121 BP Phase 1-LR 991123 CONTRA CT INSPECTION SER VICE, Inc. 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: 121 Business Park Report No: 15711-9 Coppell, Texas Attention: Keith Atkins Client: Reed Engineering Group Date of Service: 11-23-99 2424 Stutz, Suite 400 Dallas, TX 75235 Page 1 of 1 I . - --- -*--*- '*::'*:'*.::-**-::.-**:*:**::*-:" ':' :::*:* '*:* **:-::.- ::,:,: :-:,:,.::,:,.,:~.: ":'*:, ":'**:::-" '," ':*.':: ':':"-. :- ........-.':'... ::-:-.--":'--.'" '"' ~ REPORT OF INSPECTIO-'q l)rawings utilized: Structural Prints Locations/item inspected: As noted. Discrepancies/comments: Reinspection of report dated 11-17-99. Building ~2 Item 2 - Joist girder to column - All connections now welded and comply. Item 5 - Joist bridging - Bridging now installed. Item 6 - Deck edge angle splices - Connections now comply. Initial inspection, Building #2 1.) Metal roof deck puddle welds were found to be in compliance. 2.) Side lap screws have been installed. Initial inspection, Building #3 * 1.) Anchor bolts - Could not inspect due to water in leave outs. *2.) Joist girder to panel pockets - Additional welding needed due to weld size. 3.) Joist girder to column cap - Welds and bearing comply. 4.) Joist to panel - Welds and bearing comply. 5.) Joist to joist girder - Welds and bearing comply. *6.) Perimeter angle not installed as of this visit. *Open Items Larry G. Peel, CWI #89120661 /~'~ ~' V~ 7 d--/¢ ~,~ff ~~') Technician Contract Inspection Service This report is for the exclusive use of our client and shall not be modified or reproduced without ~n'ritten approval from said client