Loading...
Northlake WE P10C-CS 941027DEVELOPMENT REVIEW COMMI EE ENGINEERING COMMENTS ITEM: Northlake Woodlands East No. 10, Phase C, ~ Plat, to allow the development of 93 single-family homes, located west of MacArthur Blvd.; east of Mallard, at the request of l~pton Engineering, Inc. DRC DATE: October 27, 1994 and November 3, 1994 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (393-1016) COMMENT STATUS: .n.'~..~ · o~,~'~ ~a~nT.~ ov ,/FINAL Final Plat Comments: 1. The correct visibility easemem should be shown at the intersection of Bethel School with MacArthur Blvd. Please refer to the Subdivision Regulations for that information. 2. Please provide the volume and page number of the existing drainage easement adjacent to lot 36, Block H. DEVELOPMENT REVIEW COMMI EE ENGINEERING COMMENTS Northlake Woodlands East No. 10, Phase C, Fbtal Plat, to allow the development of 93 single-family homes, located west of MacArthur Blvd.; east of Mallard, at the request of lipton Engineering, Inc. DRC DATE: October 27, 1994 and November 3, 1994 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (393-1016) COMMENT STATUS: Final Plat Comments: 1. The correct visibility easemem should be shown at the intersection of Bethel School with MacArthur Blvd. Please refer to the Subdivision Regulations for that information. 2. Please label the existing drainage easemem adjacem to lot 36, Block H. Also, provide the volume and page number. 3. Please reevaluate Lots 28-30 Block to provide an easement for the Irving Water Line.