REPORT OF BUILT-UP ROOFING OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 148
P.O. Box 802047 REPORT DATE: 01-27-00
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
A'FTN: Mr. John Walsh DATE OBSERVED: 01-19-00
TECHNICIAN: T. Belew
PAGE: 1 of 1
General Contractor: I Westcliffe, Inc. Weather Conditions: I Clear
Roofing Contractor:lM & G Roofing Temperature Range: I 70°
Location of Work: I Building 5 column line A to F and 1 to 11
Operations Observed: IApplication of 1" fesco board attached to metal deck using
screws and washers covered with 3 plys of fiber glass felt paper
using hot asphalt to attached each ply
Items Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x Debris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
Pull Test and/or Adhesion Test Performed: x Attachments: x
I Specified Temperatures I
Asphalt Kettle Temperature:I 500= I +/- 25 f IApplication (EVT):I 450°I +/- 25 f
Actual Temperatures
Asphalt / Pitch Kettle Temperature: I Time Temp. IApplication (EVT): Time Temp.
Type III, Asphalt~l:00 PMI 525° I Type III, Asphalt 1:35 PM 450°
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure
(1) Campbell Associates/ Keith E. Atkins
Mr. Randy Pliler KA/mm