Loading...
Northlake 635(5)-LR000103MOISTURE DENSITY . '"ELATIONS Date of Service: Client No.: Client: Services: 12/28/1999 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, 0450 Dallas TX 75251 CONTRACTOR: PROJECT DATA DATE SAMPLED: Report No.: 9934666 Project No.: 94991456 Project: Coppell C 1221 S. B~ Coppell, ~1 12/28/1999 a division 8901 Carpenter Frwy., Suite #100 Dalla% Texas 75247 Report Date 01/03/2000 ~rmnerce Center ;ltline (Bldg. A) 'exas X~ST FOR: Select Fill MATERIAL: Lt brown sand w/tan & brown sandstone TEST M~X~tOO: ASTM D-698 MAXIMUM DRY DENSITY, pct': 112.5 OPTIMUM MOISTURE CONTENT, %: 14.0 REQUIREMENTS LIQUID LIMIT: 32 PLASTIC LIMIT: 17 Test results on this report meet project specifications as noted above. SAMPLED BY: SAMPLE LOCATION: REPORT OF TEST R. Montgomery Imported stoc MOISTURE DENSIT~ ~pile RELATIONS 117 Zero air v fids c trve Sp~c Lf~C C favit~ 115 0.00 l)ens~ty 113 · · / \ 10 12 14 16 18 20 22 MOISTURE CO1~ ~ENT (%) Technician: Roy Montgomery Report Distribution: (1) Transwestera Property Company (1) O'Brien & Associates (i) Technistructures, Inc. (1) Butler Construction (!) City of Coppell (1) City of Coppell ~ E~ring, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writte: Paul D. Smith, P,E. ti Seni ~r Project Engineer ~ approval of HBC Engineering, Inc. 06SS Page I of 1