Loading...
121 BP Phase 1-LR000210 GEOTECHN;C~'.L AND E~ F:=I I'"'1 I I F= ENV~RONHENT&L CONSULTANTS . CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 164 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 02-10-00 ATTN: Mr. John Walsh TECHNICIAN: E Steadman CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 100'N. 10'W of NW Corner of Bldg. "C" 60/180 2 Paving: 130'N, 10'E of NW Corner of Bldg. "C" 130/180 Design Information i Source of Concrete I Mix Identification Specified Strength p.s.i. ~ Lattimore 42 4000 Test Results setloy..derI !Age Testl*o lLoad Oompres,ive 'AverageStren th No. ID Date 'rested lbs. Strength p.s.i, i p.s.i. 1 2649 02-17-00 7 103790 3670 2649 03-09-00 28 131840 4660 2649 03-09-00 28 137880 4880 4770 2649 Hold 2 2650 02-17-00 7 94770 3350 2650 03-09-00 28 111320 3940 2650 03-09-00 28 116530 4120 4030 2650 Hold Cylinder Data ' Set I Cylinder ! I Timeof ! Concrete Air ! Ticket Number No. ~ ID Slump i Sample Air T~.mp. Temp. Entrainment I 1 2649 5.50 5:35 AM 56 65 5.0 3099051 2 2650 5.50 6:50 AM 55 65 4.4 3099058 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe, Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Mr. Randy Pillar Keith E. Atkins (1) City of Coppell/Building Inspections KEA/sa/rt (11) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75225 · 'E_ [214] 350 5600 · F~'~. [2;4] 250 00~9 GEOTECHNICAL AND ~ ~ I'--1 I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 164 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 02-10-00 ATTN: Mr. John Walsh TECHNICIAN: F. Steadman CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 100'N. 10'W of NW Corner of Bldg. "C" 60/180 2 Paving: 130'N. 10'E of NW Corner of Bldg. "C" 130/180 Design Information ISource of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 42 4000 Test Results Set CylinderI I Age,Test Total Load Compressive Average Strength No. ID Date Tested lbs. Strength p.s.i, p.s.i. 1 2649 02-17-00 7 103790 3670 2649 03-09-00 28 2649 03-09-00 28 2649 Hold 2 2650 02-17-00 7 94770 3350 2650 03-09-00 28 2650 03-09-00 28 2650 Hold Cylinder Data ' Set Cylinder i Time of i Concrete Air Ticket Number No. ID Slump I Sample Air Temp. I Temp. Entrainment 1 2649 5.50 5:35 AM 56 65 5.0 3099051 2 2650 5.50 6:50 AM 55 65 4.4 3099058 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe. Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa/rt (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger ......... 2424 STUTZ DR · SUITE 400 · DALLAS. TX 75235 · -E. [214] 350 5600 ,, r~ [214] 350 0019