Loading...
121 BP Phase 1-LR000118 GEOTECHNICAL AND ~ J:=:;J I'--'1 I I p ENVi~.ONMENTAL CONSULTANTS i CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The industnal Group REPORT NO. 150 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 01-18-00 ATTN: Mr. John Waish TECHNICIAN: P. Olegario CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: NWApproach on Canyon Dr. 10/130 2 Paving: NE Approach on Canyon Dr. 110/130 Design Information J Source of Concrete J Mix Identification J Specified Strength p.s.i. I Lattimore 42 4000 Test Results Set j Cylinder J J Age@Test J TotalLoad j Compressive J Average Strength No. I ID Date Tested lbs. Strength p.s.i, p.s.i. ~ !867 01-25-00 7 105690 3740 1867 02-15-00 28 1867 02-15-00 28 1867 Hoid 2 1868 01-25-00 7 82090 2900 1868 02-15-00 28 1868 02-15-00 28 i868 Hold Cylinder Data Set I Cylinder I Time of I Concrete Air Ticket Number No. ID Slump Sample Air Temp. Temp. Entrainment ! !867 4.00 8:30 AM 50 65 N/A 3097816 2 ~. 868 5.50 10:00 AM 58 64 N/A 3097829 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe, Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa/rt (1) City of Coppell/Eng~neenng Dept. (1) Bear Creek Construcbon/ , Mr. Brian Holdgate ....... ! ....... (1) Mr. Hank Metzger ; 2424 STUTZ DR SUITE 4ZZ · DALLAS TX 75235 · TEL [2'4~ 353 5~-~Z · FAX ~2;4] 3.53 GEOTECHNICAL AI~D r~ R i-1 I I p ENV'RONPIENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 151 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 0!-18-00 ATTN: Mr. John Walsh TECHNICIAN: P. Olegario CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Bldg. #2 Spandrel Panels 10/150 Design Information JSource of Concrete J Mix Identification I Specified Strength p.s.i. Lattimore 17 3500 Test Results Set J Cylinder J Age~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 1866 01-25-00 7 88320 3120 1866 02-15-00 28 1866 02-15-00 28 1866 Hold Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 1866 6.00 7:15 AM 46 64 N/A 3097812 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Cam pbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR · SJITE z:-' · DALLAS TX 7E23E * TEL [2'-'i 35C ~£3':, · FAX ;2'4] 350 33'g GEOTECNNICALAND G I~ I"1 LJ F=~ ENVIRONMENTAL CONSUL-ANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 151 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 01-18-00 ATTN: Mr. John Walsh TECHNICIAN: P. Olegario CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location ! Q~antity Represented 1 Bldg. #2 Spandrel Panels 10/150 Design Information Source of Concrete I Mix Identification i Specified Strength p.s.i. Latti_m_ore 17 3500 Test Results Set i Cylinder -- ! Age @ Total Load Compressive i Average Strength _ No. i ID , Date Tested__.J__ Test lbs. Strength p.s.i. Ii p.s.i. 1 1866 01- 25-00 7 88320 3120 1866 02-15-00 28 125490 4440 1866 02-15-00 28 132730 4690 4570 1866 Hold Cylinder Data I Set Cylinder i Time of ] Concrete Air ! Ticket i No. ID i Slump Sample Air Temp./ Temp. Entrainment I Number I ! 1 1866 6.00 7:15 AM 46 64 N/A 3097812 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEAJsa/rt Mr. Randy Pillar (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger GEOTECHNiCAL AND I~ F:=I I'-1 ! I p ENV'RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 150 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 01-18-00 ATTN: Mr. John Walsh TECHNICIAN: P. Olegario CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: NW Approach on Canyon Dr. 10/130 2 Paving: NE Approach on Canyon Dr. 110/130 Design Information I Source of Concrete I Mix Identification Specified Strength p.s.i. I 42 4000 Lattimore Test Results Set Cylinder Age @ Test Total Load Compressive I Average Strength No. ID Date Tested lbs. Strength p.s.i. I p.s.i. 1 1867 01-25-00 7 105690 3740 1867 02-15-00 28 128720 4550 1867 02-15-00 28 125010 4420 4490 1867 Hold 2 1868 01-25-00 7 82090 2900 1868 02-15-00 28 104520 3700 1868 02-15-00 28 109310 3870 3790 1868 03-14-00 56 Cylinder Data Set I Cylinder Time of Concrete Air I Ticket Number No. I ID Slump Sample Air Temp. Temp. Entrainment 1 1867 4.00 8:30 AM 50 65 N/A 3097816 2 1868 5.50 10:00 AM 58 64 N/A 3097829 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1 Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe. Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa/rt (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate ......... (1) Mr. Hank Metzger 2~24 S?UTZ DP,. · SU -E 4C~ * DALLAS. TX 7~23.~ · TEL [214] 35C .~600 · ~AX ?.14] 3.~0 £'~19 GEOTECHN;CAL .'-I~:) ~ F=:J I"-1 ENV O, ONMENTAL CONSULTANTS ~ CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 150 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 01-18-00 ATTN: Mr. John Walsh TECHNICIAN: P. Olegario CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location i Quantity Represented 1 Paving: NW Approach on Canyon Dr. 10/130 2 Paving: NE Approach on Canyon Dr. 110/130 Design Information ~ Source of Concrete I Mix Identification Specified Strength p.s.i. i Lattimore 42 4000 Test Results Set Cylinder I Age ~ Test I Total Load Compressive Average Strength No. ID I~ Date Tested I lbs. Strength p.s.i, p.s.i. 1 1867 01-25-00 7 105690 3740 1867 02-15-00 28 128720 4550 1867 02-15-00 28 125010 4420 4490 1867 Hold 2 1868 01-25-00 7 82090 2900 1868 02-15-00 28 104520 3700 1868 02-15-00 28 109310 3870 3790 1868 03-14-00 56 113940 4030 Cylinder Data Set Cylinder Time of Concrete Air ! Ticket Number No. ID Slump Sample Air Temp. Temp. Entrainment 1 1867 4.00 8:30 AM 50 65 N/A 3097816 ,, 2 1868 5.50 10:00 AM 58 64 N/A 3097829 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe. Inc./Mr. Charhe Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa/rt (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate . . (1) Mr. Hank Metzger 2424 STJ-Z DR SUITE 438 · DALLAS-. -X 7,~2.;5 · Tr-~ ]214' 250 560:' · FAX [2:4.'- 25.3 3319