Loading...
121 BP Phase 1-LR 991230 GEOTECH.",.iCAL AND r~ F=::I r-1 I I F~ ENv'RONP'E'~ITA~ C C N S b LTA.'xlT~ REPORT Of SIEVE ANALYSIS 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 136 P.O. Box 802047 REPORT DATE: 12-30-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE SAMPLED: 12-07-99 TECHNICIAN: T. Belew PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Sample Description: Roof Ballast U.S. Std. Percent Specification Sieve Size Passing ASTM D1863 1" 100 100 3i4" 100 100 1/2" 95.9 90-100 3/8" 70.4 40-70 No. 4 7.3 0-15 No. 8 1.8 0-5 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ AE/mm Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 242-' S-JTZ DR. · SUITE 4.'_'.0 · DALLAS. T.'( 75225 ° TE- !2'4. 35C 5600 GEO-ECHNICAL AND I~ F::;I r~l I I F:~ ENViRONMEN-A- CONSUL-ANTS REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 133 P.O. Box 802047 REPORT DATE: 12-30-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Welsh DATE OBSERVED: 12-15-99 TECHNICIAN: T. Belew PAGE: 1 of 1 IGeneral Contractor: IWestcliffe, Inc. IWeather Conditions: I Clear IRoofing Contractor:lM & G Roofing ITemperature Range: I 38°/58° I Location of Work: I Building 3 roof, column line B to E and 1 to 19 IOperations Observed: IApplication of fesco board attached to metal decking using screws and washers covered with 3 plys of fiber glass felt paper using hot asphalt to attach each ply IWork Completed: I Insulation: 13,056 Sq.ft Membrane: 13,056 Sq.ft Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x iPull Test and/orAdhesion Test Perf, ormed: I x iAttachments: I x I Specified Temperatures I Asphalt Kettle Temperature:I 500° I +/- 25 F IApplication (EVT):I450° I +/- 25 F Comments: Cricket was added on north end of building in Iow area. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler CV/mm (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-'24 STUTZ DR · SUITE ~:: · DALL~'S -X ?E235 · TEL :214: 35:, 5,5:2 · FAX [2',.;] 350 C: '9 GEOTECHNICAL AND G F:;I r-1 I I p Ei,,vi ~,ON"IENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 132 P.O. Box 802047 REPORT DATE: 12-30-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Welsh DATE OBSERVED: 12-10-99 TECHNICIAN: T. Belew PAGE: 1 of 1 iOeneral Contractor: iWestciiffe, inc. iWeather Conditions: [Partly Cloudy IRoofing Contractor:lM & G Roofing ITemperature Range: 140° / 58: ILocation of Work: Building 2 roof, A to F from 6.5 to 11 Building 3 roof, A to C from 1 to 19 IOperations Observed: Building 3: Application of 1" fesco board attached to metal deck using screws and washers covered with 3 plys of fiber glass felt paper using hot asphalt to attach each ply. Building 2: Application of a flood coat of hot asphalt covered with gravel ballast. IWork Completed: Insulation: 5,600 Sq.ft Gravel: 16,319 Sq.ft. Membrane: 5,600 Sq.ft Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x i u, Test and,'or Adhesion Test Performed: i I x Attachments: [ i x Specified Temperatures Asphalt Kettle Temperature:I 500= I +/- 25 F IApplication (EVT): I 450c I +/- 25 F Actual Temperatures Asphalt/Pitch Kettle Temperature: ) Time I Temp. IApplication (EVT): Time I Temp. Type III, Asphalt/ 9:00 A I 520= I Not being I applied Distribution: (1) The Industrial Group/Mr. John Walsh Submitted by: (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe, Inc./Mr. Charlie Johnson (1) The industrial Group/Mr. Mac McClure (1) Campbell Associates/Mr. Randy Pillar Original Signed By (1) Bear Creek Construction/ Mr. Brian Holdgate Keith E. Atkins (1) Mr. Hank Metzger CV/mm 2-'24 STUTZ DR · SLITE -"22 · D-'~_&S TX 75225 · -EL ~214; 352 5533 · FAX :.2'-'] 350 .~."_.'9