Loading...
121 BP Phase 1-LR 991213 CONTRA CT INSPECTION SER VICE, Inc. 4305 Glenwood Ct. Granbury. TX 76049 (817) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: 121 Business Park Report No: 15896-9 COppell, Texas Attention: Keith Atkins Client: Reed Engineering Group Date of Service: 12-13-99 2424 Stutz, Suite 400 Dallas, TX 75235 Page I of 1 REPORT OF L'~[YPECTION Drawings ntilized: Structural Prints l.ocations/item inspected: Building 4 and 5 Discrepancies/comments: Building "4" I.) Anchor bolts have been properly tensioned. 2.) Joist girder to panel - Welds comply. 3.) Joist girder to column cap - Welds comply. 4.) Joist to joist girder - Welds comply. *5.) Column to precast panels - Welds incomplete. *6.) Perimeter angle - Not all installed as of this visit. *7.) Joist bridging has been installed but not all anchored to wall. Building "5" 1.) Anchor bolts have been properly tensioned. 2.) Joist girder to panel - Welds comply. 3.) Joist girder to column cap - Welds comply. 4.) Joist to joist girder - Welds comply. *5.) Column to precast panels - Erector is welding these connections at this time. *6.) Joist bridging - Not all installed as of this visit. *7.) Perimeter angle - Not installed. *Open Items Technician ~f_~ntract Inspection Service This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client