depth from Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Number of Vertical Bars (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling was Completed 18.3 18.5 18.0 Dry Yes N/A N/A 17.5 8:55 a.m. 11:15 a.m. Time Concrete was Placed 18.1 18.3 17.8 Dry Yes N/A N/A 6 6 17.3 9:10 a.m. 11:45 a.m. Dry 18.2 18.4 17.9 Dry Yes N/A N/A 17.4 9:30 a.m. 12:50 p.m. Yes 18.5 18.5 18.0 Dry Yes N/A N/A 6 6 17.5 9:58 a.m. 12:35 p.m. N/A 18.0 18.3 17.8 Dry Yes N/A N/A 6 17.5 10:15 a.m. 12:40 p.m. N/A 18.3 18.5 18.0 Dry Yes N/A N/A 17.5 10:30 a.m. 12:45 p.m. 17.0 18.3 18.6 18.1 Dry Yes N/A N/A 6 6 17.6 10:50 a.m. 1:25 p.m. 8:00 a,m, 18.4 18,5 18.0 Dry Yes N/A N/A 17.5 11:10 a.m. 1:30 p.m. 11:00 a.m. 18.0 18.0 17.5 Dry Yes N/A N/A 17.0 11:35 a.m. 1:35 p.m. REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. A), Coppell, Texas 94991457 Report No.: 0009245 Date of Service: 04/06/00 Technician: J. Smith Page: 2 of 3 8901 Carpeater Fnvy., Suite #100 Dallas, Texas 75247 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth from Exist. Grade (ft) Initial Depth of Pier from Existing Grade (fi) Final Depth of Pier from Existing Grade (ft) J/8 24 Plumb Within Tolerance (yes or no) J/8.5 24 J/9 24 J/9.5 24 J/10 24 D/4 24 D/4.5 24 D/5 24 D/5.5 24 D/6 24 D/6.5 24 54 54 54 54 54 54 54 54 54 54 54 95.5 95.5 95.5 95.5 95.5 95,5 95.5 95.5 95.5 95.5 95.5 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.5 18.5 18.2 18.0 18.0 18.1 18.0 18.0 18.2 18.0 18.0 18.4 18.0 1:40 p.m. 3:50 p.m. Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 . 6 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 17.6 17.5 17.0 17.4 17.6 17.0 17.5 17.5 17.5 17.5 17.0 Time Drilling was Completed 11:45a.m. 12:15 p.m. 12:40 p.m. 12:59 p.m. 1:25 p.m. 1:48 p.m. 2:15 p.m. 2:30 p.m. 2:45 p.m. 3:10 p.m. 3:25 p.m. 4:00 p.m. 4:05 p.m. 4:30 p.m. 4:35 p.m. 3:55 p.m. 2:15 p.m. Time Concrete was Placed 2:10 p.m. 2:00 p.m. 2:25 p.m. Casing Diameter (in) Yes N~ N~ N~ N~ N~ N~ N~ N~ N~ N/A N~ N~ N~ 18.6 18.5 18.0 18.4 18.6 18.0 18.5 18.5 18.5 18.5 18.0 Depth from Top of Concrete (ft) 18.1 18.0 17.5 17.9 18.1 17.5 18.0 18.0 18.0 18.0 17.5 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes REPORT OF DRILLED BELLED PIERS 8901 Carpenter Fr~y., Suite #100 Dallas, Texas 75247 Project: Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. A), Coppell, Texas 94991457 Report No.: 0009245 Date of Service:04/06/00 Technician: J. Smith Page: 3of3 Pier Identification D/7 D/7.5 D/8 D/8.5 D/9 D/9.5 D/10 C.9/10 Pier Diameter (in.) 24 24 24 24 24 24 24 24 Bell Diameter (in.) 54 54 54 54 54 54 54 54 Top of Pier Elevation (ft) 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 Req. Depth from Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier from Existing Grade (ft) 18.0 18.3 18.0 18.0 18.1 18.4 18.0 18.5 Final Depth of Pier from Existing Grade (ft) 18.5 18.5 18.0 18.2 18.1 18.5 18.0 18.5 Depth from Top of Concrete (ft) 18.0 18.0 17.5 17.5 17.6 18.0 17.5 18.0 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 Length of Vertical Bars (fL) 17.5 17.5 17.0 17.2 17.1 17.5 17.0 17.5 Time Drilling was Completed 3:58 p.m. 4:10 p.m. 4:28 p.m. 4:40 p.m. 4:50 p.m. 4:15 p.m. 4:38 p.m. 3:10 p.m. Time Concrete was Placed 4:40 p.m. 4:45 p.m. 4:50 p.m. 5:15 p.m. 5:00 p.m. 4:55 p.m. 5:10 p.m. 5:05 p.m.