Loading...
121 BP Phase 1-LR000127 g~OT£CHNICal AND I I~ ~l I~1 II p I:N¥1RONMENTAL CONSULTANTS . REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 148 P.O. Box 802047 REPORT DATE: 01-27-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 A'FTN: Mr. John Walsh DATE OBSERVED: 01-19-00 TECHNICIAN: T. Belew PAGE: 1 of 1 General Contractor: I Westcliffe, Inc. Weather Conditions: I Clear Roofing Contractor:lM & G Roofing Temperature Range: I 70° Location of Work: I Building 5 column line A to F and 1 to 11 Operations Observed: IApplication of 1" fesco board attached to metal deck using screws and washers covered with 3 plys of fiber glass felt paper using hot asphalt to attached each ply Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x I Specified Temperatures I Asphalt Kettle Temperature:I 500= I +/- 25 f IApplication (EVT):I 450°I +/- 25 f Actual Temperatures Asphalt / Pitch Kettle Temperature: I Time Temp. IApplication (EVT): Time Temp. Type III, Asphalt~l:00 PMI 525° I Type III, Asphalt 1:35 PM 450° Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler KA/mm (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STL;~Z dk. · SUITE ~-00 · DALLAS. TX 7523~'--TEL [214] 350 5600 · FAX [214] 350'0~19