Loading...
121 BP Phase 1-LR000107 GEOTECHNICALAND i ~ F::;I I~1 I I Fa EN¥1RONP~ENT^L CONSULTANTS i REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 137 P.O. Box 802047 REPORT DATE: 01-07-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 12-17-99 TECHNICIAN: T. Belew PAGE: 1 of 1 General COntractor: iWestcliffe, Inc. IWeath~'r Conditions: i Partly Cloudy [Roofing-:Contract0r:lM & G Roofing Temperature Range: I 43°/64° Location of Work: I Roof building 3, line A to F between 1 and 19 Operations Observed: IApplication of insulation board using screws and washer to attach to metal decking covered with 3 plys of fiber glass felt paper using hot asphalt to attach each ply. Cricket was piaced on south end of building. IWorkCompleted: I Insulation: 8,592 Sq.ft Membrane: 8,592 Sq.ft Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x I Specifiad Temperatures ' ' Asphalt Kettle Temperature:I 500° I+/- 25 F IApplication (EVT):I450o I +/-25 f Actual Temperatures Asphalt/PitchKettleTemperature: J Time TemP. lApplication(EVT): I Time ITemp. Type III, Asphaltl 10:30A 520° ~ Type III, Asphalt 11:00A 475° Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pillar BW/mm (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424. STUTZ DR. · SUITE 4.00 · E~ALL^S. TX 75;'35 · TEL [~14.] 350 S600 · FAX []14.] 350 001~) ........... GEOTECHNICAL AND i G F::J I'-1 I I F:::J ENVIRONMENTAL CONSULTANTS ! REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The industrial Group REPORT NO. 129 P.O. Box 802047 REPORT DATE: 01-07-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 12-06-99 TECHNICIAN: T. Belew PAGE: 1 of 1 J General Coptractor:. J Westcliffe, Inc. J Weather Conditions: .JP-Cloudy/Windy JRoofing Contractor:-~ JM & G Roofing Temperature Range: .i J 400~ 80° JLocafion'Of Work: JBuilding 2, Line D to F between 1 and 6 JOperations'.Observed: JApplication of 1" fesco board attached to metal deck using screws and washers covered with 3 plys of fiber glass felt paper using hot asphalt to attach each ply. JWork Completed: J Insulation: 4,352 Sq.ft Membrane: 4,352 Items Observed: Yes No Items Observed:' Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: × Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x* Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x J - Specified Temperatures '- ..-' J Asphalt Kettle Temperature:J 500° +/- 25 F JApplication (EVT): J 450° +/- 25 F ':' Actual Temperatures ... --.. Asphalt / Pitch Kettle Temperature: ) Time Temp. Application (EVT): Time Temp. Asphalt*J 10:00A 550~ Not being used o AsphaltJ 12:30P 525° Asphalt 12:45P 425° * Temperature was adjusted while on-site. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe, Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Mr. Randy Pliler Keith E. Atkins (1) City of Coppell/Building Inspections BW/mm (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SU:TE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ! J~ J=JJ I'-1 ENVIRONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 138 P.O. Box 802047 REPORT DATE: 01-07-00 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 12-21-99 TECHNICIAN: T. Belew PAGE: 1 of 1 Genera['Contractor:lWestcliffe, Inc. Weather:Conditions: J Partly Cloudy Roofing Contractor: IM & G Roofing ITemperature Range: I 34°/54° J Location of Work: I Buildings 2 and 3 roof A to F between 1 and 19. JOperatiOns Observed: #2 application of metal flashing around parameter and lead flashing at drains. #3 application of built up roofing was modified to reach down around parameter. Items Observed: Yes No Items Observed: Yes -No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x J Specified Temperatures J Asphalt Kettle Temperature:J 500° I+/- 25 f JApplication (EVT):I 45o0 I +/' 25 f ActuaJ Tempe:at,res -- Asphalt / Pitch Kettle Temperature: J Time ITemp. JApplication(EVT): [ Time JTemp. Type III, AsphaltJ 2:15 500° J Type III, Asphalt 2:30 450° Comments: Water was standing on north end of building and on east side of building. Column lines B-8 and C-2. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC, Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pillar BW/mm (1) Bear Creek Construction/ Mr. Brian Holdgate ~ (1) Mr. Hank Metzger ' - 242~'~;TUTZ DR. ~-" SUITE 403 · DALL,~S, TX 75235 · TEL [214]-3-.~'0 5600 · F,~X [214] 350 0019 ......