121 BP Phase 1-LR 991213 CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Granbury. TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
STRUCTURAL STEEL ERECTION INSPECTION
Project: 121 Business Park Report No: 15896-9
COppell, Texas Attention: Keith Atkins
Client: Reed Engineering Group Date of Service: 12-13-99
2424 Stutz, Suite 400
Dallas, TX 75235 Page I of 1
REPORT OF L'~[YPECTION
Drawings ntilized: Structural Prints
l.ocations/item inspected: Building 4 and 5
Discrepancies/comments:
Building "4"
I.) Anchor bolts have been properly tensioned.
2.) Joist girder to panel - Welds comply.
3.) Joist girder to column cap - Welds comply.
4.) Joist to joist girder - Welds comply.
*5.) Column to precast panels - Welds incomplete.
*6.) Perimeter angle - Not all installed as of this visit.
*7.) Joist bridging has been installed but not all anchored to wall.
Building "5"
1.) Anchor bolts have been properly tensioned.
2.) Joist girder to panel - Welds comply.
3.) Joist girder to column cap - Welds comply.
4.) Joist to joist girder - Welds comply.
*5.) Column to precast panels - Erector is welding these connections at this time.
*6.) Joist bridging - Not all installed as of this visit.
*7.) Perimeter angle - Not installed.
*Open Items
Technician ~f_~ntract Inspection Service
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client