121 BP Phase 1-LR000216 GEOTECHNICAL AND ~ F;J I'-'1 U P ENWRONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 160 P.O. Box 802047 REPORT DATE: 02-16-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 02-07-00 TECHNICIAN: T. Belew PAGE: 1 of 1 General Contractor:iWestciiffe, Inc. .Weather Conditions: Cloudy I Roofing Contractor: M & G Roofing I Location of Work: I Building 5, roof, A to F and 1 to 11 Operations Observed: i Application of a flood coat of hot asphalt covered with gravel ballast. Items Observed: Yes No Items Observed: ~ Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x .Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and~or Adhesion Test Performed: , x Attachments: x I Specified Temperatures I Asphalt Kettle Temperature:I 500~ I +,"- 25 F IApplication (EVT): I 450= I +/- 25 F Actual Temperatures Asphalt / Pitch Kettle Temperature: ! Time I Temp. Application (EVT): Time Temp. Type III, Asphalt 9:30 amI 520:' Type III, Asphalt 10:10 am 450° Type III. Asphalt 3:00 pmi 525° Type III, AsphatI 3:10 pm 470° Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/mm Mr. Randy Pliler (1) Bear Creek Construction/ Mr. Brian Holdgate .......... (1) Mr. Hank Metzger .... .!424 S-bTT- DR. · SJ -c 4.?.3 · BALL.AS '=~-~-~'5 -,"-;:'E]'~Z,4] 35C S6C-9 · :.AX [21-'~ ~.5-'..3- ~2,~ ..... GEOTECHNICAL AND ! ~ I~! r-i U J~ ENV:RONMENTAL C:ONSULTANTS : REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 161 P.O. Box 602047 REPORT DATE: 02-16-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN' Mr. John Walsh DATE OBSERVED: 02-08-00 TECHNICIAN: T. Belew PAGE: 1 of 1 General Contractor: Westcliffe, Inc. Weather Conditions: [Clear Roofing Contractor:!M & G Roofing Temperature Range: 56~/75° Location of Work: Roof, Building 5. A to F from 1 to 11 Operations Observed: Application of a flood coat of hot asphalt covered with gravel ballast. Items Observed: Yes No Items Observed: Yes No Roofincj Materials As Specified: ,x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conformin§ Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x I Specified Temperatures Asphalt Kettle Temperature:I 500° I +/- 25 F IApplication (EVT): I 450° I +/- 25 F Actual Temperatures Asphalt / Pitch Kettle Temperature: j Time Temp. IApplication (EVT): Time Temp. Type III, Asphaltl2:00 pmI 525= I Not being placed 2:20 pm = Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/mm Mr. Randy Pliler (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger GEOTECHNICAL AND j G J~J r-'l I I j~ ENV RONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 162 P.O. Box 802047 REPORT DATE: 02-16-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 02-09-00 TECHNICIAN: T. Belew PAGE: 1 of 1 General Contractor: Westcliffe, Inc. Weather Conditions: Clear [Roofing Contractor: M & G Roofing Temperature Range: 58°/80© I Location of Work: I Roof, Building 5, A to F from 1 to 11 I Operations Observed: I Application of a flood coat of hot asphalt covered with gravel ballast. Application of modified (torch down) base flashing. application of metal flashing. Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Inste'.'ed this Date: x Materials Stored as Required: x Deck Inspected this Da:e: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x I Specified Temperatures I Asphalt Kettle Temperature: J 500° I+/- 25 F JApplication (:=VT):I I F Actual Temperatures Asphalt / Pitch Kettle Temperature: I Time Temp. JApp:ic@tio~ (EVT'): J Time J Temp. Type III, AsphaltJ12:00 pm 520:' J Type III, ~,sphah!12:15 pmJ 475° Distribution: (1) The Industrial Group/ Scbmitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates,/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Ke:th E. Atkins (1) Campbell Associates/ KEA/mm Mr. Randy Pliler (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TE_-.'-21-~] 35C ~:'3 ;~A,'. ~-214"-_~5:C3-9