Northlake 635(5)-LR000225REPORT OF IN-PLACL"'DENSITY TESTS
Date of Service: 02/22/2000
Client No.: 85229000
Client: Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services: In-place density tests.
Report No.: 0005052
Project No.: 9499145~
Project: Coppell £
1221 S. B
Coppell,
On this date, an HBC Engineering technician arrived at the above refE
jobsite as scheduled for in-place density tests. In-place density te
date were cancelled due to jobsite not ready yet. HBC's technician m
north notch out and watering of Building A.
Technician Time: 12:00 p.m. to 2:00 p.m.
Technician: Mike Odom
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
(1) City of Coppelt
(1) City of Coppell
a division of'l~-~nn
8901 Carpenter Fl-wy., Suite #100
Dnllnn, Texas 75247
'.ommerce Center
eltline (Bldg. A)
?exas
Report Date
02/25/2000
fenced
sts for this
)nitored the
~ Et~g, Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt(
Pat ~1 D. Smith, P.E.
Sen or Project Engineer
approval of HBC Engineering, Inc.
99SDS PaRe 1 of 1
REPORT OF IN-PLACL 'DENSITY TESTS
Date of Service: 02/18/2000 Report No.:
Client No.: 85229000 Project No.:
Client: Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
0004782
94991456
Coppell £
1221 S. B
Coppell,
Services: In-place density tests.
On this date, an HBC En~ineering technician arrived at the above ref~
jobsite as scheduled for in-place density tests. Contractor was not
in-place density testing. While on the jobsite, HBC's technician pic
sample of the flexbase for a moisture-density relationship test (proc
Technician Time: 9:00 a.m. to 11:00 a.m.
Technician: Mike Odom
Report Distribution:
(1) Transwestem Property Company
(I) O'Brien & Associates
(1) Tcchnistructures, Inc.
(1) Butler Construction
(i) City of Coppell
(1) City of Coppell
Pal
Sen
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrim
a division of
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Report Date
02/25/2000
ommerce Center
eltline (Bldg. A)
?exas
cenced
ceady for
ced up a
:or).
l~-~g, Inc.
ti D. Smith, P.E.
.or Project Engineer
n approval of HBC Engineering, Inc.
99SDS PaRe I of I