Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
121 BP Phase 1-LR000207
GEOTECHNICAL AND - ~ F:=I I'-'1 I I F:~ ENVIRONMENTAL CONSULTANTS ! REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 152 P.O. Box 802047 REPORT DATE: 02-07-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 01-25-00 TECHNICIAN: T. Belew PAGE: 1 of 1 J GeneraI-Contractor: !Westcliffe, Inc. lWeather:Conditions: I Partly Cloudy Roofing Contractor:lM & G Roofing Temperature Range: 137° / 56° I Location.-of Work:.. I Building 5, column line A to F and 1 to 11 tOperations Observed: IApplication of 1" insulation board attached to the metal decking using screws and washers covered with 3 plys of fiber glass felt paper using hot asphalt to attach each ply. Items Observed: Yes No Items:Observed:-..-:.: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x J . Specified TemPeratures .- .:- J Asphalt Kettle Temperature:I 500°' I +/- 25 F JApplication (EVT): I 450° I +/-25 F ...... :ACttial Temperatures '" Asphalt / Pitch Kettle Temperature: J Time I Temp. JApplication(EVT):Asphalt Time JTemp. Type III, Asphalt~ 2:00 520° ~ Type III, 2:15 450° Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/mm Mr. Randy Pliler (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SdlTE 400 * DALLAS. TX 75235 * T~L [214] 350 5600 * FAX [2"1~4]'350 0019 GEOTECHNICAL AND j G I::::J r-1 U ~ ENVIRONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. !53 P.O. Box 802047 REPORT DATE: 02-07-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 01-26-00 TECHNICIAN: T. Belew PAGE: 1 of 1 J Genetal Contractor: JWestcliffe, Inc. Jweath'ei~' COnditions:.. J Partly Cloudy Roofing':Contractor; I U & G Roofing JTemperature Range: ] 37°/48© JLocation:=~Work:.... .... JBuilding 5, A to F and 1 to 11 Operatigns Observed: JApplication of 1" insulation board attached to metal deck using screws and washers covered with 3 ply of fiber glass felt paper using hot asphalt to attach each ply application of modified base torch down at premeter. JWorkCompleted: J Insulation: 1456 Sq.ft Membrane: 1456 Sq.ft Items:ObServed: ...... :::Yes..No Items ObserVed:'~' YES:.. N~- Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x ............. . Specified Temperatures - ' :" :'--- ' TM ...... '~' sphalt Kettle Temperature:J 500° J +/- 25 F JApplication (EVT): J 450° J +/- 25 F . ~- .... .. ":. Actual Temperatures .... '.:.. 'i i-: Asphalt/PitchKettleTemperature: J Time I Temp. IApplication(EVT):Asphalt Time ITemp. Type III, Asphalt~ 11:00 525° I Type III, 11:30 460° Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler KEA/mm (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. SUIT~ ~0 · DALLAS. T)~'-75235 TEL [214] 350 5'~)0 · FAX [214] 350 001~