Northlake WE P10C-CS 941021/' ,-.~-/' /~ The City W,th A Beautiful Future
October 21, 1994
Mr. Steve Parsons
102 Meadowcreek Road
Coppell, Texas 75019
P O Box 478
Coppell, Texas 75019
214-462-0022
RE: Northlake Woodlands East 10C
Development Fee Assessment
Dear Mr. Parsons:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Northlake Woodlands East 10 C.
Please provide a check made payable to the City of Coppell in the amount of $ 61,380.00 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment
List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be calculated.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Asst. City Manager/Dir. Public Works/City Engineer
cc:
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Howard Pafford, Utilities Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
OCTOBER 21,1994
NORTHLAKE WOODLANDS EAST NO. 10 (PHASE C)
Total Credit Due Revised Amount
Fees Due from 12/85 Total Fees Due
Payment Due Prior To
Council
Approval
Water Impact Fee $ 60,450.00 $ 20,460.00 $ 39,990.00 $ 39,990.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 9,300.00 0 9,300.00 0
(100% due at Issuance of Building Permit)
Wastewater Impact Fee 41,850.00 20,460.00 21,390.00 21,390.00
(100% due prior to Council Approval)
~ewer Tap Inspection Fee 9,300.00 0 9,300.00 0
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 4,650.00 0 4,650.00 0
(100% due at Issuance of Building Permi0
Water Meter Fee (Domestic) 2,069.25 0 2,069.25 0
(100% due at Issuance of Building Permit)
Water Meter Deposit 2,790.00 0 2,790.00 0
(100% due at Issuance of Building Permit)
Irrigation Meter Deposit pending 0 pending 0
(100% due at Issuance of Water Meters)
Street Sign Fee 1,101.02 400.40 700.62 0
(100% due prior to Acceptance of Project)
~treet Light Fee * information 4,494.40 information 0
(100% due prior to Acceptance of Project) not available not available
Park Fee 13,950.00
(50% due prior to Council Approval) (50% - 6,975) 6,975.00 0
(50% due prior to Issuance of Building Permit) (50% - 6,975) 6,975.00
Construction Inspection Fee need submittal 8,151.97 need submittal 0
(2% of Project Cost due prior to Preconst. Mtg.) of contracts of contracts
TOTAL FEES DUE $97,164.87 [
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL II$ 61,380.00
* Street light fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once
the plan is submitted, $292.60 per light will be assessed.
NOTE: The only remaining credit for the fees paid in 12/85 are inspection fees and street light
fees.
DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKS
MEMORANDUM
October 18, 1994
Mike Martin, E.I.T. ~
Howard Pafford, Utilities Superintenden
Development Fees for Northlake Woodlands
'~ast iO-C
The following fees should be assessed and collected on
referenced project.
Water Impact Fee:
93 - 5/8" x 3/4" Domestic Meter/s = 93 ESU's
Info - not availableIrrigation Meter/s = ESU's
- Fireline Meter/s = ESU's
Total 93 ESU's @ $650.00 ea = $60,450.00
100% due prior to Council approval of the final plat.
the above
Wastewater Impact
93 - 5/8" x 3/4" Domestic Meter/s = 93 ESU's
Total 93 ESU's @ $450.00 ea = $41,850.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
93 Connections @ $100.00 each = $9,300.00
100% due prior to issuance of building permit for residential. (Or in
ithe case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
93 Connections ~ $100.00 each = $9,300.00
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
93 lots @ $50.00/lot = $4,650.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
93 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $2,069.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation)
Info. not available Irrigation Meter/s ~
100% due prior to issuance of water meter/s.
Water Meter Deposit (Residential)
93 Meters @ $30.00 ea = $2,790.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit - Information not available
Meters ~ $35.00 ea = $
100% due prior to issuance of water meters.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $ 1%~50 ~
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
....... ~ ,
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Development Fees
Page 4
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 5
STREET SIGN ASSESSMENT
for North Lake Woodlands East lO-C
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 6 381.24
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 6 581.10
OTHER
No outlet (blade) 11.60 1 11.60
Curve Siqns 63.54 2 127.08
TOTAL $1,101.02