Loading...
Northlake 635(5)-LR000218IN-PLACE DENSITY Tr STING Date of Service: Client No.: Client: Services: 02/14/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 In-place density testing. Report No.: 0004341 Project No.: 94991456 Project: Coppell C 1221 S. B, Coppell, PROJECT DATA CONTRACTOR: Laboratory Test Method: Field Test M Butler Construction ASTM D-698 ASTM ASTM MOISTURE DENSITY RELATIONS: Maximum M/D No. Description Moisture % Density pcf 1 Gray &mcd brown clay w/tan & gray limestone 18.0 106.5 +3% FIELD DENSITY TESTS ENCdNEERI~, a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ommerce Center fltline (Bldg. A) TEST PROBE LIFT/ M/D MOISTUI NO TEST LOCATION DEPTH ELEV No. (%) Moisture Conditioned Bldg Pad 92 Building line F/2 6" 4th 1 21 93 Building line F/2 6" 5th 1 21 94 Building line F/2 6" 6th 1 22 95 Building line G.5/2.5 6" 1st 1 21 96 Building line G.5/2.5 6" 2nd 1 21 97 Building line G.5/2.5 6" 3rd 1 21 98 Building line H.5/3.3 6" 1st 1 22 99 Building line H.5/3.3 6" 2nd 1 22 100 Building line I-1.5/3.3 6" 3rd 1 22 Test results on this report meet project specification. Started: 2:00p (1) City of Coppcll (l) City of Coppell Finished: 4:00p 'exas Technician: Roy Montgomery Report Distribution: (I) Transwestern Property Company (1) O'Brien & Associates (i) Technistructures, Inc. (1) Butler Construction Report Date 02/18/2000 thod: )2922 )3017 Project Requirements [oisture Density or above 92% DRY DENSITY (pc0 DENSITY (% max) .0 101.7 96 .3 102.7 96 .2 100.0 94 .8 101.4 95 .3 103.6 97 .0 103.0 97 .0 102.8 97 .0 100.3 94 .8 100.9 95 ~ E~ng, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt{ Pau 1 D. Smith, P.E. Seni or Project Engineer approval of HBC Engineering, Inc. 07SDS Page I of I