121 BP Phase 1-LR 991116 GEOTECHNICAL AND G R I"-I U F~
ENV:RONMENTAL CONSULTANTS i
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 100
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 10-07-99
TECHNICIAN: G. Ortiz
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
J Items Observed: Building 2 (751 Canyon Dr) Panels 9, 10, 20, 24, 33 and
37.
Building 7 (701 Canyon Dr) Panels 7, 30, 34, 57 and 53.
Reference Plans or Notes Used: Sheet S4.01
List Deviations Noted: 1 ) Panel 7: Missing chairs.
2) Panel 30: Corner bars not tied and chairs are missing.
3) Panel 34: Corner bars at top not tied and chairs are
missing.
X JThe noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
242'~ S'TUTZ DR. · Sb -E 4CO * ~ALLAS. TX 75235 · Tr-~ 'ZI4' 250 5~CO * :AX [2 4] 35,0 00.9
GEOTECHNICALAND , G J==J I'--1 I I ~
ENVIRONMENTAL CONSULTANTS j
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 101
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Welsh DATE OBSERVED: 10-08-99
TECHNICIAN: V. McManis
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: J Paving: 30-110'W of building 3 between lines 5 to 18.
J Reference Plans or Notes Used: J Civil drawings.
J List Deviations Noted: J All splices in center of pour spliced 6" to 10" maximum.
Spacing varies from 14" to 34". Chairs missing.
The noted deviations were reported to: Superindent
! X JThe noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Welsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STUTZ ~R. · SL -E 400 · DALLAS -X 7S235 · TE_ [~- 4] 350 5600 · FAX [2.4] 350 3019
GEOTECHNICAL AND . G F=J I"-I U F~
ENVIRONMENTAL CONSULTANTS '
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 108
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 10-21-99
TECHNICIAN: G. Ortiz
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
J Items Observed: J Building 3 (751 Canyon Drive) Panels: 10, 15, 28, 31,38
41, 46, 49, 56, 62, 63, and 64.
J Reference Plans or Notes Used: J Sheets S4.01
J List Deviations Noted: J Panels: 41, 46, 49, 15 and 28: Size of panels are
not the same as shown on drawings.
The noted deviations were reported to: Superintendent
J X JThe noted deviations were not corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2-'24 StJ-Z ~R. · SL -E 4gO · ~ALLAS. TX 75235 · TEL :21-~' 350 5.~3 · =AX [2!4] 350 O019
GEOTECHNICAL AND J~ F~J f"l U ~
ENVIRONMENTAL CONSULTANTS ·
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 99
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 10-06-99
TECHNICIAN: E. Rico
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: J Paving: 60-140'S and 360-820'W from
N.E. corner of property.
Reference Plans or Notes Used: I Sheet SC-2
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STUTZ DR. · SJ -E 400 · DALLAS. TX 75235 · TE_ [2 4] 350 5600 · FAX [2~4] 350 C019
GEOTECHNICAL AND I~ F:~ r-1 I I p
ENW~ONMENTaL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 102
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, texas 75380-2047 REG PROJECT NO. 5607
ATTN: ,Mr. John Walsh DATE OBSERVED: 10-12-9-9
TECHNICIAN: R. Bullion
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
I Items Observed: I Fire lane: North and east sides of building 5.
Reference Plans or Notes Used: I Civil drawings.
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Origi,al Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STU-Z DR. · SUITE 4¢C · DALLAS. TX 75235 · TEL [2 4] 350 5600 · FAX ~21-~] 350 0OI9
GECTECHNiCALAND E~ I::=1 r'-i I I F==
ENV RONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 103
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 10-14-99
TECHNICIAN: T. Belew
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: I Building 2 (751 Canyon Dr) Panels: 16, 27 and 30.
Building 4 (651 Canyon Dr) Panels: 2, 4, 5, 24, 30, 32
33, 36, 37, 38,39, 41, 42, 44, 45, 46, 53, 54, 56, 58, 60,
61,62 and 64.
Reference Plans or Notes Used: I Structural drawings.
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associa[es/ REED ENGINEERING GROUP, lNG.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STUTZ DR. · SJ:-E 4C'3 · D'~.LLAS -X 75235 · TEL [*.,'4] 350 5600 · FAX [214] 350 0019
GEOTECHNICAL AND I I:~ F~ r~ L..J F~
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 107
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 10/20/99
TECHNICIAN: O. Thornton
PAGE: 1 of 1
CONTRACTOR: Westcliffe, nc.
Items Observed: I Paving: 0-60'S, 0-660'E of S.W. corner of building 2.
Reference Plans or Notes Used: I Civil drawings.
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Distribution: (1 The Industrial Group/ Submitted by:
Mr. John Walsh
(1 Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1 Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1 The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2'~2-' STU-Z DR. · SL:TE 400 · DALLAS. -X 75235 · TEL '214' 350 S6'2,0 · =AX [2'4] 350 0Cl9 j
GI:OTECNNICAL AN:) J ~ J=;JJ r'-I LJ J~--
ENV P, ONHENTAL CONSULTANTS '
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 110
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 10-27-99
TECHNICIAN: R. Bullion
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
J Items Observed: J Paving: 60-120'S at 450'E and 325'W of the SE corner
of building 4.
J Reference Plans or Notes Used: J Civil drawings.
J X JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Distribution: (1)The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 S-UTZ DR. · SJITE 400 · ~ALLAS TX 75235 · -EL [2 4] 350 5600 · FAX r. 214:350 0019
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 104
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Wa!sh DATE OBSERVED: 10-15-99
TECHNICIAN: R. Bullion
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: I Building 4, slab on grade: lines B to E between 12.5
and 15.
Reference Plans or Notes Used: I Structural drawings.
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 S~UTZ DR · SU'-E 450 · DALLAS. -X 7S235 · TE_ [2 4] 350 5600 · FAX :21,~] 350 00")
GEOTECHNICAL AND G J==J r-'l U F:=
ENV'RONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 105
P.O. Box 802047 REPORT DATE: 11-16-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Wa!sh DATE OBSERVED: 10-20-99
TECHNICIAN: O. Thornton
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: J Building 2, (751 Canyon Dr) Panels 41,43 and 44.
J Reference Plans or Notes Used: J Structural drawings.
I X JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Distribution: (1)The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ BW/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 S-UTZ DR * SU -E 4g0 * DALLAS. -X 752.~5 · TE_ [Z 4] 353 5600 * FAX :;14] 350 00 9