Loading...
Northlake 635(5)-LR000224IN-PLACE DENSITY T TING Date of Service: Client No.: Client: 02/17/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0004690 Project No.: 9499145{ Project: Coppell £ 1221 S. B Coppell, Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description PROJECT DATA Laboratory Test Method: Moisture % Field Test M ASTMi ASTMi 1V[axilnum Densit~ pcf 1 Gray & med brown clay w/tan & gray limestone 18.0 106.5 +3°~ FIELD DENSITY TESTS TEST NO TEST LOCATION PROBE LIFT/ M/D MOISTU DEPTH ELEV No. (%) Moisture Conditioned Fill 101 70' southwest from northeast comer of Building A 102 70' southwest from northeast comer of Building A 103 Retest of#101 104 Retest of#102 105 80' south, 5' west from northeast comer 4th 1 2, 5th 1 2: 1 2: 1 6th 1 2: An asterisk (*) appears next to test results which do NOT meet the project Second Trip: 3:00 p.m. to 4:30 p.m. Field Results Reported To: Everett w/Butler, Robt. w/Wier Technician: Mike Odom Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technistructures, Inc. (1) Butler Construction Started: 7:00a (1) City of Coppell (1) City of Coppell Finished: 8:30a a division of l rarra~nr~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/24/2000 '.ommerce Center eltline (Bldg. A) ?exas ~thod: ~2922 )3017 Project Requirements loisture Density or above 92% ~ DRY DENSITY DENSITY (% max) L7 87.9 86.7 k4 98.1 ~.2 100.1 L2 99.7 specifications. 83 * 81' 92 94 94 ~ ~~mg, Inc. Pm Sen This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrim ti D. Smith, P.E. ior Project Engineer n approval of HBC Engineering, Inc. 07SS Page 1 of I