Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
121 BP Phase 1-LR000204 (2)
GEOTECHNICAL AND i G J~J I'--1 U F== ENVIP, ONMENTAL CONSULTANTS j REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 149 P.O. Box 802047 REPORT DATE: 02-04-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 01-21-00 TECHNICIAN: T. Belew PAGE: 1 of 1 J Genefal Ce;ntractOr: JWestcliffe, Inc. JWeather Conditions: J Clear/Windy J Roofing Contractor:lu & G Roofing ITemperature Range: 138°/58© J Location of Work: J Building 5, roof column line A to F from 1 to 11. JOperations Observed: 'JApplication of 1" fesco insulation board attached to the metal decking using screws and washers covered with 3 plys of fiberglass felt paper using hot asphalt to attach each ply, Items Observed::::-. Yes No Items Observed: YES:: NO Roofing Materials As Specified: X Roof Sketch Attached: X Labels Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed this Date: Materials Stored as Required: X Deck Inspected this Date: X Non Conforming Materials Noted: X Photograph's taken this Date: Pull Test and/or Adhesion Test Performed: X Attachments: J .... Specified Temperatures - - :: ."..' .... .--- :': J Asphalt Kettle Temperature:I 500® I+/- 25 F IApplication (EVT):I 4 0o I +/- 25 F " Actual Temperatures Typo Ill Asphalt/ 1:00pm 525° 1:35pm 470° Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KENje Mr. Randy Pillar (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STU'I:~ DR.. · SUITE 400 '. DALLAS. TX 75235 · TEL [214] 350 5600 · FAX [214] 350 00la/ GEOTECHNICAL AND ~ F~ r-'l I I F=a ENVIRONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 154 P.O. Box 802047 REPORT DATE: 02-04-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 01-24-00 TECHNICIAN: T. Belew PAGE: 1 of 1 I General. Contractor:tWestcliffe, Inc. IWeather.Condifions: I Partly Cloudy Roofing. Contract0r:lU & G Roofing ITempe'ratitre Range:: I o/o Location of Work- 5, A to to .............. · ..... ilBuilding Roof F between 1 11 Operations Observed: IApplication of Fesco board attached to metal deck using screws and washers covered with 3 plys of fiber glass felt paper using hot asphalt to attach each ply. Items Observed::' Yes No Items Obsetved~i:..:ii: -. ' ....... Yes- :No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x I ' ' Specified Temperatures "~ I ..... Asphalt Kettle Temperature: 500° +/- 25 F Application (EVT): 450° +/- 25 F Actual Temperatures ..... -"' Asphalt/Pitch Kettle Temperature: J Time Temp. IApplication (EVT): attime Time I Te°mp' Type III, Asphalt]12:00 PM 525° I Not being applied 12:30A Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/mm Mr. Randy Pliler (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 752~35 · TEL [214] 3.50 5600· FAX [214] 350 001~)