Loading...
Northlake 635(5)-LR0002171N-PLACE DENSITY T,, STING Date of Service: Client No.: Client: Services: 02/11/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. 1 2 3 Description Report No.: 0004250 Project No.: 94991456 Project: Coppell £ 1221 S. B Coppell, PROJECT DATA Laboratory Test Method: ASTM D-698 Lt. brown, tan & gray shaley clay w/calcareous nodules Gray & med brown clay w/tan & gray limestone Moisture% Field Test 1V ASTM ASTM Maximum Density pcf Med to dk brown clay 24.5 18.0 96.0 106.5 a division oflrmmetm 8901 Carpenter Frwy., Suite#100 Dallas, Texas 75247 Report Date 02/17/2000 ommerce Center :ltline (Bldg. A) ?exas thod: )2922 )3017 Project Requirements I ioisture Density +3oA +3°/, TEST NO TEST LOCATION Moisture Conditioned Bldg Pad 81 Building line B.5/4.5 82 Building line B/4 83 Building line C.3/3 84 Building line B/2 Water Injected Subgrade 85 Building line C.3/9 86 Building line C/7 87 Building line C.5/5.5 88 Building line A.5/6 21.5 100.0 +3°/ FIELD DENSITY TESTS PROBE LIFT/ M/D MOIST[ DEPTH ELEV No. (%) 6" 7th 2 6" 8th 2 6" 7th 2 6" 8th 2 6" Final 3 6" Final 3 6" Final 3 6" Final 3 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the writt~ 07SDS Page I of 2 or above or above or above 92% 92% 92% ~E DRY DENSITY (pc0 2!;.0 100.2 2;'_8 101.2 2~.7 101.7 2~.0 102.3 2:;.4 94.6 2:;.7 93.2 2,[.8 95.0 2, k9 93.8 DENSITY (% max) 94 95 96 96 95 93 95 94 approval of HBC Engineering, Inc. Report No.: TEST NO 0004250 TEST LOCATION 89 Building line B/7.5 90 Building line A.5/9.5 91 Building line B.5/7 Second Trip: 5:00 p.m. to 5:30 p.m. PROBE LIFT/ M/D MOISTUI DEPTH ELEV No. (%) 6" Final 3 25 6" Final 3 24 6" Final 3 25 Test results on this report meet project specification. ~E DRY DENSITY DENSITY (pct') (% max) .2 94.8 95 .9 94.3 94 .6 96.1 96 Technician: Roy Montgomery Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (I) Technistructures, inc. (I) Butler Construction Started: 1 l:00a (1) City of Coppell (1) City of Coppcll Finished: 1:00p Pat Sen This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the writt~ 07SDS Page 2 of 2 tl D. Smith, P.E. or Project Engineer :n approval of HBC Engineering, Inc. IN-PLACE DENSITY C' ' STING Date of Service: Client No.: Client: Services: 02/09/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive,/t450 Dallas TX 75251 In-place density testing. CONTRACTOR: Butler Construction Report No.: 0004041 Project No.: 9499145¢ Project: Coppell ( 1221 S. E Coppell, MOISTURE DENSITY RELATIONS: M/D No. Description PROJECT DATA Laboratory Test Method: ASTM D-698 Gray & med brown clay w/tan & gray limestone Moisture % Field Test ASTM ASTM Maximum Density pcf TEST NO TEST LOCATION 18.0 106.5 +3~ a aivision ofl~ 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 02/17/2000 ommerce Center eltline (Bldg. A) Fexas ~thod: D2922 D3017 Project Requirements doisture Density or above 92% Moisture Conditioned Bldg Pad 69 Building line D.5/3 70 Building line D.5/3 71 Building line D.5/3 72 Building line D/2.3 73 Building line D/2.3 74 Building line D/2.3 75 Building line E.3/3 76 Building line E.3/3 77 Building line E.3/3 78 Building line D/2.8 79 Building line D/2.8 80 Building line D/2.8 FIELD DENSITY TESTS PROBE LIFT~ M/D MOISTU DEPTH ELEV No. (%) 6" 1 st 1 2 6" 2nd 1 2 6" 3rd 1 2 6" 1 st 1 2 6" 2nd 1 2 6" 3rd 1 2 6" 1st 1 2 6" 2nd 1 2 6" 3rd 1 2 6" 1st I 2 6" 2nd 1 2 6" 3rd 1 2 DRY DENSITY DENSITY (pcf) (% max) 1.0 101.2 95 1.8 100.8 95 L3 101.5 95 1.7 102.3 96 Y..5 99.9 94 Y..8 101.7 96 1.7 106.0 100 1.0 100.8 95 1.5 101.7 96 3.0 101.8 96 2.7 100.3 94 2.6 102.7 96 Test results on this report meet project specification. This report is exclusively for the use of thc client indicated above and ahall not bc reproduced except in tull without thc wriV 07SDS Page I of 2 on approval of HBC Engineer/ns, Inc. IN-PLACE DENSITY T"STING Date of Service: Client No.: Client: 02/07/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0003841 Project No.: 94991456 Project: Coppell t2 1221 S. B Coppell, Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test IV ASTM ASTM MOISTURE DENSITY RELATIONS: MID No. Description 1 Gray & med brown clay w/tan & gray limestone Maximum Moisture % Density pcf 18.0 106.5 FIELD DENSITY TESTS TEST NO TEST LOCATION 6O 61 Building line B.8/3.8 62 Building line C.5/3 63 Building line C.3/1.8 64 Building line B.3/2.5 65 Building line B/3 66 Building line C/2 67 Building line C.8/3 68 Building line B/2.5 PROBE LIFT/ M/D MOISTU DEPTH ELEV No. (%) Moisture Conditioned Subgrade Building line C.5/4.8 6" 6th 1 2 6" 6th 1 2 6" 4th 1 2~ 6" 4th 1 2, 6" 4th 1 2, 6" 5th 1 21 6" 5th 1 6" 6th 1 2~ 6" 6th 1 2 Test results on this report meet project specification. Technician: Roy Montgomery Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (!) Technistructures, inc. (I) Butler Construction Started: 1:30p (I) City of Coppell (1) City of Coppcll Finished: 3:00p ENONEERI~, lNG a division ofl~sm-'~c~n 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ommerce Center eltline (Bldg. A) ?exas Report Date 02/17/2000 ~thod: )2922 )3017 Project Requirements loisture Density +3°A. or above 92% RE DRY DENSITY DENSITY (pc0 (% max) · .7 100.7 95 ~.0 101.2 95 L6 100.0 94 k0 99.2 93 k0 99.7 94 ~.2 100.7 95 L9 99.6 94 L0 99.0 93 ~.2 99.9 94 Sen ior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt approval of HBC Engineering, Inc. 07SDS Page 1 of I IN-PLACE DENSITY STING Date of Service: Client No.: Client: 02/06/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: Project No.: Project: 0003739 9499145¢ Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Labo rato ry Test Method: ASTM D-698 MOISTURE DENSITY RELATIONS: M/D No. Description Moisture % Maximum Density pcf 1 Gray & med brown clay w/tan & gray limestone 18.0 106.5 FIELD DENSITY TESTS TEST NO TEST LOCATION Coppell( 1221S.[ Coppell, Moisture Conditioned Subgrade 54 Building line C/1.8 55 Building line B/2 56 Building line A.8/3 57 Building line C/3.5 58 Building line B/4 59 Building line A.8/5 Field Test ASTM ASTM +3~ Technician: Roy Montgomery Report Distribution: (1) Transwestem Propel~ry Company (1) O'Brien & Associates (1) Technistmctures, Inc. (1) Butler Construction PROBE LIFT/ M/D MOIST[ DEPTH ELEV No. (%) 6" 3rd 1 2 6" 3rd 1 2 6" 3rd 1 2 6" 5th 1 2 6" 5th 1 2 6" 5th 1 2 Test results on this report meet project specification. a division of'[~tr'dlJ~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/17/2000 ommerce Center ,eltline (Bldg. A) rexas Finished: 12:30p Started: I l:00a (1) City of Coppell (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ ethod: D2922 D3017 Project Requirements ~loisture Density or above 92% tE DRY DENSITY (pc0 DENSITY (% max) 1.3 99.9 94 4.6 97.9 92 4.0 98.3 92 1.6 100.6 95 1.8 100.3 94 2.3 101.2 95 Set ior Project Engineer en approval of HBC Engineering, Inc. 07SDS Page 1 of 1 tN-PLACE DENSITY lr TING Date of Service: Client No.: Client: Services: 02/05/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: Report No.: 0003735 Project No.: 9499145~ Project: Coppell (2 1221 S. B Coppell, Elq(illqF_~lll~, 1I~ a division 8901 Carpenter Frwy. Suite#100 Dallas, Texas 75247 Report Date 02/17/2000 ',ommerce Center eltline (Bldg. A) ?exas PROJECT DATA Laboratory Test Method: ASTM D-698 M/D No. Description Moisture % 1 Gray & med brown clay w/tan & gray limestone 180.0 FIELD DENSITY TESTS Field Test M ASTM ASTM Maximum Density pcf 106.5 +3°/, ~thod: )2922 )3017 Project Requirements loisture Density or above 92% TEST PROBE LIFT/ NO TEST LOCATION DEPTH ELEV Moisture Conditioned Subgrade 42 Building line C.5/4 6" 43 Building line B.8/5 6" 44 Building line A.5/4.2 6" 45 Building line B/4.1 6" 46 Building line B/3.8 6" 47 Building line C/3.5 6" 48 Building line C/2.5 6" 49 Building line B/2 6" 50 Building line B/3 6" 51 Building line B.8/3.5 6" 52 Building line C.5/2 6" 53 Building line B.5/1.8 6" M/D MOISTU no. (%) 3rd 1 2 3rd 1 2~ 3rd 1 2 4th 1 2; 4th 1 2~ 4th 1 21 1st 1 2 1st 1 2 1st 1 2 2nd 1 2nd 1 21 2nd I tE DRY DENSITY DENSITY (poi) (% max) ..8 99.3 93 !.3 101.2 95 ..5 100.6 95 !.7 100.5 94 L6 100.2 94 k0 101.2 95 ..7 99.7 94 ..0 100.3 94 ~.7 101.7 96 !.6 100.6 95 ~.2 100.1 94 L3 100.8 95 Test results on this report meet project specification. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt 07SDS Page 1 of 2 m approval of HBC Engineering, Inc. IN-PLACE DENSITY 'STING Date of Service: 02/04/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description PROJECT DATA Laboratory Test Method: ASTM D-698 1 Gray & med brown clay w/tan & gray limestone TEST NO TEST LOCATION Moisture Conditioned Pad 38 Building line C/5 39 Building line A.5/4.8 40 Building line C.3/4.3 41 Building line B/4 Second Trip: 5:00 p.m. Technician: Roy Montgomery Report Distribution: (I) Transwestem Property Company (1) O'Brien & Associates (I) Teehnistructures, Inc. (1) Butler Construction Report No.: 0003684 Moisture Project No.: 9499145~ Project: Coppell £ 1221 S. lq Coppell, Field Test NO ASTMi ASTM Maximum Density pcf 2L6 2L2 2,1.0 2 L0 18.0 106.5 +3~ FIELD DENSITY TESTS PROBE LIFT/ M/D MOISTU DEPTH ELEV No. (%) 6" 1st 1 6" 1st 1 6" 2nd 1 6" 2nd 1 Test results on this report meet project specification. to 6:00 p.m. Started: 11:00a (1) City of Coppcll (1) City of Coppcll Finished: 12:00p Pa Set This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ a division oflK~n'at:nn 8901 Carpenter Frwy. Sulte #100 Dallas, Texas 75247 ',ommerce Center eltline (Bldg. A) ['exas ~thod: ~2922 ~3017 Project Requirements 4oistu re Density or above 92% ~E DRY DENSITY (pcO Report Date 02/17/2000 ;n~g, Inc. Jl D. Smith, P.E. ior Project Engineer DENSITY (% max) 100.3 94 101.6 95 98.7 93 103.1 97 en approval of HBC Engineering, inc. 07SDS Page I of 1