121 BP Phase 1-LR 991116 GEOTECHNICAL AND G R I"-I U F~ ENV:RONMENTAL CONSULTANTS i REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 100 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10-07-99 TECHNICIAN: G. Ortiz PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: Building 2 (751 Canyon Dr) Panels 9, 10, 20, 24, 33 and 37. Building 7 (701 Canyon Dr) Panels 7, 30, 34, 57 and 53. Reference Plans or Notes Used: Sheet S4.01 List Deviations Noted: 1 ) Panel 7: Missing chairs. 2) Panel 30: Corner bars not tied and chairs are missing. 3) Panel 34: Corner bars at top not tied and chairs are missing. X JThe noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 242'~ S'TUTZ DR. · Sb -E 4CO * ~ALLAS. TX 75235 · Tr-~ 'ZI4' 250 5~CO * :AX [2 4] 35,0 00.9 GEOTECHNICALAND , G J==J I'--1 I I ~ ENVIRONMENTAL CONSULTANTS j REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 101 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Welsh DATE OBSERVED: 10-08-99 TECHNICIAN: V. McManis PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: J Paving: 30-110'W of building 3 between lines 5 to 18. J Reference Plans or Notes Used: J Civil drawings. J List Deviations Noted: J All splices in center of pour spliced 6" to 10" maximum. Spacing varies from 14" to 34". Chairs missing. The noted deviations were reported to: Superindent ! X JThe noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Welsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ ~R. · SL -E 400 · DALLAS -X 7S235 · TE_ [~- 4] 350 5600 · FAX [2.4] 350 3019 GEOTECHNICAL AND . G F=J I"-I U F~ ENVIRONMENTAL CONSULTANTS ' REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 108 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10-21-99 TECHNICIAN: G. Ortiz PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Building 3 (751 Canyon Drive) Panels: 10, 15, 28, 31,38 41, 46, 49, 56, 62, 63, and 64. J Reference Plans or Notes Used: J Sheets S4.01 J List Deviations Noted: J Panels: 41, 46, 49, 15 and 28: Size of panels are not the same as shown on drawings. The noted deviations were reported to: Superintendent J X JThe noted deviations were not corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-'24 StJ-Z ~R. · SL -E 4gO · ~ALLAS. TX 75235 · TEL :21-~' 350 5.~3 · =AX [2!4] 350 O019 GEOTECHNICAL AND J~ F~J f"l U ~ ENVIRONMENTAL CONSULTANTS · REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 99 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10-06-99 TECHNICIAN: E. Rico PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: J Paving: 60-140'S and 360-820'W from N.E. corner of property. Reference Plans or Notes Used: I Sheet SC-2 X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SJ -E 400 · DALLAS. TX 75235 · TE_ [2 4] 350 5600 · FAX [2~4] 350 C019 GEOTECHNICAL AND I~ F:~ r-1 I I p ENW~ONMENTaL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 102 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, texas 75380-2047 REG PROJECT NO. 5607 ATTN: ,Mr. John Walsh DATE OBSERVED: 10-12-9-9 TECHNICIAN: R. Bullion PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. I Items Observed: I Fire lane: North and east sides of building 5. Reference Plans or Notes Used: I Civil drawings. X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Origi,al Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STU-Z DR. · SUITE 4¢C · DALLAS. TX 75235 · TEL [2 4] 350 5600 · FAX ~21-~] 350 0OI9 GECTECHNiCALAND E~ I::=1 r'-i I I F== ENV RONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 103 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10-14-99 TECHNICIAN: T. Belew PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Building 2 (751 Canyon Dr) Panels: 16, 27 and 30. Building 4 (651 Canyon Dr) Panels: 2, 4, 5, 24, 30, 32 33, 36, 37, 38,39, 41, 42, 44, 45, 46, 53, 54, 56, 58, 60, 61,62 and 64. Reference Plans or Notes Used: I Structural drawings. X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associa[es/ REED ENGINEERING GROUP, lNG. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SJ:-E 4C'3 · D'~.LLAS -X 75235 · TEL [*.,'4] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND I I:~ F~ r~ L..J F~ ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 107 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10/20/99 TECHNICIAN: O. Thornton PAGE: 1 of 1 CONTRACTOR: Westcliffe, nc. Items Observed: I Paving: 0-60'S, 0-660'E of S.W. corner of building 2. Reference Plans or Notes Used: I Civil drawings. X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1 The Industrial Group/ Submitted by: Mr. John Walsh (1 Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1 Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1 The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2'~2-' STU-Z DR. · SL:TE 400 · DALLAS. -X 75235 · TEL '214' 350 S6'2,0 · =AX [2'4] 350 0Cl9 j GI:OTECNNICAL AN:) J ~ J=;JJ r'-I LJ J~-- ENV P, ONHENTAL CONSULTANTS ' REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 110 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10-27-99 TECHNICIAN: R. Bullion PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Paving: 60-120'S at 450'E and 325'W of the SE corner of building 4. J Reference Plans or Notes Used: J Civil drawings. J X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1)The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 S-UTZ DR. · SJITE 400 · ~ALLAS TX 75235 · -EL [2 4] 350 5600 · FAX r. 214:350 0019 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 104 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Wa!sh DATE OBSERVED: 10-15-99 TECHNICIAN: R. Bullion PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Building 4, slab on grade: lines B to E between 12.5 and 15. Reference Plans or Notes Used: I Structural drawings. X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 S~UTZ DR · SU'-E 450 · DALLAS. -X 7S235 · TE_ [2 4] 350 5600 · FAX :21,~] 350 00") GEOTECHNICAL AND G J==J r-'l U F:= ENV'RONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 105 P.O. Box 802047 REPORT DATE: 11-16-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Wa!sh DATE OBSERVED: 10-20-99 TECHNICIAN: O. Thornton PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: J Building 2, (751 Canyon Dr) Panels 41,43 and 44. J Reference Plans or Notes Used: J Structural drawings. I X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1)The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 S-UTZ DR * SU -E 4g0 * DALLAS. -X 752.~5 · TE_ [Z 4] 353 5600 * FAX :;14] 350 00 9