Loading...
121 BP Phase 1-LR 991117 (3) GEOTECHNICAL AND - I~i R I'-1 ENVIRONMENTAL CONSULTANTS i CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 123 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 11-17-99 ATTN: Mr. John Walsh TECHNICIAN: R. Bullion CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Bldg. #4 Panels: #18 and #43 20/100 Design Information ISource of Concrete I Mix Identification I Specified Strength p.s.i. Lattimore 17 3000 Test Results s, j Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 241 11-24-99 7 94970 3360 241 11-24-99 7 101000 3570 3470 241 12-15-99 28 114620 4050 241 12-15-99 28 135280 4790 4420 Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 241 5.00 9:30 AM 62 70 N/A 67-079993 c, .... ~ by: Distribution: (1) The Industrial Group/ ~,~,b .~L.~ Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 242~ STUTZ DR SOiTE 4~*- · DALLAS TX ~523~ · TEL ~21-'~ 357 _=6CC · FAX [2'~] GECTECHNICAL zND ~ FR r-1 U F::= ENV'~.ON~,ENTAL CCNSULT;*NT5 CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 7{;1 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 123 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 11-17-99 ATTN: Mr. John Walsh TECHNICIAN: R. Bullion CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented ! 1 Bldg. #4 Panels: #18 and #43 20/100 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 17 3000 Test Results Set Cylinder I I Age @ Total Load Compressive Average Strength No. ID I Date Tested i Test lbs. Strength p.s.i. . p.s.i. 1 241 11-24-99 7 94970 3360 241 11-24-99 7 101000 3570 3470 241 12-15-99 28 241 12-15-99 28 Cylinder Data Set I Cylinder I Timeof I Concrete I Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 241 5.00 9:30 AM 62 70 N/A 67-079993 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger :-:~4 STUTZ L'.=, 5Ui~F-:7:' · E'/,__AS -'r-z;;20 · ;E_;Z~-Z'[ ~'7; .--'.'Z7 · =:.'<[Z'z[.'-=Z:L'[-