Loading...
Northlake 635(5)-LR000411CONCRETE COMPR~a'IVE STRENGTH TES ~~ - ENGUaEERU~rc,n~rc. a division of l~erra[on 8901 Carpenter Frwy., Suite ft100 Dallas, Texas 75247 Re ort No.: 0008709 Report Date Date of Service: 03/31/2000 p 04/11/2000 Client No.: 85229000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #4S0 Dallas TX 7S2S 1 Project No.: 94991456 Project: Coppell Commerce Center 1221 S. Beltline (Bldg. A) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA coNTRACTOR: Butler Construction CONCRETE SUPPLIER: PlOrieer PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days SLUMP: S.O~~ maX AIR: N/A TEST METHOD: ASTM 0-143 ASTM C-172 ASTM C-39 Mix I.D.: 9337 PLACEMENT DATE: 03/31/2000 BATCH TIME: 11:SOam TIME SAMPLED: 12:3Opm BY: Terry L. Smith WEATHER CONDITIONS: Clear TEMPERATURE (F) -AIR 69 F CONCRETE: 66 F TRUCK NO: lO4 TICKET NO: 529945 AIR CONTENT (%): NA UNIT WEIGHT (pcf): NIA PLACEMENT LOCATION: Pier information and technician time: See Report #0008708 SAMPLE LOCATION: A/5.1, A/5.5, A/6 REPORT OF TESTS CYLIIVDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 1 1 S.SO 04/07/2000 7 1 2 S.SO 04/07/2000 7 1 3 S.SO 04/28/2000 28 1 4 S.SO 04/28/2000 28 MAXIMUM LOAD (lbs. force) ACCUMULATIVE YARDS: LO COMPRESSIVE STRENGTH FRACTURE (Psi) TYPE 124460 4400 123250 4360 Average 4380 Technician: Terry L. Smith Started: Fin,shed: ~ E ginee 'ng, Inc. Report Distribution: (1) Transwes[em Property Company (l) City of Coppell (1) O'Brien & Associates (1) City of Coppell Paul D. Sfnith, P.E. (1) Technistructures, Inc. Senior Project Engineer (l) Butler Construction This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc o1LL Page 1 of 1