121 BP Phase 1-LR 991217 GEOTECHNICAL AND J~j J~J I--1 U P
ENVI.KONI~ENTAL CONSULTANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 128
P.O. Box 80:)047 REPORT DATE: 12-17-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 12-07-99
TECHNICIAN: T. Belew
PAGE: 1 of 1
J General Contractor:lWestcliffe, Inc. Weather Conditions:-J P-Cloudy/Windy
I Roofing Contractor:lM & G Roofing Temperature Range: I 40°/60°
Location of Work: J Roof building 2, line B.5 to D.5 between 6 and 11.
Operations Observed: Application of 1" fesco board attached to metal deck using
screws and washers covered with 3 plys of fiber glass felt paper
using hot asphault to attach each ply.
JWork Completed: J Insulation: 8,064 Sq.ft Cricket Sq.ft
Membrane: 8,064 Sq.ft Gravel: Sq.ft.
Items Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x Debris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
Pull Test and/or Adhesion Test Performed: x Attachments: x
I Specified Temper~.tures j
Asphalt Kettle Temperature:J 500° +/- 25 F JApplication (EVT): J 450° +/- 25 F
Actual Temperatures
Asphalt / Pitch Kettle Temperature: J Time LTemp. JApplication(EVT): Time ITeomp.
AsphaltJ 9:15A 525° J Not being used at this time
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromat7ky Dupree & Associates/
Mr. Bennett Foster REED ENGINEERING GROUP, INC.
(1) Westcliffe. Inc./Mr. Charlie Johnson
(1) The Industrial Group.."
Mr. Mac McClure Original Signed By
(1) Campbell Associates.."
Mr. Randy Pliler Keith E. Atkins
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept. KEAJmm
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger