121 BP Phase 1-LR000106 (2) CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Gra~tbury, TX 76049 (817) 246-81}96 FAX (8171 246-5889
REPORT OF
STRUCTURAL STEEL/METAL ROOF DECK INSPECTION
Project: 121 Business Park, Building 5 Report No: 16122-0
Coppell, Texas Attention: Keith Atkins
Client: Reed Engineering Group Date of Service: 01-06-00
2424 Stutz. Suite 400
Dallas, TX 75235 Page I of 1
REPORT OF INSPECTION
Drawings utilized: Erection Prints/AWS D1.1-98
Locations/item inspected: Grid A-F/I-1 I
Discrepaucies/comments:
A visual inspection was conducted on the above reference project with results as follows:
Deck
I.) Side lap screws comply.
2.) Several puddle welds marked for non-compliance due to non-fusion of deck to joist. These
were corrected and now comply.
Structural
1.) Bridging previously marked for non-compliance now complies.
Contractor received copy of report.
Cindy Follansbee, CWI #99070901