REPORT OF BUILT-UP ROOFING OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 147
P.O. Box 802047 REPORT DATE: 01-20-00
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Welsh DATE OBSERVED: 01-17-00
TECHNICIAN: T. Belew
PAGE: 1 of 1
General Contractor: J Westcliffe, Inc. JWeather Conditions: I Partly Cloudy
Roofing Contractor: J M & G Roofing ITemperature Range: J 68°/75°
Location of Work: I Roof building 4, A to F, 1 to 19
J Operations Observed: J Application of a flood coat of hot asphalt covered with
gravel
ballast
Items Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x Debris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
Pull Test and/or Adhesion Test Performed: x Attachments: x
I Specified Temperatures J
AsphaLt Kettle Temperature:J 500° J +/- 25 F JApplication (EVT): J 450° J +/- 25 F
Actual Temperatures
Asphalt / Pitch Kettle Temperature: / Time Temp. JApplication (EVT): Time J Temp.
Type III, Asphalt J1:30 PM 520° J Type III, Asphalt 2:15 PMJ 475°
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Welsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/mm
Mr. Randy Pliler
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STJ-Z DR. · SUITE 400 * DALLAS. TX 75235 * -EL ]214] 350 5600 · FAX [2J4] 350 0019