Loading...
121 BP Phase 1-LR000120 GEOTECI-INICAL AND J~ J==J I--1 I I ~ ENVIRONMENTAL CONSULTANTS . REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 147 P.O. Box 802047 REPORT DATE: 01-20-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Welsh DATE OBSERVED: 01-17-00 TECHNICIAN: T. Belew PAGE: 1 of 1 General Contractor: J Westcliffe, Inc. JWeather Conditions: I Partly Cloudy Roofing Contractor: J M & G Roofing ITemperature Range: J 68°/75° Location of Work: I Roof building 4, A to F, 1 to 19 J Operations Observed: J Application of a flood coat of hot asphalt covered with gravel ballast Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x I Specified Temperatures J AsphaLt Kettle Temperature:J 500° J +/- 25 F JApplication (EVT): J 450° J +/- 25 F Actual Temperatures Asphalt / Pitch Kettle Temperature: / Time Temp. JApplication (EVT): Time J Temp. Type III, Asphalt J1:30 PM 520° J Type III, Asphalt 2:15 PMJ 475° Distribution: (1) The Industrial Group/ Submitted by: Mr. John Welsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/mm Mr. Randy Pliler (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STJ-Z DR. · SUITE 400 * DALLAS. TX 75235 * -EL ]214] 350 5600 · FAX [2J4] 350 0019