Loading...
Northlake 635(5)-LR000403IN-PLACE DENSITY ' STING Date of Service: 03/28/2000 Client No.: 85229000 Client: Report No.: 0008343 Project No.: 94991456 a division of'l~-atam 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date O4/03/2OOO Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Deseription PROJECT DATA Laboratory Test Method: ASTM D-698 Lt. brown sand w/tan & brown sandstone Moisture% TEST NO TEST LOCATION 14.0 Project: Maximum Density pcf 112.5 Coppell £ 1221 S. B Coppell, Field Test t~ thod: ASTM )2922 ASTM )3017 I [oisture -i !/+2% ommerce Center ~ltline (Bldg. A) ?exas Project Requirements Density 95% FIELD DENSITY TESTS Sanitary Sewer Trench Backfill 130 Grid line K.5/2.5 131 Grid line H/2.5 132 Grid line K.5/6 133 Grid line B.5, west end of building 134 Grid line B.5, west end of building Telephone Line 135 Grid line F.5 from lines 1 to 4 PROBE LIFT/ M/D MOISTUI DEPTH ELEV No. (%) 6" Final 1 6" Final 1 6" Final 1 6" Final 1 6" 1' BTOT 1 6" Final 1 Test results Oli this report meet project specification. BTOT = below top of trench 12 12 1; 1 1, IE DRY DENSITY DENSITY (pcf) (% max) :.1 106.9 95 ;.4 107.1 95 :.2 107.4 96 ,6 107.4 96 · .1 106.9 95 ;.2 108.5 96 Technician: Conan Cantwell Report Distribution: (!) Transwestem Property Company (1) O'Brien & Associates (I) Technistructures, Inc. (1) Butler Construction Started: 12:00p (1) City of Coppell (1) City of Coppell Finished: 1:30p This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrim Sen or Project Engineer :n approval of HBC Engineering, Inc. 07SDS Page I of I