121 BP Phase 1-LR 991207 (2) GEOTECHN~CAL AND G I=~ r-1 I I I=~
ENVIRONMENTAL CONSULT.aNTS
CONCRETE CYLINDER TEST REPORT
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO: Catellus Development Corporation REPORT NO. 60
4545 Fuller Drive. Suite 100 REG PROJECT NO. 5167
Irving, Texas 75038 SAMPLE DATE: 12-07-99
ATTN: Mr. Robert McCann TECHNICIAN: P. Houston
CONTRACTOR: Pacific Builders. Inc.
Location of Sample
Set Number I Location '~',, I Quantity Represented
1 Paving: 300'N. 60'E of SE Bldg. Corner 60/250
2 Paving: 100'N. 20'E of SE Bldg. Corner 150/250
3 Paving: 75'N. 80'E of SE Bldg. Corner 250/250
Design Information
! Source of Concrete I Mix Identification I Specified Strength p.s.i.
i Butler 202 3500
Test Results
Set ICylinderI t Age@ ITotalLoad I Compressive IAverageStrength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 808 12-14-99 7 127450 4510
808 01-04-00 28
808 01-04-00 28
808 Hold
2 809 12-14-99 7 104130 3680
809 01-04-00 28
809 01-04-00 28
809 Hold
3 810 12-14-99 7 130210 4610
810 01-04-00 28
810 01-04-00 28
810 Hold
2-'2-' ST[,TZ DR SJ TE 422 · D;.L-~'.S -'X -~2-:~ · TEL :2'4' 3£~ 5533 · -':AX 12'z-: 3-2.2 C:C:IS
Cylinder Data
Set I::' cylindei~::::~l i~':':l':':':Time°f ' i Concrete..I.:i::::' Air..t . Ticket
No..' ~::~'iD:.:': i.:$((~rn 's~Ple:'.-AirTemp.- :..Temp.-:: i Entrainment'l:. Number -
1 808 5.75 6:30 AM 45 66 5.0 6724
2 809 7.00 8:00 AM 57 69 5.5 6733
3 810 6.25 11:45 AM 60 68 5.0 6744
Distribution: (1) Catellus Development Corporation/ Submitted by:
Mr. Robert McCann
(1 Pacific Builders, Inc./Mr. Jim Kinder REED ENGINEERING GROUP, INC.
(1 Potters Concrete/Mr. Daniel Lewis
(1 AECC, Inc./Mr. Matt Rader Original Signed By
(1 Gromatzky Dupree & Associates/
Mr. Scott McCrary Keith E. Atkins
(1 Brockette*Davis*Drake/ KEA/cdl/rt
Mr. Allen Lowes
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone