REPORT Of SIEVE ANALYSIS
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 136
P.O. Box 802047 REPORT DATE: 12-30-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE SAMPLED: 12-07-99
TECHNICIAN: T. Belew
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Sample Description: Roof Ballast
U.S. Std. Percent Specification
Sieve Size Passing ASTM D1863
1" 100 100
3i4" 100 100
1/2" 95.9 90-100
3/8" 70.4 40-70
No. 4 7.3 0-15
No. 8 1.8 0-5
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ AE/mm
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
242-' S-JTZ DR. · SUITE 4.'_'.0 · DALLAS. T.'( 75225 ° TE- !2'4. 35C 5600
GEO-ECHNICAL AND I~ F::;I r~l I I F:~
ENViRONMEN-A- CONSUL-ANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 133
P.O. Box 802047 REPORT DATE: 12-30-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Welsh DATE OBSERVED: 12-15-99
TECHNICIAN: T. Belew
PAGE: 1 of 1
IGeneral Contractor: IWestcliffe, Inc. IWeather Conditions: I Clear
IRoofing Contractor:lM & G Roofing ITemperature Range: I 38°/58°
I Location of Work: I Building 3 roof, column line B to E and 1 to 19
IOperations Observed: IApplication of fesco board attached to metal decking using
screws and washers covered with 3 plys of fiber glass felt paper
using hot asphalt to attach each ply
IWork Completed: I Insulation: 13,056 Sq.ft
Membrane: 13,056 Sq.ft
Items Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x Debris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
iPull Test and/orAdhesion Test Perf, ormed: I x iAttachments: I x
I Specified Temperatures I
Asphalt Kettle Temperature:I 500° I +/- 25 F IApplication (EVT):I450° I +/- 25 F
Comments: Cricket was added on north end of building in Iow area.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson
(1) The Industrial Group/ Original Signed By
Mr. Mac McClure
(1) Campbell Associates/ Keith E. Atkins
Mr. Randy Pliler CV/mm
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2-'24 STUTZ DR · SUITE ~:: · DALL~'S -X ?E235 · TEL :214: 35:, 5,5:2 · FAX [2',.;] 350 C: '9
GEOTECHNICAL AND G F:;I r-1 I I p
Ei,,vi ~,ON"IENTAL CONSULTANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 132
P.O. Box 802047 REPORT DATE: 12-30-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Welsh DATE OBSERVED: 12-10-99
TECHNICIAN: T. Belew
PAGE: 1 of 1
iOeneral Contractor: iWestciiffe, inc. iWeather Conditions: [Partly Cloudy
IRoofing Contractor:lM & G Roofing ITemperature Range: 140° / 58:
ILocation of Work: Building 2 roof, A to F from 6.5 to 11
Building 3 roof, A to C from 1 to 19
IOperations Observed: Building 3: Application of 1" fesco board attached to metal
deck using screws and washers covered with 3 plys of fiber glass
felt paper using hot asphalt to attach each ply.
Building 2: Application of a flood coat of hot asphalt covered with gravel
ballast.
IWork Completed: Insulation: 5,600 Sq.ft Gravel: 16,319 Sq.ft.
Membrane: 5,600 Sq.ft
Items Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x Debris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
i u, Test and,'or Adhesion Test Performed: i I x Attachments: [ i x
Specified Temperatures
Asphalt Kettle Temperature:I 500= I +/- 25 F IApplication (EVT): I 450c I +/- 25 F
Actual Temperatures
Asphalt/Pitch Kettle Temperature: ) Time I Temp. IApplication (EVT): Time I Temp.
Type III, Asphalt/ 9:00 A I 520= I Not being
I
applied
Distribution: (1) The Industrial Group/Mr. John Walsh Submitted by:
(1) Gromatzky Dupree & Associates/
Mr. Bennett Foster REED ENGINEERING GROUP, INC.
(1) Westcliffe, Inc./Mr. Charlie Johnson
(1) The industrial Group/Mr. Mac McClure
(1) Campbell Associates/Mr. Randy Pillar Original Signed By
(1) Bear Creek Construction/
Mr. Brian Holdgate Keith E. Atkins
(1) Mr. Hank Metzger CV/mm
2-'24 STUTZ DR · SLITE -"22 · D-'~_&S TX 75225 · -EL ~214; 352 5533 · FAX :.2'-'] 350 .~."_.'9