Loading...
Northlake WE P10C-CS 941103TIPTON ENGINEERING, INC. ENGINEERING · SURVEYING · PLANNING 40:215 6330 BeltLine Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX 226-1946 November 3, 1994 Mr. Aml Patel, E.I.T. Graduate Engineer CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 ge~ NORTHLAKE WOODLANDS EAST NO. 10, PHASE C, FINAL PLAT COPPELL, TEXAS Dear Mr. Patel: With reference to your letter dated October 26, 1994, we are listing below the responses to the Developmem Engineering commems: We have provided a signed plat. We have provided an access for Block D, Lot 21 to the alley on the plat and a 20' drainage easement at the location shown on the plans. We have provided revisions to the Drainage Plans. In accordance with the City of Coppell Subdivision Ordinance, all intersection radii connecting local street to local street shows a minimum of 25' radius. General Comment. We have provided on the plat access for Block D, Lot 21, to the alley. 7. We have made revisions to the inlets. Mr. Atul Patel November 3, 1994 Page No. 2 o 11. 12. 13. 14. 15. 16. 17. 18. On Page 7 of the Paving Plans, we have shown the curb inlets and sizes on Mallard Drive at the location shown on the plans. On Page 8 of the Paving Plans, we have moved the inlet. , In accordance with the City of Coppell Subdivision Ordinance, we have provided a 20' drainage easement on Page 11 of the Storm Sewer Plan for Line "A". We have constructed a minimum 21" lateral for inlets 10' wide or greater. We have provided a minimum 20' drainage easement for the 33" RCP on Page 12 of the Storm Sewer Plan for Line "B". We have also shown the sizes of the laterals and RCP for the Storm Sewer along Blue Jay. On Page 13 of the Storm Sewer Plan, we have labeled Lot 23, shown the size of the laterals and RCP's and provided a drainage easement for Section A-A. On Page 15 of the Water and Sewer Plan, we have provided a minimum 20' sanitary sewer easement for the 10" sewer line. We have also provided a manhole at the end of the 8" sanitary sewer line on Brant Circle and a 2" blowoff at the end of the water line on Brant Circle. General Comment. On Page 17 of the Erosion Control Plan, we have installed silt fences at the locations shown on the plans. We have modified Drainage Plans for the proposed grading. We have shown the flow arrows on the street and alleys of the Grading Plans and also the locations of the inlets on the Grading Plans. Mr. Aml Patel, E.I.T. November 3, 1994 Page No. 3 This concludes our review of your commems. If you have any questions or if we can furnish additional information, do not hesitate to contact our office. ~-Sifl~c~rely, ) TIPTON EN~//IN ERING, INC. President PA:ea