Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(5)-LR000405
REPORT OF DRILLED BELLED PIERS ENGINEERll~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Project: Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. A), Coppell, Texas 94991457 Report No.: 0009151 Date of Service: 04/05/00 Technician: J. Smith Page: 1 of 2 ii Pier Identification A.5/1.6 B.3/1 D.5/1 G.5/1 H.5/1 K.8/1 L.5/1.8 M/14.6 M/6.6 M/9.4 E.4/1 Pier Diameter (in.) 30 30 30 30 30 30 30 30 30 30 30 Bell Diameter (in.) 60 60 60 60 60 60 60 60 60 60 60 Top of Pier Elevation (ft) 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95,0 95.0 95.0 95.0 Req. Depth from Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier from Existing Grade (ft) 18.8 19.0 18.8 19,8 18.0 18.6 18.5 18.6 18.0 18.3 18.0 Final Depth of Pier from Existing Grade (ft) 19.0 20.0 18.9 19.7 18.5 18.7 18.5 18.8 18.0 18.5 18.0 Depth from Top of Concrete (ft) 18.5 19.5 18.4 19.2 18.0 18.2 18.0 18.3 17.5 18.0 17.5 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/^ N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 8 8 8 8 8 8 8 8 8 8 8 Reinforcing Bar Size (#) 7 · 7 7 7 7 7 7 7 7 7 7 Length of Vertical Bare (ft.) 18.0 19.0 17.9 18.7 17.5 17.7 17.5 17.8 17.0 17.5 17.0 Time Drilling was Completed 7:45a.m. 8:10 a.m. 8:25 a.m. 8:40a.m. 9:15 a.m. 9:30a.m. 9:49a.m. 10:20a.m. 10:30a.m. 11:30a.m. 11:45a.m. Time Concrete was Placed 11:00a.m. 10:45a.m. 10:50a.m. 10:55a.m. 11:40a.m. 11:45a.m. 11:51a.m. 11:59a.m. 1:30p.m. 1:40p.m. 1:37p.m. rY W W ILl